School of Business New Building
The new School of Business building complex will be a flagship facility, serving as the permanent home for the School. The building will complement the School of Business’ existing space program and fully address enrollment-driven needs in pursuit of their aspiration to become the premier center of management research and education in the Inland Empire.
Project Scope:
The proposed building will provide about 38,500 ASF within approximately to 63,400 GSF, along with exterior circulation and gathering areas. The program includes the following spaces:
- Classrooms and Educational Spaces
- Student Support Spaces
- Academic Offices and Support Spaces
- Administrative Offices and Support Spaces
- Shared Building Resources (Lobby, Multipurpose room(s) etc)
School of Business Project Updates
-
950592 UCR SBB - Construction Alert #93
Week of August 19, 2024
Construction Activities
Location
Activity
Equipment Used
Anticipated Disturbance
SBB (Lot 8)
Install Signage – INT-L1
NA
NA
SBB (Lot 8)
Install Signage – INT-L2
NA
NA
SBB (Lot 8)
Install Signage – INT-L3
NA
NA
SBB (Lot 8)
Install Signage – INT-L4
NA
NA
SBB (Lot 8)
Set Plumbing Finishes – INT-L4
NA
NA
Anderson Park
Install Exterior Signage – SITE-AP
NA
NA
SBB (Lot 8)
F/R/P Stairs – SITE-N
Heavy Equipment
Noise
SBB (Lot 8)
F/R/P Hardscape – SITE-N
Heavy Equipment
Noise
SBB (Lot 8)
Base and Pave – SITE-N
Heavy Equipment
Noise
SBB (Lot 8)
F/R/P Stairs – SITE-E
Heavy Equipment
Noise
SBB (Lot 8)
F/R/P Hardscape – SIET-E
Heavy Equipment
Noise
SBB (Lot 8)
Insall Irrigation – SITE-E
NA
NA
SBB (Lot 8)
Insall Landscaping – SITE-E
NA
NA
SBB (Lot 8)
Install Site Furnishing – SITE-E
NA
NA
SBB (Lot 8)
Insall Handrail / Guardrail – SITE-E
NA
NA
SBB (Lot 8)
Install Exterior Signage – SITE-E
NA
NA
SBB (Lot 8)
Install Exterior Signage – SITE-S
NA
NA
SBB (Lot 8)
Install Irrigation – SITE-W
NA
NA
SBB (Lot 8)
Install Handrail / Guardrail – SITE-W
NA
NA
SBB (Lot 8)
Install Site Furnishings – SITE-W
NA
NA
SBB (Lot 8)
Install Exterior Signage – SITE-W
NA
NA
SBB (Lot 8)
Base and Pave – SITE-W
Heavy Equipment
Noise
Week of August 26, 2024
Construction Activities
Location
Activity
Equipment Used
Anticipated Disturbance
SBB (Lot 8)
Install Signage – INT-L1
NA
NA
SBB (Lot 8)
Install Signage – INT-L2
NA
NA
SBB (Lot 8)
Install Signage – INT-L3
NA
NA
SBB (Lot 8)
Install Signage – INT-L4
NA
NA
SBB (Lot 8)
Set Plumbing Finishes – INT-L4
NA
NA
Anderson Park
Install Exterior Signage – SITE-AP
NA
NA
SBB (Lot 8)
F/R/P Stairs – SITE-N
Heavy Equipment
Noise
SBB (Lot 8)
F/R/P Hardscape – SITE-N
Heavy Equipment
Noise
SBB (Lot 8)
Base and Pave – SITE-N
Heavy Equipment
Noise
SBB (Lot 8)
F/R/P Stairs – SITE-E
Heavy Equipment
Noise
SBB (Lot 8)
F/R/P Hardscape – SIET-E
Heavy Equipment
Noise
SBB (Lot 8)
Insall Irrigation – SITE-E
NA
NA
SBB (Lot 8)
Insall Landscaping – SITE-E
NA
NA
SBB (Lot 8)
Install Site Furnishing – SITE-E
NA
NA
SBB (Lot 8)
Insall Handrail / Guardrail – SITE-E
NA
NA
SBB (Lot 8)
Install Exterior Signage – SITE-E
NA
NA
SBB (Lot 8)
Install Exterior Signage – SITE-S
NA
NA
SBB (Lot 8)
Install Irrigation – SITE-W
NA
NA
SBB (Lot 8)
Install Handrail / Guardrail – SITE-W
NA
NA
SBB (Lot 8)
Install Site Furnishings – SITE-W
NA
NA
SBB (Lot 8)
Install Exterior Signage – SITE-W
NA
NA
SBB (Lot 8)
Base and Pave – SITE-W
Heavy Equipment
Noise
Week of September 2, 2024
Construction Activities
Location
Activity
Equipment Used
Anticipated Disturbance
SBB (Lot 8)
Trend CHW/HHW System Performance
NA
NA
SBB (Lot 8)
Trend HVAC System Performance
NA
NA
SBB (Lot 8)
Install Landscape (West Site)
NA
NA
SBB (Lot 8)
Install Landscape (East Site)
NA
NA
SBB (Lot 8)
Install Landscape (North Site)
NA
NA
SBB (Lot 8)
Install Irrigation (North Site)
NA
NA
Current and Upcoming Anticipated Closures
The following shutdown(s)/ closures are anticipated as indicated below. Updates to this schedule will be released weekly in the Project Construction Advisories until the work is complete. Please contact John Franklin with any specific questions or concerns at john.franklin@ucr.edu.
