Student Health and Counseling Center
Create an identifiable and easily accessible facility that welcomes members of our diverse campus community and conveys a commitment to quality care, innovation in technical, medical and clinical services, student support and well being. This facility aligns with the missions and values of the UCR campus, the Division of Student Affairs, Student Health Services, Counseling and Psychological Services, Student Affairs Case Management, and The Well that support student retention and success through optimization of emotional and physical health, through direct service, promotion, prevention, education, student engagement, and provision of resources and referrals.
Project Scope:
- The new SHCC will further improve health, counseling and wellness services currently provided at the Campus
- It will offer integrated and holistic care in a welcoming and student-centered environment, with increased medical and mental health providers on staff
- The design of the SHCC should address the students’ experience
- In addition to providing medical and mental health services, the new facility is envisioned as a destination within the UCR Campus
- While the current Student Health Center is relatively insular, the new SHCC should be more visible and become an integral part of the UCR Campus
- Different programs within the SHCC will share common resources and they will be administered accordingly
- The SHCC building space should provide opportunities for collaboration, be flexible and have room for growth
- To best serve the significant number of commuter students. t the SHCC should be a comfortable and welcoming space that accommodates these students while waiting for appointments
Student Health & Counseling Center Construction Updates
-
950578- STUDENT HEALTH & COUNSELING CENTER CONSTRUCTION ADVISORY #46
Current Weeks
Construction Activities
Location
Activity
Equipment Used
Anticipated Disturbance
Project Site
Continue Flooring installation
various hand tools,
Low level of pedestrian noise including occasional hammering.
Project Site
Continued low voltage installation
various hand tools,
Low level of pedestrian noise including occasional hammering.
Project Site
Casework and countertop installation
various hand tools,
Low level of pedestrian noise including occasional hammering.
Project Site
Continuing Landscape Irrigation Installation
Various hand tools
Low level of pedestrian noise.
Project Site
Parking lot asphalt fog coat
Asphalt truck, various hand tools
Moderate level of engine noise and low levels of pedestrian noise.
Contractor Parking Area
Continued parking for contractor and sub-contractors; storage of equipment
Contractor vehicles
Low level of vehicle and pedestrian noise.
Contractor Offices
Continued office use
Office Equipment and Furniture
Low level of pedestrian noise
Week of August 7
Construction Activities
Location
Activity
Equipment Used
Anticipated Disturbance
Project Site
Continue Flooring installation
various hand tools,
Low level of pedestrian noise including occasional hammering.
Project Site
Continued low voltage and electrical installation
various hand tools,
Low level of pedestrian noise including occasional hammering.
Project Site
Casework and countertop installation
various hand tools,
Low level of pedestrian noise including occasional hammering.
Project Site
Elevator Finishes Installation
various hand tools,
Low level of pedestrian noise including occasional hammering.
Project Site
Continuing Landscape Irrigation Installation
Various hand tools
Low level of pedestrian noise.
Project Site
Parking lot striping
Truck, various hand tools
Moderate level of engine noise and low levels of pedestrian noise.
Contractor Parking Area
Continued parking for contractor and sub-contractors; storage of equipment
Contractor vehicles
Low level of vehicle and pedestrian noise.
Contractor Offices
Continued office use
Office Equipment and Furniture
Low level of pedestrian noise
Current and Upcoming Anticipated Closures
The following shutdown(s)/ closures are anticipated as indicated below. Updates to this schedule will be released weekly in the Project Construction Advisories until the work is complete. Please contact Dexter Galang with any specific questions or concerns at dexter.galang@ucr.edu.
Description
Location
Duration & Date
Description and Impacted Buildings/ Facilities
None at this Time
-
-
-
Student Health & Counseling Center Project Job Site
July 31, 2023:
-
950578- STUDENT HEALTH & COUNSELING CENTER CONSTRUCTION ADVISORY #45
Current Weeks
Construction Activities
Location
Activity
Equipment Used
Anticipated Disturbance
Project Site
Mechanical Screen installation on roof
Crane, Delivery Trucks, various hand tools
Moderate level of engine noise including occasional hammering.
Project Site
Casework and countertop installation
various hand tools,
Low level of pedestrian noise including occasional hammering.
Project Site
Elevator Finishes Installation
various hand tools,
Low level of pedestrian noise including occasional hammering.
Project Site
Continued low voltage and electrical installation
various hand tools,
Low level of pedestrian noise including occasional hammering.
Project Site
Continuing Landscape Irrigation Installation
Various hand tools
Low level of pedestrian noise.
Project Site
Parking lot asphalt
Asphalt truck, various hand tools
Moderate level of engine noise and low levels of pedestrian noise.
Contractor Parking Area
Continued parking for contractor and sub-contractors; storage of equipment
Contractor vehicles
Low level of vehicle and pedestrian noise.
Contractor Offices
Continued office use
Office Equipment and Furniture
Low level of pedestrian noise
Week of July 17
Construction Activities
Location
Activity
Equipment Used
Anticipated Disturbance
Project Site
Continue Flooring installation
various hand tools,
Low level of pedestrian noise including occasional hammering.
Project Site
Continued low voltage and electrical installation
various hand tools,
Low level of pedestrian noise including occasional hammering.
Project Site
Casework and countertop installation
various hand tools,
Low level of pedestrian noise including occasional hammering.
Project Site
Elevator Finishes Installation
various hand tools,
Low level of pedestrian noise including occasional hammering.
Project Site
Continuing Landscape Irrigation Installation
Various hand tools
Low level of pedestrian noise.
Project Site
Parking lot asphalt
Asphalt truck, various hand tools
Moderate level of engine noise and low levels of pedestrian noise.
Contractor Parking Area
Continued parking for contractor and sub-contractors; storage of equipment
Contractor vehicles
Low level of vehicle and pedestrian noise.
Contractor Offices
Continued office use
Office Equipment and Furniture
Low level of pedestrian noise
Current and Upcoming Anticipated Closures
The following shutdown(s)/ closures are anticipated as indicated below. Updates to this schedule will be released weekly in the Project Construction Advisories until the work is complete. Please contact Dexter Galang with any specific questions or concerns at dexter.galang@ucr.edu.
Description
Location
Duration & Date
Description and Impacted Buildings/ Facilities
North Sidewalk
Sidewalk at Linden from Dundee- Glasgow access road to Parking Lot 21 driveway
Until Mid-July
The north sidewalk will be closed and construction fence line relocated to allow for equipment to access the north landscape area. Traffic speed limits will be lower and cones will divide the street for safety proposes.
Controlled access of Eastbound Lane of Linden Street
Linden Street eastbound lane at the north elevation of the building
Week of July 10, exact day TBD
A crane will be lifting equipment screening panels to the roof. The crane will be staged in Parking Lot 23 and unloading semitrucks parked on the eastbound lane of Linden. This will reduce Linden down to one lane. Traffic control spotters will be on site at each end during this activity. The crane will return two weeks after to demobilize materials from the roof.
-
950578- STUDENT HEALTH & COUNSELING CENTER CONSTRUCTION ADVISORY #44
Current Weeks
Construction Activities
Location
Activity
Equipment Used
Anticipated Disturbance
Project Site
Casework installation
various hand tools,
Low level of pedestrian noise including occasional hammering.
Project Site
Elevator Finishes Installation
various hand tools,
Low level of pedestrian noise including occasional hammering.
Project Site
Exterior Paving installation
various hand and power tools,
Low level of pedestrian noise including occasional hammering. Occasional sawing of concrete pavers causing moderate level of noise
Project Site
Landscape Irrigation Installation
Various hand tools
Low level of pedestrian noise.
Project Site
Parking lot asphalt
Excavator, asphalt truck, various hand tools
Moderate level of engine noise and low levels of pedestrian noise.
Contractor Parking Area
Continued parking for contractor and sub-contractors; storage of equipment
Contractor vehicles
Low level of vehicle and pedestrian noise.
Contractor Offices
Continued office use
Office Equipment and Furniture
Low level of pedestrian noise
Week of July 3
Construction Activities
Location
Activity
Equipment Used
Anticipated Disturbance
Project Site
Continued Casework installation
various hand tools,
Low level of pedestrian noise including occasional hammering.
Project Site
Continued Elevator Finishes Installation
various hand tools,
Low level of pedestrian noise including occasional hammering.
Project Site
Continued Exterior Paving installation
various hand and power tools,
Low level of pedestrian noise including occasional hammering. Occasional sawing of concrete pavers causing moderate level of noise
Project Site
Continued Landscape Irrigation Installation
Various hand tools
Low level of pedestrian noise.