Description
Location
Duration & Date
Impacted Buildings/ Facilities
Lot 8
Lot 8
Permanently
Lot 8
Lot 43
Lot 43
Indefinitely
Lot 43
South Campus Drive
South Campus Drive
6/17 – 8/30
South Campus Drive Road Closure
Anderson Park
Anderson Park
Indefinitely
Anderson Park
-
950592 UCR SBB - Construction Alert #92
Week of August 12, 2024
Construction Activities
Location
Activity
Equipment Used
Anticipated Disturbance
SBB (Lot 8)
Install Handrail / Guardrail – INT-L2
NA
NA
SBB (Lot 8)
Fine Grade – SITE-N
Heavy Equipment
Noise
SBB (Lot 8)
Backfill Planters – SITE-N
NA
NA
SBB (Lot 8)
F/R/P Stairs – SITE-N
Heavy Equipment
Noise
SBB (Lot 8)
F/R/P Hardscape – SITE-N
Heavy Equipment
Noise
SBB (Lot 8)
Install Irrigation – SITE-E
NA
NA
SBB (Lot 8)
Install Landscaping – SITE-E
NA
NA
SBB (Lot 8)
Install Site Furnishings – SITE-E
NA
NA
SBB (Lot 8)
Install Handrail / Guardrail – SITE-E
NA
NA
SBB (Lot 8)
Install Exterior Signage – SITE-E
NA
NA
SBB (Lot 8)
Install Site Furnishings – SITE-S
NA
NA
SBB (Lot 8)
Install Exterior Signage – SITE-S
NA
NA
SBB (Lot 8)
Install Irrigation – SITE-S
NA
NA
SBB (Lot 8)
Base & Pave – SITE-S
Heavy Equipment
Noise
SBB (Lot 8)
Install Landscaping – SITE-S
NA
NA
SBB (Lot 8)
Install Handrail / Guardrail – SITE-W
NA
NA
Week of August 19, 2024
Construction Activities
Location
Activity
Equipment Used
Anticipated Disturbance
SBB (Lot 8)
Install Signage – INT-L1
NA
NA
SBB (Lot 8)
Install Signage – INT-L2
NA
NA
SBB (Lot 8)
Install Signage – INT-L3
NA
NA
SBB (Lot 8)
Install Signage – INT-L4
NA
NA
SBB (Lot 8)
Set Plumbing Finishes – INT-L4
NA
NA
Anderson Park
Install Exterior Signage – SITE-AP
NA
NA
SBB (Lot 8)
F/R/P Stairs – SITE-N
Heavy Equipment
Noise
SBB (Lot 8)
F/R/P Hardscape – SITE-N
Heavy Equipment
Noise
SBB (Lot 8)
Base and Pave – SITE-N
Heavy Equipment
Noise
SBB (Lot 8)
F/R/P Stairs – SITE-E
Heavy Equipment
Noise
SBB (Lot 8)
F/R/P Hardscape – SIET-E
Heavy Equipment
Noise
SBB (Lot 8)
Insall Irrigation – SITE-E
NA
NA
SBB (Lot 8)
Insall Landscaping – SITE-E
NA
NA
SBB (Lot 8)
Install Site Furnishing – SITE-E
NA
NA
SBB (Lot 8)
Insall Handrail / Guardrail – SITE-E
NA
NA
SBB (Lot 8)
Install Exterior Signage – SITE-E
NA
NA
SBB (Lot 8)
Install Exterior Signage – SITE-S
NA
NA
SBB (Lot 8)
Install Irrigation – SITE-W
NA
NA
SBB (Lot 8)
Install Handrail / Guardrail – SITE-W
NA
NA
SBB (Lot 8)
Install Site Furnishings – SITE-W
NA
NA
SBB (Lot 8)
Install Exterior Signage – SITE-W
NA
NA
SBB (Lot 8)
Base and Pave – SITE-W
Heavy Equipment
Noise
Week of August 26, 2024
Construction Activities
Location
Activity
Equipment Used
Anticipated Disturbance
SBB (Lot 8)
Donor Wall Signage – INT-L2
NA
NA
SBB (Lot 8)
Install Handrail – SITE-N
NA
NA
SBB (Lot 8)
Base and Pave – SITE-N
Heavy Equipment
Noise
SBB (Lot 8)
F/R/P Stairs – SITE-N
Heavy Equipment
Noise
SBB (Lot 8)
F/R/P Hardscape – SITE-N
Heavy Equipment
Noise
SBB (Lot 8)
Install Exterior Signage – SITE-N
NA
NA
SBB (Lot 8)
F/R/P Stairs – SITE-E
Heavy Equipment
Noise
SBB (Lot 8)
F/R/P Hardscape – SITE-E
Heavy Equipment
Noise
SBB (Lot 8)
Install Irrigation – SITE-E
NA
NA
SBB (Lot 8)
Install Site Furnishings – SITE-E
NA
NA
SBB (Lot 8)
Install Handrail / Guardrail – SITE-E
NA
NA
SBB (Lot 8)
Install Exterior Signage – SITE-E
NA
NA
SBB (Lot 8)
Install Irrigation – SITE-W
NA
NA
SBB (Lot 8)
Install Handrail / Guardrail – SITE-W
NA
NA
SBB (Lot 8)
Install Site Furnishings – SITE-W
NA
NA
SBB (Lot 8)
Install Exterior Signage – SITE-W
NA
NA
SBB (Lot 8)
Base and Pave – SITE-W
Heavy Equipment
Noise
SBB (Lot 8)
Grind and Overlay Remaining Asphalt Paving / Final Cap Paving – SITE-CD
Heavy Equipment
Noise
SBB (Lot 8)
Install Landscape – SITE-W
NA
NA
SBB (Lot 8)
Install Landscape – SITE-E
Heavy Equipment
Noise
SBB (Lot 8)
Install Landscape – SITE-N
Heavy Equipment
Noise
SBB (Lot 8)
Install Irrigation – SITE-N
Heavy Equipment
Noise
Current and Upcoming Anticipated Closures
The following shutdown(s)/ closures are anticipated as indicated below. Updates to this schedule will be released weekly in the Project Construction Advisories until the work is complete. Please contact John Franklin with any specific questions or concerns at john.franklin@ucr.edu.
Description
Location
Duration & Date
Impacted Buildings/ Facilities
Lot 8
Lot 8
Permanently
Lot 8
Lot 43
Lot 43
Indefinitely
Lot 43
South Campus Drive
South Campus Drive
6/17 – 8/30
South Campus Drive Road Closure
Anderson Park
Anderson Park
Indefinitely
Anderson Park
-
950592 UCR SBB - Construction Alert #91
Please note: Due to logistical reasons and ongoing construction, South Campus Drive will remain closed until Friday, 8/30.
We sincerely apologize for the extended delays and any inconvenience this may have caused.