Project Site
Continued Parking lot asphalt
Excavator, asphalt truck, various hand tools
Moderate level of engine noise and low levels of pedestrian noise.
Contractor Parking Area
Continued parking for contractor and sub-contractors; storage of equipment
Contractor vehicles
Low level of vehicle and pedestrian noise.
Contractor Offices
Continued office use
Office Equipment and Furniture
Low level of pedestrian noise
Current and Upcoming Anticipated Closures
The following shutdown(s)/ closures are anticipated as indicated below. Updates to this schedule will be released weekly in the Project Construction Advisories until the work is complete. Please contact Dexter Galang with any specific questions or concerns at dexter.galang@ucr.edu.
Description
Location
Duration & Date
Description and Impacted Buildings/ Facilities
North Sidewalk
Sidewalk at Linden from Dundee- Glasgow access road to Parking Lot 21 driveway
Until Mid-July
The north sidewalk will be closed and construction fence line relocated to allow for equipment to access the north landscape area. Traffic speed limits will be lower and cones will divide the street for safety proposes.
Controlled access of Eastbound Lane of Linden Street
Linden Street eastbound lane at the north elevation of the building
Week of July 10, exact day TBD
A crane will be lifting equipment screening panels to the roof. The crane will be staged in Parking Lot 23 and unloading semitrucks parked on the eastbound lane of Linden. This will reduce Linden down to one lane. Traffic control spotters will be on site at each end during this activity. The crane will return two weeks after to demobilize materials from the roof.
-
950578- STUDENT HEALTH & COUNSELING CENTER CONSTRUCTION ADVISORY #43
Current Weeks
Construction Activities
Location
Activity
Equipment Used
Anticipated Disturbance
Project Site
Restroom tile installation
various hand tools,
Low level of pedestrian noise including occasional hammering, and backup alarms.
Project Site
Low Voltage Installation
various hand tools,
Low level of pedestrian noise including occasional hammering, and backup alarms.
Project Site
Drywall, Tape, Mud and Paint
various hand tools,
Low level of pedestrian noise including occasional hammering, and backup alarms.
Project Site
Exterior Landscaping
Excavator, various hand tools
Moderate level of pedestrian noise including occasional hammering, and backup alarms.
Contractor Parking Area
Continued parking for contractor and sub-contractors; storage of equipment
Contractor vehicles
Low level of vehicle and pedestrian noise.
Contractor Offices
Continued office use
Office Equipment and Furniture
Low level of pedestrian noise
Week of May 1
Construction Activities
Location
Activity
Equipment Used
Anticipated Disturbance
Project Site
Continuation of restroom tile installation
various hand tools,
Low level of pedestrian noise including occasional hammering, and backup alarms.
Project Site
Continuation of Low Voltage Installation
various hand tools,
Low level of pedestrian noise including occasional hammering, and backup alarms.
Project Site
Exterior Landscaping
Excavator, various hand tools
Moderate level of pedestrian noise including occasional hammering, and backup alarms.
Project Site
Parking Lot Demolition
Excavator, Sawcutter, Jackhammer
Moderate level of noise including running engines, and backup alarms with high levels of short sustained noise from jackhammering and sawcutting.
Contractor Parking Area
Continued parking for contractor and sub-contractors; storage of equipment
Contractor vehicles
Low level of vehicle and pedestrian noise.
Contractor Offices
Continued office use
Office Equipment and Furniture
Low level of pedestrian noise
Current and Upcoming Anticipated Closures
The following shutdown(s)/ closures are anticipated as indicated below. Updates to this schedule will be released weekly in the Project Construction Advisories until the work is complete. Please contact Dexter Galang with any specific questions or concerns at dexter.galang@ucr.edu.
Description
Location
Duration & Date
Description and Impacted Buildings/ Facilities
North Sidewalk
Sidewalk at Linden from Dundee- Glasgow access road to Parking Lot 21 driveway
Until Mid-June
The north sidewalk will be closed and construction fence line relocated to allow for equipment to access the north landscape area. Traffic speed limits will be lower and cones will divide the street for safety proposes.
-
950578- STUDENT HEALTH & COUNSELING CENTER CONSTRUCTION ADVISORY #42
Current Weeks
Construction Activities
Location
Activity
Equipment Used
Anticipated Disturbance
Project Site
Restroom tile installation
various hand tools,
Low level of pedestrian noise including occasional hammering, and backup alarms.
Project Site
Low Voltage Installation
various hand tools,
Low level of pedestrian noise including occasional hammering, and backup alarms.
Project Site
Drywall, Tape, Mud and Paint
various hand tools,
Low level of pedestrian noise including occasional hammering, and backup alarms.
Project Site
Exterior Landscaping
Excavator, various hand tools
Moderate level of pedestrian noise including occasional hammering, and backup alarms.
Contractor Parking Area
Continued parking for contractor and sub-contractors; storage of equipment
Contractor vehicles
Low level of vehicle and pedestrian noise.
Contractor Offices
Continued office use
Office Equipment and Furniture
Low level of pedestrian noise
Week of April 24
Construction Activities
Location
Activity
Equipment Used
Anticipated Disturbance
Project Site
Continuation of restroom tile installation
various hand tools,
Low level of pedestrian noise including occasional hammering, and backup alarms.
Project Site
Continuation of Low Voltage Installation
various hand tools,
Low level of pedestrian noise including occasional hammering, and backup alarms.
Project Site
Exterior Landscaping
Excavator, various hand tools
Moderate level of pedestrian noise including occasional hammering, and backup alarms.
Contractor Parking Area
Continued parking for contractor and sub-contractors; storage of equipment
Contractor vehicles
Low level of vehicle and pedestrian noise.
Contractor Offices
Continued office use
Office Equipment and Furniture
Low level of pedestrian noise
Current and Upcoming Anticipated Closures
The following shutdown(s)/ closures are anticipated as indicated below. Updates to this schedule will be released weekly in the Project Construction Advisories until the work is complete. Please contact Dexter Galang with any specific questions or concerns at dexter.galang@ucr.edu.
Description
Location
Duration & Date
Description and Impacted Buildings/ Facilities
North Sidewalk
Sidewalk at Linden from Dundee- Glasgow access road to Parking Lot 21 driveway
Until Mid-June
The north sidewalk will be closed and construction fence line relocated to allow for equipment to access the north landscape area. Traffic speed limits will be lower and cones will divide the street for safety proposes.
-
950578- STUDENT HEALTH & COUNSELING CENTER CONSTRUCTION ADVISORY #41
Current Weeks
Construction Activities
Location
Activity
Equipment Used
Anticipated Disturbance
Project Site
Continuation of Exterior wall foam insulation and stucco installation
Rough terrain lift, delivery trucks, various hand and power tools
Moderate level of engine and pedestrian noise including occasional High level of noise from hammering and backup alarms.
Project Site
Continuation of Exterior wall caulking and weatherproofing
Rough terrain lift, delivery trucks, various hand and power tools
Moderate level of engine and pedestrian noise including occasional High level of noise from hammering and backup alarms.
Project Site
Exterior Landscaping Installation
Excavator, various hand tools
Moderate level of pedestrian noise including occasional hammering, and backup alarms.
Contractor Parking Area
Continued parking for contractor and sub-contractors; storage of equipment
Contractor vehicles
Low level of vehicle and pedestrian noise.
Contractor Offices
Continued office use
Office Equipment and Furniture
Low level of pedestrian noise
Week of April 10, 2023
Construction Activities
Location
Activity
Equipment Used
Anticipated Disturbance
Project Site
Continuation of Exterior wall foam insulation and stucco installation
Rough terrain lift, delivery trucks, various hand and power tools
Moderate level of engine and pedestrian noise including occasional High level of noise from hammering and backup alarms.
Project Site
Continuation of Exterior wall caulking and weatherproofing
Rough terrain lift, delivery trucks, various hand and power tools
Moderate level of engine and pedestrian noise including occasional High level of noise from hammering and backup alarms.
Project Site
Continuation of Exterior Landscaping Installation
Excavator, various hand tools
Moderate level of pedestrian noise including occasional hammering, and backup alarms.
Contractor Parking Area
Continued parking for contractor and sub-contractors; storage of equipment
Contractor vehicles
Low level of vehicle and pedestrian noise.
Contractor Offices
Continued office use
Office Equipment and Furniture
Low level of pedestrian noise
Current and Upcoming Anticipated Shutdowns/ Closures
The following shutdowns/ closures are anticipated as indicated below. Updates to this schedule will be released weekly in the Project Construction Advisories until the work is complete. Please contact Dexter Galang with any specific questions or concerns at dexter.galang@ucr.edu.
Description
Location
Duration & Date
Description and Impacted Buildings/ Facilities
North Sidewalk
Sidewalk at Linden from Dundee- Glasgow access road to Parking Lot 21 driveway
2 months
The north sidewalk will be closed and construction fence line relocated to allow for equipment to access the north landscape area. Traffic speed limits will be lower and cones will divide the street for safety proposes.
-
950578- STUDENT HEALTH & COUNSELING CENTER CONSTRUCTION ADVISORY #40
Current Weeks
Construction Activities
Location
Activity
Equipment Used
Anticipated Disturbance
Project Site
Continuation of Exterior wall EIFS installation
Rough terrain lift, delivery trucks, various hand and power tools
Moderate level of engine and pedestrian noise including occasional High level of noise from hammering and backup alarms.
Project Site
Continuation of Exterior wall caulking and weatherproofing
Rough terrain lift, delivery trucks, various hand and power tools
Moderate level of engine and pedestrian noise including occasional High level of noise from hammering and backup alarms.
Project Site
Continuation of interior wall drywall, tape, mud and paint
Various hand tools, scissor lift
Moderate level of pedestrian noise including occasional hammering, electric sawing and backup alarms.
Project Site
Continuation of interior MEP installation
Various hand tools, scissor lift
Moderate level of pedestrian noise including occasional hammering, and backup alarms.
Project Site
Continuation of Exterior Glass Installation
Various hand tools, scissor lift
Moderate level of pedestrian noise including occasional hammering, and backup alarms.
Contractor Parking Area
Continued parking for contractor and sub-contractors; storage of equipment
Contractor vehicles
Low level of vehicle and pedestrian noise.
Contractor Offices
Continued office use
Office Equipment and Furniture
Low level of pedestrian noise
Week of March 20, 2022
Construction Activities
Location
Activity
Equipment Used
Anticipated Disturbance
Project Site
Continuation of Exterior wall EIFS installation
Rough terrain lift, delivery trucks, various hand and power tools
Moderate level of engine and pedestrian noise including occasional High level of noise from hammering and backup alarms.
Project Site
Continuation of installation of trellis steel
Rough terrain lift, delivery trucks, various hand and power tools
Moderate level of engine and pedestrian noise including occasional High level of noise from hammering and backup alarms.
Project Site
Continuation of Exterior wall caulking and weatherproofing
Rough terrain lift, delivery trucks, various hand and power tools
Moderate level of engine and pedestrian noise including occasional High level of noise from hammering and backup alarms.
Project Site
Continuation of interior wall drywall, tape, mud and paint
Various hand tools, scissor lift
Moderate level of pedestrian noise including occasional hammering, electric sawing and backup alarms.
Project Site
Continuation of interior MEP installation
Various hand tools, scissor lift
Moderate level of pedestrian noise including occasional hammering, and backup alarms.
Project Site
Continuation of Exterior Glass Installation
Various hand tools, scissor lift
Moderate level of pedestrian noise including occasional hammering, and backup alarms.
Contractor Parking Area
Continued parking for contractor and sub-contractors; storage of equipment
Contractor vehicles
Low level of vehicle and pedestrian noise.
Contractor Offices
Continued office use
Office Equipment and Furniture
Low level of pedestrian noise
Current and Upcoming Anticipated Shutdowns/ Closures
The following shutdowns/ closures are anticipated as indicated below. Updates to this schedule will be released weekly in the Project Construction Advisories until the work is complete. Please contact Dexter Galang with any specific questions or concerns at dexter.galang@ucr.edu.
Description
Location
Duration & Date
Description and Impacted Buildings/ Facilities
None at this time
-
950578- STUDENT HEALTH & COUNSELING CENTER CONSTRUCTION ADVISORY #39
Current Weeks
Construction Activities
Location
Activity
Equipment Used
Anticipated Disturbance
Project Site
Continuation of Exterior wall foam insulation and stucco installation
Rough terrain lift, delivery trucks, various hand and power tools
Moderate level of engine and pedestrian noise including occasional High level of noise from hammering and backup alarms.
Project Site
Continuation of Exterior wall caulking and weatherproofing
Rough terrain lift, delivery trucks, various hand and power tools
Moderate level of engine and pedestrian noise including occasional High level of noise from hammering and backup alarms.
Project Site
Continuation of interior wall drywall, tape, mud and paint
Various hand tools, scissor lift
Moderate level of pedestrian noise including occasional hammering, electric sawing and backup alarms.
Project Site
Continuation of interior MEP installation
Various hand tools, scissor lift
Moderate level of pedestrian noise including occasional hammering, and backup alarms.
Project Site
Continuation of Exterior Glass Installation
Various hand tools, scissor lift
Moderate level of pedestrian noise including occasional hammering, and backup alarms.
Contractor Parking Area
Continued parking for contractor and sub-contractors; storage of equipment
Contractor vehicles
Low level of vehicle and pedestrian noise.
Contractor Offices
Continued office use
Office Equipment and Furniture
Low level of pedestrian noise
Week of February 27, 2022
Construction Activities
Location
Activity
Equipment Used
Anticipated Disturbance
Project Site
Continuation of Exterior wall foam insulation and stucco installation
Rough terrain lift, delivery trucks, various hand and power tools
Moderate level of engine and pedestrian noise including occasional High level of noise from hammering and backup alarms.
Project Site
Continuation of Exterior wall caulking and weatherproofing
Rough terrain lift, delivery trucks, various hand and power tools
Moderate level of engine and pedestrian noise including occasional High level of noise from hammering and backup alarms.
Project Site
Continuation of interior wall drywall, tape, mud and paint
Various hand tools, scissor lift
Moderate level of pedestrian noise including occasional hammering, electric sawing and backup alarms.
Project Site
Continuation of interior MEP installation
Various hand tools, scissor lift
Moderate level of pedestrian noise including occasional hammering, and backup alarms.
Project Site
Continuation of Exterior Glass Installation
Various hand tools, scissor lift
Moderate level of pedestrian noise including occasional hammering, and backup alarms.
Contractor Parking Area
Continued parking for contractor and sub-contractors; storage of equipment
Contractor vehicles
Low level of vehicle and pedestrian noise.
Contractor Offices
Continued office use
Office Equipment and Furniture
Low level of pedestrian noise
Current and Upcoming Anticipated Shutdowns/ Closures
The following shutdowns/ closures are anticipated as indicated below. Updates to this schedule will be released weekly in the Project Construction Advisories until the work is complete. Please contact Dexter Galang with any specific questions or concerns at dexter.galang@ucr.edu.
Description
Location
Duration & Date
Description and Impacted Buildings/ Facilities
Non at this time
-
950578- STUDENT HEALTH & COUNSELING CENTER CONSTRUCTION ADVISORY #38
Current Weeks
Construction Activities
Location
Activity
Equipment Used
Anticipated Disturbance
Project Site
Continuation of Exterior wall foam insulation and stucco installation
Rough terrain lift, delivery trucks, various hand and power tools
Moderate level of engine and pedestrian noise including occasional High level of noise from hammering and backup alarms.
Project Site
Continuation of Exterior wall caulking and weatherproofing
Rough terrain lift, delivery trucks, various hand and power tools
Moderate level of engine and pedestrian noise including occasional High level of noise from hammering and backup alarms.
Project Site
Continuation of interior wall drywall, tape, mud and paint
Various hand tools, scissor lift
Moderate level of pedestrian noise including occasional hammering, electric sawing and backup alarms.
Project Site
Continuation of interior MEP installation
Various hand tools, scissor lift
Moderate level of pedestrian noise including occasional hammering, and backup alarms.
Project Site
Continuation of Exterior Glass Installation
Various hand tools, scissor lift
Moderate level of pedestrian noise including occasional hammering, and backup alarms.
Contractor Parking Area
Continued parking for contractor and sub-contractors; storage of equipment
Contractor vehicles
Low level of vehicle and pedestrian noise.
Contractor Offices
Continued office use
Office Equipment and Furniture
Low level of pedestrian noise
Week of February 13, 2022
Construction Activities
Location
Activity
Equipment Used
Anticipated Disturbance
Project Site
Continuation of Exterior wall foam insulation and stucco installation
Rough terrain lift, delivery trucks, various hand and power tools
Moderate level of engine and pedestrian noise including occasional High level of noise from hammering and backup alarms.