Week of August 5, 2024
Construction Activities
Location
Activity
Equipment Used
Anticipated Disturbance
SBB (Lot 8)
Install Signage – INT-L1
NA
NA
SBB (Lot 8)
Final Clean / Punchlist – INT-L1
NA
NA
SBB (Lot 8)
Wood Cladding / Bench – INT-L2
NA
NA
SBB (Lot 8)
Donor Wall Signage – INT-L2
NA
NA
SBB (Lot 8)
Install Signage – INT-L2
NA
NA
SBB (Lot 8)
Install Polished Concrete – INT-L2
NA
NA
SBB (Lot 8)
Final Clean / Punchlist – INT-L2
NA
NA
SBB (Lot 8)
Install Signage – INT-L3
NA
NA
SBB (Lot 8)
Final Clean / Punchlist – INT-L3
NA
NA
SBB (Lot 8)
Final Coat of Paint – RR-L4
NA
NA
SBB (Lot 8)
Install Signage – INT-L4
NA
NA
SBB (Lot 8)
Set Plumbing Finishes – INT-L4
NA
NA
SBB (Lot 8)
Final Clean / Punchlist – INT-L4
NA
NA
SBB (Lot 8)
Install Exterior Signage – SITE-AP
NA
NA
SBB (Lot 8)
Install Landscaping – SITE-AP
NA
NA
SBB (Lot 8)
Install Irrigation Mains & Sleeves – SITE-N
NA
NA
SBB (Lot 8)
Install Site Lighting Underground – SITE-N
NA
NA
SBB (Lot 8)
F/R/P Curb & Gutter – SITE-N
Heavy Equipment
Noise
SBB (Lot 8)
Fine Grade – SITE-E
Heavy Equipment
Noise
SBB (Lot 8)
F/R/P Stairs – SITE-E
Heavy Equipment
Heavy Equipment
SBB (Lot 8)
F/R/P Hardscape – SITE-E
Heavy Equipment
Heavy Equipment
SBB (Lot 8)
Install Site Furnishings – SITE-W
NA
NA
SBB (Lot 8)
Install Exterior Signage – SITE-W
NA
NA
SBB (Lot 8)
Install Irrigation – SITE-W
NA
NA
SBB (Lot 8)
Base & Pave – SITE-W
Heavy Equipment
Noise
SBB (Lot 8)
Install Landscaping – SITE-W
NA
NA
Week of August 12, 2024
Construction Activities
Location
Activity
Equipment Used
Anticipated Disturbance
SBB (Lot 8)
Final Clean / Punch – INT-AUD
NA
NA
SBB (Lot 8)
Install Handrail / Guardrail – INT-L2
NA
NA
SBB (Lot 8)
Fine Grade – SITE-N
Heavy Equipment
Noise
SBB (Lot 8)
Backfill Planters – SITE-N
NA
NA
SBB (Lot 8)
F/R/P Stairs – SITE-N
Heavy Equipment
Noise
SBB (Lot 8)
F/R/P Hardscape – SITE-N
Heavy Equipment
Noise
SBB (Lot 8)
Install Irrigation – SITE-E
NA
NA
SBB (Lot 8)
Install Landscaping – SITE-E
NA
NA
SBB (Lot 8)
Install Site Furnishings – SITE-E
NA
NA
SBB (Lot 8)
Install Handrail / Guardrail – SITE-E
NA
NA
SBB (Lot 8)
Install Exterior Signage – SITE-E
NA
NA
SBB (Lot 8)
Install Site Furnishings – SITE-S
NA
NA
SBB (Lot 8)
Install Exterior Signage – SITE-S
NA
NA
SBB (Lot 8)
Install Irrigation – SITE-S
NA
NA
SBB (Lot 8)
Base & Pave – SITE-S
Heavy Equipment
Noise
SBB (Lot 8)
Install Landscaping – SITE-S
NA
NA
SBB (Lot 8)
Install Handrail / Guardrail – SITE-W
NA
NA
Week of August 19, 2024
Construction Activities
Location
Activity
Equipment Used
Anticipated Disturbance
SBB (Lot 8)
Install Signage – INT-L1
NA
NA
SBB (Lot 8)
Install Signage – INT-L2
NA
NA
SBB (Lot 8)
Install Signage – INT-L3
NA
NA
SBB (Lot 8)
Install Signage – INT-L4
NA
NA
SBB (Lot 8)
Set Plumbing Finishes – INT-L4
NA
NA
Anderson Park
Install Exterior Signage – SITE-AP
NA
NA
SBB (Lot 8)
F/R/P Stairs – SITE-N
Heavy Equipment
Noise
SBB (Lot 8)
F/R/P Hardscape – SITE-N