Project Site
Continuation of Exterior wall caulking and weatherproofing
Rough terrain lift, delivery trucks, various hand and power tools
Moderate level of engine and pedestrian noise including occasional High level of noise from hammering and backup alarms.
Project Site
Continuation of interior wall drywall, tape, mud and paint
Various hand tools, scissor lift
Moderate level of pedestrian noise including occasional hammering, electric sawing and backup alarms.
Project Site
Continuation of interior MEP installation
Various hand tools, scissor lift
Moderate level of pedestrian noise including occasional hammering, and backup alarms.
Project Site
Continuation of Exterior Glass Installation
Various hand tools, scissor lift
Moderate level of pedestrian noise including occasional hammering, and backup alarms.
Contractor Parking Area
Continued parking for contractor and sub-contractors; storage of equipment
Contractor vehicles
Low level of vehicle and pedestrian noise.
Contractor Offices
Continued office use
Office Equipment and Furniture
Low level of pedestrian noise
Current and Upcoming Anticipated Shutdowns/ Closures
The following shutdowns/ closures are anticipated as indicated below. Updates to this schedule will be released weekly in the Project Construction Advisories until the work is complete. Please contact Dexter Galang with any specific questions or concerns at dexter.galang@ucr.edu.
Description
Location
Duration & Date
Description and Impacted Buildings/ Facilities
Electrical Shutdown
Linden Street and Dundee Glasgow intersection
Saturday, February 18
Connection to Campus permanent power.
Will require a 4 hour weekend power shutdown. The effected buildings include those in the Corp Yard area (Facilities, Mail, Fleet Buildings). Fire watch will be in place.
Access at the intersection of Linden and Dundee Access Road may be limited at times however, flag people will be on site to guide traffic.
-
950578- STUDENT HEALTH & COUNSELING CENTER CONSTRUCTION ADVISORY #37
Current Weeks
Construction Activities
Location
Activity
Equipment Used
Anticipated Disturbance
Project Site
Continuation of exterior wall framing
Rough terrain lift, delivery trucks, scaffolding, various hand and power tools
Moderate level of engine and pedestrian noise including occasional High level of noise from hammering and backup alarms.
Project Site
Continuation of Storefront Installation
Rough terrain lift, delivery trucks, scaffolding, various hand and power tools
Moderate level of pedestrian noise including occasional High level of noise from hammering.
Project Site
Continuation of interior wall framing
Various hand tools, scissor lift
Moderate level of pedestrian noise including occasional hammering, electric sawing and backup alarms.
Project Site
Continuation of interior MEP installation
Various hand tools, scissor lift
Moderate level of pedestrian noise including occasional hammering, and backup alarms.
Project Site
Continuation of Drywall installation
Various hand tools, scissor lift, rolling scaffolds
Moderate level of pedestrian noise including occasional hammering, and backup alarms.
Project Site
Continuation of Interior Painting
Various hand tools, scissor lift, rolling scaffolds
Moderate level of pedestrian noise including occasional backup alarms.
Contractor Parking Area
Continued parking for contractor and sub-contractors; storage of equipment
Contractor vehicles
Low level of vehicle and pedestrian noise.
Contractor Offices
Continued office use
Office Equipment and Furniture
Low level of pedestrian noise
Week of January 23, 2022
Construction Activities
Location
Activity
Equipment Used
Anticipated Disturbance
Project Site
Continuation of exterior wall framing
Rough terrain lift, delivery trucks, scaffolding, various hand and power tools
Moderate level of engine and pedestrian noise including occasional High level of noise from hammering and backup alarms.
Project Site
Continuation of Storefront Installation
Rough terrain lift, delivery trucks, scaffolding, various hand and power tools
Moderate level of pedestrian noise including occasional High level of noise from hammering.
Project Site
Continuation of interior wall framing
Various hand tools, scissor lift
Moderate level of pedestrian noise including occasional hammering, electric sawing and backup alarms.
Project Site
Continuation of interior MEP installation
Various hand tools, scissor lift
Moderate level of pedestrian noise including occasional hammering, and backup alarms.
Project Site
Continuation of Drywall installation
Various hand tools, scissor lift, rolling scaffolds
Moderate level of pedestrian noise including occasional hammering, and backup alarms.
Project Site
Continuation of Interior Painting
Various hand tools, scissor lift, rolling scaffolds
Moderate level of pedestrian noise including occasional backup alarms.
Contractor Parking Area
Continued parking for contractor and sub-contractors; storage of equipment
Contractor vehicles
Low level of vehicle and pedestrian noise.
Contractor Offices
Continued office use
Office Equipment and Furniture
Low level of pedestrian noise
Current and Upcoming Anticipated Closures
The following shutdown(s)/ closures are anticipated as indicated below. Updates to this schedule will be released weekly in the Project Construction Advisories until the work is complete. Please contact Dexter Galang with any specific questions or concerns at dexter.galang@ucr.edu.
Description
Location
Duration & Date
Description and Impacted Buildings/ Facilities
Electrical Shutdown
Linden Street and Dundee Glasgow intersection
Sunday, January 29
Connection to Campus permanent power. This activity will require a 8 hour weekend power shutdown that will affect the Corp Yard Area and a 4 hour power outage to TAPS and EH&S.
Access along this road may be limited at times however, flag people will be on site to guide traffic.
-
950578- STUDENT HEALTH & COUNSELING CENTER CONSTRUCTION ADVISORY #36
Current Weeks
Construction Activities
Location
Activity
Equipment Used
Anticipated Disturbance
Project Site
Continuation of exterior wall framing
Rough terrain lift, delivery trucks, scaffolding, various hand and power tools
Moderate level of engine and pedestrian noise including occasional High level of noise from hammering and backup alarms.
Project Site
Storefront Installation
Rough terrain lift, delivery trucks, scaffolding, various hand and power tools
Moderate level of pedestrian noise including occasional High level of noise from hammering.
Project Site
Continuation of interior wall framing
Various hand tools, scissor lift
Moderate level of pedestrian noise including occasional hammering, electric sawing and backup alarms.
Project Site
Continuation of interior MEP installation
Various hand tools, scissor lift
Moderate level of pedestrian noise including occasional hammering, and backup alarms.
Project Site
Continuation of Drywall installation
Various hand tools, scissor lift, rolling scaffolds
Moderate level of pedestrian noise including occasional hammering, and backup alarms.
Project Site
Painting
Various hand tools, scissor lift, rolling scaffolds
Moderate level of pedestrian noise including occasional backup alarms.
Contractor Parking Area
Continued parking for contractor and sub-contractors; storage of equipment
Contractor vehicles
Low level of vehicle and pedestrian noise.
Contractor Offices
Continued office use
Office Equipment and Furniture
Low level of pedestrian noise
Week of January 11, 2022
Construction Activities
Location
Activity
Equipment Used
Anticipated Disturbance
Project Site
Continuation of exterior wall framing
Rough terrain lift, delivery trucks, scaffolding, various hand and power tools
Moderate level of engine and pedestrian noise including occasional High level of noise from hammering and backup alarms.
Project Site
Storefront Installation
Rough terrain lift, delivery trucks, scaffolding, various hand and power tools
Moderate level of pedestrian noise including occasional High level of noise from hammering.
Project Site
Continuation of interior wall framing
Various hand tools, scissor lift
Moderate level of pedestrian noise including occasional hammering, electric sawing and backup alarms.
Project Site
Continuation of interior MEP installation
Various hand tools, scissor lift
Moderate level of pedestrian noise including occasional hammering, and backup alarms.
Project Site
Continuation of Drywall installation
Various hand tools, scissor lift, rolling scaffolds
Moderate level of pedestrian noise including occasional hammering, and backup alarms.
Project Site
Painting
Various hand tools, scissor lift, rolling scaffolds
Moderate level of pedestrian noise including occasional backup alarms.
Contractor Parking Area
Continued parking for contractor and sub-contractors; storage of equipment
Contractor vehicles
Low level of vehicle and pedestrian noise.
Contractor Offices
Continued office use
Office Equipment and Furniture
Low level of pedestrian noise
Current and Upcoming Anticipated Closures
The following shutdown(s)/ closures are anticipated as indicated below. Updates to this schedule will be released weekly in the Project Construction Advisories until the work is complete. Please contact Dexter Galang with any specific questions or concerns at dexter.galang@ucr.edu.
Description
Location
Duration & Date
Description and Impacted Buildings/ Facilities
Electrical Shutdown
Linden Street and Dundee Glasgow intersection
Sunday, January 29
Connection to Campus permanent power. This activity will require a 8 hour weekend power shutdown that will affect the Corp Yard Area and a 4 hour power outage to TAPS and EH&S.
Access along this road may be limited at times however, flag people will be on site to guide traffic.
-
950578- STUDENT HEALTH & COUNSELING CENTER CONSTRUCTION ADVISORY #35
Current Weeks
Construction Activities
Location
Activity
Equipment Used
Anticipated Disturbance
Project Site
Continuation of exterior wall framing
Rough terrain lift, delivery trucks, scaffolding, various hand and power tools
Moderate level of engine and pedestrian noise including occasional High level of noise from hammering and backup alarms.
Project Site
Storefront Installation
Rough terrain lift, delivery trucks, scaffolding, various hand and power tools
Moderate level of pedestrian noise including occasional High level of noise from hammering.
Project Site
Continuation of roofing installation
Rough terrain lift, delivery trucks, various hand and power tools
Moderate level of pedestrian noise including occasional High level of noise from hammering, sawing and backup alarms.
Project Site
Continuation of interior wall framing
Various hand tools, scissor lift
Moderate level of pedestrian noise including occasional hammering, electric sawing and backup alarms.
Project Site
Continuation of interior MEP installation
Various hand tools, scissor lift
Moderate level of pedestrian noise including occasional hammering, and backup alarms.
Project Site
Continuation of Drywall installation
Various hand tools, scissor lift, rolling scaffolds
Moderate level of pedestrian noise including occasional hammering, and backup alarms.
Contractor Parking Area
Continued parking for contractor and sub-contractors; storage of equipment
Contractor vehicles
Low level of vehicle and pedestrian noise.
Contractor Offices
Continued office use
Office Equipment and Furniture
Low level of pedestrian noise
Week of December 26, 2022
Construction Activities
Location
Activity
Equipment Used
Anticipated Disturbance
Project Site
Continuation of exterior wall framing
Rough terrain lift, delivery trucks, scaffolding, various hand and power tools
Moderate level of engine and pedestrian noise including occasional High level of noise from hammering and backup alarms.
Project Site
Continuation of Storefront Installation
Rough terrain lift, delivery trucks, scaffolding, various hand and power tools
Moderate level of pedestrian noise including occasional High level of noise from hammering.
Project Site
Continuation of roofing installation
Rough terrain lift, delivery trucks, various hand and power tools
Moderate level of pedestrian noise including occasional High level of noise from hammering, sawing and backup alarms.
Project Site
Continuation of interior wall framing
Various hand tools, scissor lift
Moderate level of pedestrian noise including occasional hammering, electric sawing and backup alarms.
Project Site
Continuation of interior MEP installation
Various hand tools, scissor lift
Moderate level of pedestrian noise including occasional hammering, and backup alarms.
Project Site
Continuation of Drywall installation
Various hand tools, scissor lift, rolling scaffolds
Moderate level of pedestrian noise including occasional hammering, and backup alarms.
Contractor Parking Area
Continued parking for contractor and sub-contractors; storage of equipment
Contractor vehicles
Low level of vehicle and pedestrian noise.
Contractor Offices
Continued office use
Office Equipment and Furniture
Low level of pedestrian noise
Current and Upcoming Anticipated Closures
The following shutdown(s)/ closures are anticipated as indicated below. Updates to this schedule will be released weekly in the Project Construction Advisories until the work is complete. Please contact Dexter Galang with any specific questions or concerns at dexter.galang@ucr.edu.
Description
Location
Duration & Date
Description and Impacted Buildings/ Facilities
Electrical Shutdown
Linden Street and Dundee Glasgow intersection
Saturday, January 28
Connection to Campus permanent power. Will require a 4 to 8 hour weekend power shutdown. The effected buildings include those in the Corp Yard area (Facilities, Mail, Fleet Buildings)
Access along this road may be limited at times however, flag people will be on site to guide traffic.
-
950578- STUDENT HEALTH & COUNSELING CENTER CONSTRUCTION ADVISORY #34
Current Weeks
Construction Activities
Location
Activity
Equipment Used
Anticipated Disturbance
Project Site
Exterior wall framing
Rough terrain lift, delivery trucks, various hand and power tools
Moderate level of engine and pedestrian noise including occasional High level of noise from hammering and backup alarms.
Project Site
Roofing installation
Rough terrain lift, delivery trucks, various hand and power tools
Moderate level of pedestrian noise including occasional High level of noise from hammering, sawing and backup alarms.
Project Site
Continuation of interior wall framing
Various hand tools, scissor lift
Moderate level of pedestrian noise including occasional hammering, electric sawing and backup alarms.
Project Site
Continuation of interior MEP installation
Various hand tools, scissor lift
Moderate level of pedestrian noise including occasional hammering, and backup alarms.
Project Site
Drywall installation
Various hand tools, scissor lift
Moderate level of pedestrian noise including occasional hammering, and backup alarms.
Contractor Parking Area
Continued parking for contractor and sub-contractors; storage of equipment
Contractor vehicles
Low level of vehicle and pedestrian noise.
Contractor Offices
Continued office use
Office Equipment and Furniture
Low level of pedestrian noise
Week of December 12, 2022
Construction Activities
Location
Activity
Equipment Used
Anticipated Disturbance
Project Site
Continuation of Exterior wall framing
Rough terrain lift, delivery trucks, various hand and power tools
Moderate level of engine and pedestrian noise including occasional High level of noise from hammering and backup alarms.
Project Site
Continuation of Roofing installation
Rough terrain lift, delivery trucks, various hand and power tools
Moderate level of pedestrian noise including occasional High level of noise from hammering, sawing and backup alarms.
Project Site
Continuation of interior wall framing
Various hand tools, scissor lift
Moderate level of pedestrian noise including occasional hammering, electric sawing and backup alarms.
Project Site
Continuation of interior MEP installation
Various hand tools, scissor lift
Moderate level of pedestrian noise including occasional hammering, and backup alarms.
Project Site
Continuation of Drywall installation
Various hand tools, scissor lift
Moderate level of pedestrian noise including occasional hammering, and backup alarms.
Contractor Parking Area
Continued parking for contractor and sub-contractors; storage of equipment
Contractor vehicles
Low level of vehicle and pedestrian noise.
Contractor Offices
Continued office use
Office Equipment and Furniture
Low level of pedestrian noise
Current and Upcoming Anticipated Closures
The following shutdown(s)/ closures are anticipated as indicated below. Updates to this schedule will be released weekly in the Project Construction Advisories until the work is complete. Please contact Dexter Galang with any specific questions or concerns at dexter.galang@ucr.edu.
Description
Location
Duration & Date
Description and Impacted Buildings/ Facilities
Electrical Shutdown
Linden Street and Dundee Glasgow intersection
Saturday, January 28
Connection to Campus permanent power. Will require a 4 to 8 hour weekend power shutdown. The effected buildings include those in the Corp Yard area (Facilities, Mail, Fleet Buildings)
Access along this road may be limited at times however, flag people will be on site to guide traffic.
-
950578- STUDENT HEALTH & COUNSELING CENTER CONSTRUCTION ADVISORY #33
Current Weeks
Construction Activities
Location
Activity
Equipment Used
Anticipated Disturbance
Project Site
North perimeter wall installation
Crane Truck, delivery trucks, various hand and power tools
The crane will be located at the Linden Entrance to Facilities Services and Fleet Services. Temporary access to and from the Facilities and Fleet Yards will be from the west gate in Lot 23 and the entry off of Watkins Drive. The Crane will be offloading wall panels from trucks that will be occupying one lane of Linden Street. Flag people will be onsite to control traffic.
Moderate level of engine and pedestrian noise including occasional High level of noise from hammering and backup alarms.
Project Site
Continuation of Metal Stud Wall Framing
Various hand and power tools, aerial device
Moderate level of pedestrian noise including occasional High level of noise from hammering, sawing and backup alarms.
Project Site
Continuation of HVAC equipment installation
Various hand tools, aerial device
Moderate level of pedestrian noise including occasional hammering and backup alarms.
Project Site
Miscellaneous Concrete Work
Various hand tools, jack hammer
Moderate level of pedestrian noise with occasion high levels of noise from jackhammering.
Project Site
Continuation of in-wall utility installation
Various hand tools, aerial device
Moderate level of pedestrian noise including occasional hammering and backup alarms.