Heavy Equipment
Noise
SBB (Lot 8)
Base and Pave – SITE-N
Heavy Equipment
Noise
SBB (Lot 8)
F/R/P Stairs – SITE-E
Heavy Equipment
Noise
SBB (Lot 8)
F/R/P Hardscape – SIET-E
Heavy Equipment
Noise
SBB (Lot 8)
Insall Irrigation – SITE-E
NA
NA
SBB (Lot 8)
Insall Landscaping – SITE-E
NA
NA
SBB (Lot 8)
Install Site Furnishing – SITE-E
NA
NA
SBB (Lot 8)
Insall Handrail / Guardrail – SITE-E
NA
NA
SBB (Lot 8)
Install Exterior Signage – SITE-E
NA
NA
SBB (Lot 8)
Install Exterior Signage – SITE-S
NA
NA
SBB (Lot 8)
Install Irrigation – SITE-W
NA
NA
SBB (Lot 8)
Install Handrail / Guardrail – SITE-W
NA
NA
SBB (Lot 8)
Install Site Furnishings – SITE-W
NA
NA
SBB (Lot 8)
Install Exterior Signage – SITE-W
NA
NA
SBB (Lot 8)
Base and Pave – SITE-W
Heavy Equipment
Noise
Current and Upcoming Anticipated Closures
The following shutdown(s)/ closures are anticipated as indicated below. Updates to this schedule will be released weekly in the Project Construction Advisories until the work is complete. Please contact John Franklin with any specific questions or concerns at john.franklin@ucr.edu.
Description
Location
Duration & Date
Impacted Buildings/ Facilities
Lot 8
Lot 8
Permanently
Lot 8
Lot 43
Lot 43
Indefinitely
Lot 43
South Campus Drive
South Campus Drive
6/17 – 8/19
South Campus Drive Road Closure
Anderson Park
Anderson Park
Indefinitely
Anderson Park
-
950592 UCR SBB - Construction Alert #90
Week of July 29, 2024
Construction Activities
Location Activity Equipment Used Anticipated Disturbance SBB (Lot 8)
Final Coat of Paint – RR-L1
NA
NA
SBB (Lot 8)
Install Roll Up Door – FR08-185
NA
NA
SBB (Lot 8)
Install Window Shades – INT-L1
NA
NA
SBB (Lot 8)
Install FF&E – INT-L1
NA
NA
SBB (Lot 8)
Install Polished Concrete – INT-L1
NA
NA
SBB (Lot 8)
Install Fixed Seating – INT-AUD
NA
NA
SBB (Lot 8)
Remove Dancefloor – INT-L2
NA
NA
SBB (Lot 8)
Install Window Shades – INT-L2
NA
NA
SBB (Lot 8)
Final Coat of Paint – RR-L3
NA
NA
SBB (Lot 8)
Install Window Shades – INT-L3
NA
NA
SBB (Lot 8)
Set Plumbing Finishes – INT-L3
NA
NA
SBB (Lot 8)
Install Electrical Finishes – RR-L4
NA
NA
SBB (Lot 8)
Install Window Shades – INT-L4
NA
NA
Anderson Park
Install Site Furnishings – SITE-AP
NA
NA
Anderson Park
Install Irrigation – SITE-AP
NA
NA
Anderson Park
Install Handrail/Guardrail – SITE-AP
NA
NA
SBB (Lot 8)
Backfill / Rough Grade / Cut Curbs – SITE-N
Heavy Equipment
Noise
SBB (Lot 8)
F/R/P Curbs – SITE-E
Heavy Equipment
Noise
SBB (Lot 8)
Fine Grade – SITE-S
Heavy Equipment
Noise
SBB (Lot 8)
Backfill & LID Planter Install – SITE-S
Heavy Equipment
Noise
SBB (Lot 8)
F/R/P Hardscape – SITE-S
Heavy Equipment
Noise
SBB (Lot 8)
F/R/P Stairs – SITE-W
Heavy Equipment
Noise
Campus Drive
Base & Pave – SITE-CD
Heavy Equipment
Noise
Week of August 5, 2024
Construction Activities
Location Activity Equipment Used Anticipated Disturbance SBB (Lot 8)
Install Signage – INT-L1
NA
NA
SBB (Lot 8)