Contractor Parking Area
Continued parking for contractor and sub-contractors; storage of equipment
Contractor vehicles
Low level of vehicle and pedestrian noise.
Contractor Offices
Continued office use
Office Equipment and Furniture
Low level of pedestrian noise
Week of November 14, 2022
Construction Activities
Location
Activity
Equipment Used
Anticipated Disturbance
Project Site
West perimeter wall installation
Crane Truck, delivery trucks, various hand and power tools
The crane will be located within the construction fence line and will be offloading wall panels from trucks that will be occupying one lane of the Dundee- Glasgow Access Road. Flag people will be onsite to control traffic.
Moderate level of engine and pedestrian noise including occasional High level of noise from hammering and backup alarms.
Project Site
Continuation of Metal Stud Wall Framing
Various hand and power tools, aerial device
Moderate level of pedestrian noise including occasional hammering, sawing and backup alarms.
Project Site
Miscellaneous Concrete Work
Various hand tools, jack hammer
Moderate level of pedestrian noise with occasion high levels of noise from jackhammering.
Project Site
Continuation of HVAC equipment installation
Various hand tools, aerial device
Moderate level of pedestrian noise including occasional hammering and backup alarms.
Project Site
Continuation of in wall utility installation
Various hand tools, aerial device
Moderate level of pedestrian noise including occasional hammering and backup alarms.
Contractor Parking Area
Continued parking for contractor and sub-contractors; storage of equipment
Contractor vehicles
Low level of vehicle and pedestrian noise.
Contractor Offices
Continued office use
Office Equipment and Furniture
Low level of pedestrian noise
Current and Upcoming Anticipated Closures
The following shutdown(s)/ closures are anticipated as indicated below. Updates to this schedule will be released weekly in the Project Construction Advisories until the work is complete. Please contact Dexter Galang with any specific questions or concerns at dexter.galang@ucr.edu.
Description
Location
Duration & Date
Impacted Buildings/ Facilities
North Exterior Wall Panel Crane
Pick
Linden Entrance to Facilities Services and Fleet Services (see Map A below)
November 9-
November 10
The crane will be located at Linden Entrance to Facilities Services and Fleet Services. Temporary access to and from the Corp Yard will be from the entrance off of Watkins Avenue. The Crane will be offloading wall panels from trucks that will be occupying one lane of Linden Street. Flag people will be onsite to control traffic.
West Exterior Wall Panel Crane
Pick
Dundee- Glasgow Access Road (see Map B below)
November 14-17
The crane will be located within the construction fence line and will be offloading wall panels from trucks that will be occupying one lane of the Dundee- Glasgow Access Road. Flag people will be onsite to control traffic.
-
950578- STUDENT HEALTH & COUNSELING CENTER CONSTRUCTION ADVISORY #32
Current Weeks
Construction Activities
Location
Activity
Equipment Used
Anticipated Disturbance
Project Site
North perimeter wall installation
Crane Truck, delivery trucks, various hand and power tools
The crane will be located at the Linden Entrance to Facilities Services and Fleet Services. Temporary access to and from the Facilities and Fleet Yards will be from the west gate in Lot 23 and the entry off of Watkins Drive. The Crane will be offloading wall panels from trucks that will be occupying one lane of Linden Street. Flag people will be onsite to control traffic.
Moderate level of engine and pedestrian noise including occasional High level of noise from hammering and backup alarms.
Project Site
Continuation of Metal Stud Wall Framing
Various hand and power tools, aerial device
Moderate level of pedestrian noise including occasional High level of noise from hammering, sawing and backup alarms.
Project Site
Continuation of HVAC equipment installation
Various hand tools, aerial device
Moderate level of pedestrian noise including occasional hammering and backup alarms.
Project Site
Continuation of in-wall utility installation
Various hand tools, aerial device
Moderate level of pedestrian noise including occasional hammering and backup alarms.
Contractor Parking Area
Continued parking for contractor and sub-contractors; storage of equipment
Contractor vehicles
Low level of vehicle and pedestrian noise.
Contractor Offices
Continued office use
Office Equipment and Furniture
Low level of pedestrian noise
Week of November 7, 2022
Construction Activities
Location
Activity
Equipment Used
Anticipated Disturbance
Project Site
West perimeter wall installation
Crane Truck, delivery trucks, various hand and power tools
The crane will be located within the construction fence line and will be offloading wall panels from trucks that will be occupying one lane of the Dundee- Glasgow Access Road. Flag people will be onsite to control traffic.
Moderate level of engine and pedestrian noise including occasional High level of noise from hammering and backup alarms.
Project Site
Continuation of Metal Stud Wall Framing
Various hand and power tools, aerial device
Moderate level of pedestrian noise including occasional hammering, sawing and backup alarms.
Project Site
Continuation of HVAC equipment installation
Various hand tools, aerial device
Moderate level of pedestrian noise including occasional hammering and backup alarms.
Project Site
Continuation of in wall utility installation
Various hand tools, aerial device
Moderate level of pedestrian noise including occasional hammering and backup alarms.
Contractor Parking Area
Continued parking for contractor and sub-contractors; storage of equipment
Contractor vehicles
Low level of vehicle and pedestrian noise.
Contractor Offices
Continued office use
Office Equipment and Furniture
Low level of pedestrian noise
Current and Upcoming Anticipated Shutdowns/ Closures
The following shutdown(s)/ closures are anticipated as indicated below. Updates to this schedule will be released weekly in the Project Construction Advisories until the work is complete. Please contact Dexter Galang with any specific questions or concerns at dexter.galang@ucr.edu.
Description
Location
Duration & Date
Impacted Buildings/ Facilities
North Exterior Wall Panel Crane
Pick
Linden Entrance to Facilities Services and Fleet Services (see Map A below)
November 3-
November 9
The crane will be located at Linden Entrance to Facilities Services and Fleet Services. Temporary access to and from the Corp Yard will be from the entrance off of Watkins Avenue. The Crane will be offloading wall panels from trucks that will be occupying one lane of Linden Street. Flag people will be onsite to control traffic.
West Exterior Wall Panel Crane
Pick
Dundee- Glasgow Access Road (see Map B below)
November 7- 11
The crane will be located within the construction fence line and will be offloading wall panels from trucks that will be occupying one lane of the Dundee- Glasgow Access Road. Flag people will be onsite to control traffic.
-
950578- STUDENT HEALTH & COUNSELING CENTER CONSTRUCTION ADVISORY #31
Current Weeks
Construction Activities
Location
Activity
Equipment Used
Anticipated Disturbance
Project Site
Continuation of Metal Stud Wall Framing
Various hand and power tools, aerial device
Moderate level of pedestrian noise including occasional High level of noise from hammering, sawing and backup alarms.
Project Site
Continuation of HVAC equipment installation
Various hand tools, aerial device
Moderate level of pedestrian noise including occasional hammering and backup alarms.
Project Site
Continuation of in wall utility installation
Various hand tools, aerial device
Moderate level of pedestrian noise including occasional hammering and backup alarms.
Contractor Parking Area
Continued parking for contractor and sub-contractors; storage of equipment
Contractor vehicles
Low level of vehicle and pedestrian noise.
Contractor Offices
Continued office use
Office Equipment and Furniture
Low level of pedestrian noise
Week of October 24, 2022
Construction Activities
Location
Activity
Equipment Used
Anticipated Disturbance
Project Site
Continuation of Metal Stud Wall Framing
Various hand and power tools, aerial device
Moderate level of pedestrian noise including occasional hammering, sawing and backup alarms.
Project Site
Continuation of HVAC equipment installation
Various hand tools, aerial device
Moderate level of pedestrian noise including occasional hammering and backup alarms.
Project Site
Continuation of in wall utility installation
Various hand tools, aerial device
Moderate level of pedestrian noise including occasional hammering and backup alarms.
Contractor Parking Area
Continued parking for contractor and sub-contractors; storage of equipment
Contractor vehicles
Low level of vehicle and pedestrian noise.
Contractor Offices
Continued office use
Office Equipment and Furniture
Low level of pedestrian noise
Upcoming Anticipated Shutdowns/ Closures
The following shutdown(s)/ closures are anticipated in the weeks to come. Specific locations of equipment and dates are approximations and may change due to UCR review comments and unforeseen schedule delays. Updates to this schedule will be released weekly in the Project Construction Advisories until the work is complete. Please contact Dexter Galang with any specific questions or concerns at dexter.galang@ucr.edu.
Description
Location
Proposed
Duration & Date
Potential Impacted Buildings/ Facilities
North Exterior Wall Panel Crane
Pick
Linden Entrance to Facilities Services and Fleet Services (see Map A below)
October 31-
November 4
The crane will be located at Linden Entrance to Facilities Services and Fleet Services. Temporary access to and from the Facilities and Fleet Yards will be from the west gate in Lot 23. The Crane will be offloading wall panels from trucks that will be occupying one lane of Linden Street. Flag people will be onsite to control traffic.
West Exterior Wall Panel Crane
Pick
Dundee- Glasgow Access Road (see Map B below)
November 7- 11
The crane will be located within the construction fence line and will be offloading wall panels from trucks that will be occupying one lane of the Dundee- Glasgow Access Road. Flag people will be onsite to control traffic.
-
950578- STUDENT HEALTH & COUNSELING CENTER CONSTRUCTION ADVISORY #30
Current Weeks
Construction Activities
Location
Activity
Equipment Used
Anticipated Disturbance
Project Site
Continuation of Metal Stud Wall Framing
Various hand and power tools, aerial device
Moderate level of pedestrian noise including occasional hammering, sawing and backup alarms.
Project Site
HVAC equipment installation
Various hand tools, aerial device
Moderate level of pedestrian noise including occasional hammering and backup alarms.
Project Site
Continuation of site drainage installation & storm drain tie in.
Mini excavator, various hand tools
Moderate level of vehicle and pedestrian noise .
Contractor Parking Area
Continued parking for contractor and sub-contractors; storage of equipment
Contractor vehicles
Low level of vehicle and pedestrian noise.
Contractor Offices
Continued office use
Office Equipment and Furniture
Low level of pedestrian noise
Week of October 17, 2022
Construction Activities
Location
Activity
Equipment Used
Anticipated Disturbance
Project Site
Continuation of Metal Stud Wall Framing
Various hand and power tools, aerial device
Moderate level of pedestrian noise including occasional hammering, sawing and backup alarms.
Project Site
Continuation of HVAC equipment installation
Various hand tools, aerial device
Moderate level of pedestrian noise including occasional hammering and backup alarms.
Project Site
Continuation of site drainage installation & storm drain tie in.
Mini excavator, various hand tools
Moderate level of vehicle and pedestrian noise .
Contractor Parking Area
Continued parking for contractor and sub-contractors; storage of equipment
Contractor vehicles
Low level of vehicle and pedestrian noise.
Contractor Offices
Continued office use
Office Equipment and Furniture
Low level of pedestrian noise
Upcoming Anticipated Shutdowns/ Closures
The following shutdown(s)/ closures are anticipated in the weeks to come. Specific locations of equipment and dates are approximations and may change due to UCR review comments and unforeseen schedule delays. Updates to this schedule will be released weekly in the Project Construction Advisories until the work is complete. Please contact Dexter Galang with any specific questions or concerns at dexter.galang@ucr.edu.
Description
Location
Proposed
Duration & Date
Potential Impacted Buildings/ Facilities
North Exterior Wall Panel Crane
Pick
Linden Entrance to Facilities Services and Fleet Services (see Map A below)
October 31-
November 4
The crane will be located at Linden Entrance to Facilities Services and Fleet Services. Temporary access to and from the Facilities and Fleet Yards will be from the west gate in Lot 23. The Crane will be offloading wall panels from trucks that will be occupying one lane of Linden Street. Flag people will be onsite to control traffic.
West Exterior Wall Panel Crane
Pick
Dundee- Glasgow Access Road (see Map B below)
November 7- 11
The crane will be located within the construction fence line and will be offloading wall panels from trucks that will be occupying one lane of the Dundee- Glasgow Access Road. Flag people will be onsite to control traffic.
-
950578- STUDENT HEALTH & COUNSELING CENTER CONSTRUCTION ADVISORY #29
Current Weeks
Construction Activities
Location
Activity
Equipment Used
Anticipated Disturbance
Project Site
Level 1 Concrete Curing
Curing blankets and various hand tools
Low level of vehicle engine and pedestrian noise.
Project Site
HVAC hanger installation
Various hand tools
Moderate level of pedestrian noise including occasional hammering.
Project Site
Site drainage installation & storm drain tie in.
Mini excavator, various hand tools
Moderate level of vehicle and pedestrian noise .
Project Site
Wall framing
Various hand tools
Moderate level of pedestrian noise.
Contractor Parking Area
Continued parking for contractor and sub-contractors; storage of equipment
Contractor vehicles
Low level of vehicle and pedestrian noise.
Contractor Offices
Continued office use
Office Equipment and Furniture
Low level of pedestrian noise
Week of October 3, 2022
Construction Activities
Location
Activity
Equipment Used
Anticipated Disturbance
Project Site
Continuation of HVAC hanger installation
Various hand tools
Moderate level of pedestrian noise including occasional hammering.
Project Site
Continuation of site drainage installation & storm drain tie in.
Mini excavator, various hand tools
Moderate level of vehicle and pedestrian noise .
Project Site
Continuation of wall framing
Various hand tools
Moderate level of pedestrian noise.
Contractor Parking Area
Continued parking for contractor and sub-contractors; storage of equipment
Contractor vehicles
Low level of vehicle and pedestrian noise.
Contractor Offices
Continued office use
Office Equipment and Furniture
Low level of pedestrian noise
Upcoming Anticipated Shutdowns/ Closures
The following shutdown(s)/ closures are anticipated in the weeks to come. Specific locations of equipment and dates are approximations and may change due to UCR review comments and unforeseen schedule delays. Updates to this schedule will be released weekly in the Project Construction Advisories until the work is complete. Please contact Dexter Galang with any specific questions or concerns at dexter.galang@ucr.edu.
Description
Location
Proposed
Duration & Date
Potential Impacted Buildings/ Facilities
North Exterior Wall Panel Crane
Pick
Linden Entrance to Facilities Services and Fleet Services (see Map A below)
October 17-21
The crane will be located at Linden Entrance to Facilities Services and Fleet Services. Temporary access to and from the Facilities and Fleet Yards will be from the west gate in Lot 23. The Crane will be offloading wall panels from trucks that will be occupying one lane of Linden Street. Flag people will be onsite to control traffic.
West Exterior Wall Panel Crane
Pick
Dundee- Glasgow Access Road (see Map B below)
October 24-28
The crane will be located within the construction fence line and will be offloading wall panels from trucks that will be occupying one lane of the Dundee- Glasgow Access Road. Flag people will be onsite to control traffic.
-
950578- STUDENT HEALTH & COUNSELING CENTER CONSTRUCTION ADVISORY #28
Current Weeks
Construction Activities
Location
Activity
Equipment Used
Anticipated Disturbance
Project Site
Gravel, sand base and vapor barrier for slab on grade
Delivery trucks, mini excavator, various hand tools
Moderate level of vehicle engine and pedestrian noise.
Project Site
Additional Sewer and Storm Drain tie in
Mini excavator, various hand tools
Moderate level of vehicle engine and pedestrian noise.
Project Site
Concrete Pour at northwest corner
Concrete delivery trucks, pumper truck, mini excavator, various hand tools
5:00 am start. Contractor will mitigate early hours noise and light. Moderate level of vehicle engine and pedestrian noise.
Contractor Parking Area
Continued parking for contractor and sub-contractors; storage of equipment
Contractor vehicles
Low level of vehicle and pedestrian noise.
Contractor Offices
Continued office use
Office Equipment and Furniture
Low level of pedestrian noise
Week of September 26, 2022
Construction Activities
Location
Activity
Equipment Used
Anticipated Disturbance
Project Site
First Floor Slab on Grade Concrete Pour
Pumper Truck, Concrete Delivery Trucks, various hand tools.
5:00 am start. Contractor will mitigate early hours noise and light. Moderate level of vehicle engine and pedestrian noise.
Contractor Parking Area
Continued parking for contractor and sub-contractors; storage of equipment
Contractor vehicles
Low level of vehicle and pedestrian noise.
Contractor Offices
Continued office use
Office Equipment and Furniture
Low level of pedestrian noise
Upcoming Anticipated Shutdowns/ Closures
The following shutdown(s)/ closures are anticipated in the weeks to come. Specific dates are approximations and may change due to unforeseen schedule delays. Updates to this schedule will be released weekly in the Project Construction Advisories until the work is complete. Please contact Dexter Galang with any specific questions or concerns at dexter.galang@ucr.edu.
Description
Location
Proposed
Duration & Date
Potential Impacted Buildings/ Facilities
North Exterior Wall Panel Crane
Pick
Linden Entrance to Facilities Services and Fleet Services (see Map A below)
October 17-21
The crane will be located at Linden Entrance to Facilities Services and Fleet Services. Temporary access to and from the Facilities and Fleet Yards will be from the west gate in Lot 23. The Crane will be offloading wall panels from trucks that will be occupying one lane of Linden Street. Flag people will be onsite to control traffic.
West Exterior Wall Panel Crane
Pick
Dundee- Glasgow Access Road (see Map B below)
October 24-28
The crane will be located within the construction fence line and will be offloading wall panels from trucks that will be occupying one lane of the Dundee- Glasgow Access Road. Flag people will be onsite to control traffic.
-
950578- STUDENT HEALTH & COUNSELING CENTER CONSTRUCTION ADVISORY #27
Current Weeks
Construction Activities
Location
Activity
Equipment Used
Anticipated Disturbance
Project Site
Shallow ground utility layout
Mini Excavator, various hand tools
Moderate level of vehicle engine and pedestrian noise.
Project Site
Gravel and sand base for slab on grade
Delivery trucks, mini excavator, various hand tools
Moderate level of vehicle engine and pedestrian noise.
Project Site
Additional Sewer and Storm Drain tie in
Mini excavator, various hand tools
Moderate level of vehicle engine and pedestrian noise.
Contractor Parking Area
Continued parking for contractor and sub-contractors; storage of equipment
Contractor vehicles
Low level of vehicle and pedestrian noise.
Contractor Offices
Continued office use
Office Equipment and Furniture
Low level of pedestrian noise
No work outside of fence line is anticipated at this time during student move-in weekend on September 17 & 18.
Week of September 19, 2022
Construction Activities
Location
Activity
Equipment Used
Anticipated Disturbance
Project Site
Vapor Barrier Installation for slab on grade
Delivery trucks, fork lift, various hand tools
Moderate level of vehicle engine and pedestrian noise.
Contractor Parking Area
Continued parking for contractor and sub-contractors; storage of equipment
Contractor vehicles
Low level of vehicle and pedestrian noise.
Contractor Offices
Continued office use
Office Equipment and Furniture
Low level of pedestrian noise
Upcoming Anticipated Shutdowns/ Closures
The following shutdown(s)/ closures are anticipated in the weeks to come. Specific dates are approximations and may change due to unforeseen schedule delays. Updates to this schedule will be released weekly in the Project Construction Advisories until the work is complete. Please contact Dexter Galang with any specific questions or concerns at dexter.galang@ucr.edu.
Description
Location
Proposed
Duration & Date
Potential Impacted Buildings/ Facilities
North Exterior Wall Panel Crane
Pick
Linden Entrance to Facilities Services and Fleet Services (see Map A below)
October 17-21
The crane will be located at Linden Entrance to Facilities Services and Fleet Services. Temporary access to and from the Facilities and Fleet Yards will be from the west gate in Lot 23. The Crane will be offloading wall panels from trucks that will be occupying one lane of Linden Street. Flag people will be onsite to control traffic.
West Exterior Wall Panel Crane
Pick
Dundee- Glasgow Access Road (see Map B below)
October 24-28
The crane will be located within the construction fence line and will be offloading wall panels from trucks that will be occupying one lane of the Dundee- Glasgow Access Road. Flag people will be onsite to control traffic.
-
950578- STUDENT HEALTH & COUNSELING CENTER CONSTRUCTION ADVISORY #26
Current Weeks
Construction Activities
Location
Activity
Equipment Used
Anticipated Disturbance
Project Site
Underground Electrical and Plumbing
Mini Excavator, various hand tools
Moderate level of vehicle engine and pedestrian noise.
Project Site
First Level Slab on Grade Concrete Pour
Concrete Mixer Truck, Concrete Pumper, various hand tools
Moderate level of vehicle engine and pedestrian noise.
Project Site
Utility Yard Footing concrete pour
Concrete Mixer Truck, Concrete Pumper, various hand tools
Moderate level of vehicle engine and pedestrian noise.
Contractor Parking Area
Continued parking for contractor and sub-contractors; storage of equipment
Contractor vehicles
Low level of vehicle and pedestrian noise.
Contractor Offices
Continued office use
Office Equipment and Furniture
Low level of pedestrian noise
Week of September 5, 2022
Construction Activities
Location
Activity
Equipment Used
Anticipated Disturbance
Project Site
Second Level Slab Concrete Pour
Concrete Mixer Truck, Concrete Pumper, various hand tools
Moderate level of vehicle engine and pedestrian noise.
Contractor Parking Area
Continued parking for contractor and sub-contractors; storage of equipment
Contractor vehicles
Low level of vehicle and pedestrian noise.
Contractor Offices
Continued office use
Office Equipment and Furniture
Low level of pedestrian noise
No work is anticipated at this time during student move-in weekend on September 17 & 18.
Upcoming Anticipated Utility Shutdowns
The following utility shutdown(s) are anticipated in the weeks to come. Specific dates are approximations and logistical details are pending approval. Please contact Dexter Galang with any specific questions or concerns at dexter.galang@ucr.edu.
Description
Location
Proposed
Duration & Date
Potential Impacted Buildings/ Facilities
None anticipated at this time
-
-
-
-
950578- STUDENT HEALTH & COUNSELING CENTER CONSTRUCTION ADVISORY #25
Current Weeks
Construction Activities
Location
Activity
Equipment Used
Anticipated Disturbance
Project Site
Continuation of Structural steel erection- plumbing squaring, bolting and welding
Truck crane, Various hand tools
Moderate level of, vehicle engine noise, occasional hammering and pedestrian noise.
Project Site
Utility Yard CMU Wall Construction
Mini Excavator, various hand tools
Moderate level of vehicle engine and pedestrian noise.
Project Site
Various concrete
Concrete truck and Pumper, various hand tools
Moderate level of vehicle engine and pedestrian noise.
Landscape Area between Dundee and Glasgow and Dundee Glasgow Access Road
Landscape Restoration
Various hand tools
Periodic limited access on road with traffic controlled by flag people.
Contractor Parking Area
Continued parking for contractor and sub-contractors; storage of equipment
Contractor vehicles
Low level of vehicle and pedestrian noise.
Contractor Offices
Continued office use
Office Equipment and Furniture
Low level of pedestrian noise
Week of 8-29-2022
Construction Activities
Location
Activity
Equipment Used
Anticipated Disturbance
Landscape Area between Dundee and Glasgow and Dundee Glasgow Access Road
Continuation of Landscape Restoration
Mini Excavator, various hand tools
Periodic limited access on road with traffic controlled by flag people.
Project Site
Utility Yard Footing concrete pour
Mini Excavator, various hand tools
Moderate level of vehicle engine and pedestrian noise.
Contractor Parking Area
Continued parking for contractor and sub-contractors; storage of equipment
Contractor vehicles
Low level of vehicle and pedestrian noise.
Contractor Offices
Continued office use
Office Equipment and Furniture
Low level of pedestrian noise
Upcoming Anticipated Utility Shutdowns
The following utility shutdown(s) are anticipated in the weeks to come. Specific dates are approximations and logistical details are pending approval. Please contact Dexter Galang with any specific questions or concerns at dexter.galang@ucr.edu.
Description
Location
Proposed
Duration & Date
Potential Impacted Buildings/ Facilities
None anticipated at this time
-
-
-
-
950578- STUDENT HEALTH & COUNSELING CENTER CONSTRUCTION ADVISORY #24
Current Weeks
Construction Activities
Location
Activity
Equipment Used
Anticipated Disturbance
Project Site
Continuation of Structural steel deliveries
Delivery semi-trucks, Rough terrain fork lift, Various hand tools
Moderate level of backup alarms, vehicle engine and pedestrian noise. Increased traffic along Linden.
Project Site
Continuation of Structural steel erection
Truck crane, Various hand tools
Moderate level of, vehicle engine noise, occasional hammering and pedestrian noise.
Project Site
Utility Yard Footing- setting rebar
Mini Excavator, various hand tools
Moderate level of vehicle engine and pedestrian noise.
Contractor Parking Area
Continued parking for contractor and sub-contractors; storage of equipment
Contractor vehicles
Low level of vehicle and pedestrian noise.
Contractor Offices
Continued office use
Office Equipment and Furniture
Low level of pedestrian noise
Week of 8-15-2022
Construction Activities
Location