Final Clean / Punchlist – INT-L1
NA
NA
SBB (Lot 8)
Wood Cladding / Bench – INT-L2
NA
NA
SBB (Lot 8)
Donor Wall Signage – INT-L2
NA
NA
SBB (Lot 8)
Install Signage – INT-L2
NA
NA
SBB (Lot 8)
Install Polished Concrete – INT-L2
NA
NA
SBB (Lot 8)
Final Clean / Punchlist – INT-L2
NA
NA
SBB (Lot 8)
Install Signage – INT-L3
NA
NA
SBB (Lot 8)
Final Clean / Punchlist – INT-L3
NA
NA
SBB (Lot 8)
Final Coat of Paint – RR-L4
NA
NA
SBB (Lot 8)
Install Signage – INT-L4
NA
NA
SBB (Lot 8)
Set Plumbing Finishes – INT-L4
NA
NA
SBB (Lot 8)
Final Clean / Punchlist – INT-L4
NA
NA
SBB (Lot 8)
Install Exterior Signage – SITE-AP
NA
NA
SBB (Lot 8)
Install Landscaping – SITE-AP
NA
NA
SBB (Lot 8)
Install Irrigation Mains & Sleeves – SITE-N
NA
NA
SBB (Lot 8)
Install Site Lighting Underground – SITE-N
NA
NA
SBB (Lot 8)
F/R/P Curb & Gutter – SITE-N
Heavy Equipment
Noise
SBB (Lot 8)
Fine Grade – SITE-E
Heavy Equipment
Noise
SBB (Lot 8)
F/R/P Stairs – SITE-E
Heavy Equipment
Heavy Equipment
SBB (Lot 8)
F/R/P Hardscape – SITE-E
Heavy Equipment
Heavy Equipment
SBB (Lot 8)
Install Site Furnishings – SITE-W
NA
NA
SBB (Lot 8)
Install Exterior Signage – SITE-W
NA
NA
SBB (Lot 8)
Install Irrigation – SITE-W
NA
NA
SBB (Lot 8)
Base & Pave – SITE-W
Heavy Equipment
Noise
SBB (Lot 8)
Install Landscaping – SITE-W
NA
NA
Week of August 12, 2024
Construction Activities
Location Activity Equipment Used Anticipated Disturbance SBB (Lot 8)
Final Clean / Punch – INT-AUD
NA
NA
SBB (Lot 8)
Install Handrail / Guardrail – INT-L2
NA
NA
SBB (Lot 8)
Fine Grade – SITE-N
Heavy Equipment
Noise
SBB (Lot 8)
Backfill Planters – SITE-N
NA
NA
SBB (Lot 8)
F/R/P Stairs – SITE-N
Heavy Equipment
Noise
SBB (Lot 8)
F/R/P Hardscape – SITE-N
Heavy Equipment
Noise
SBB (Lot 8)
Install Irrigation – SITE-E
NA
NA
SBB (Lot 8)
Install Landscaping – SITE-E
NA
NA
SBB (Lot 8)
Install Site Furnishings – SITE-E
NA
NA
SBB (Lot 8)
Install Handrail / Guardrail – SITE-E
NA
NA
SBB (Lot 8)
Install Exterior Signage – SITE-E
NA
NA
SBB (Lot 8)
Install Site Furnishings – SITE-S
NA
NA
SBB (Lot 8)
Install Exterior Signage – SITE-S
NA
NA
SBB (Lot 8)
Install Irrigation – SITE-S
NA
NA
SBB (Lot 8)
Base & Pave – SITE-S
Heavy Equipment
Noise
SBB (Lot 8)
Install Landscaping – SITE-S
NA
NA
SBB (Lot 8)
Install Handrail / Guardrail – SITE-W
NA
NA
Current and Upcoming Anticipated Closures
The following shutdown(s)/ closures are anticipated as indicated below. Updates to this schedule will be released weekly in the Project Construction Advisories until the work is complete. Please contact John Franklin with any specific questions or concerns at john.franklin@ucr.edu.
Description
Location
Duration & Date
Impacted Buildings/ Facilities
Lot 8
Lot 8
Permanently
Lot 8
Lot 43
Lot 43
Indefinitely
Lot 43
South Campus Drive
South Campus Drive
6/17 – 8/12
South Campus Drive Road Closure
Anderson Park
Anderson Park
Indefinitely
Anderson Park
-
950592 UCR SBB - Construction Alert #89
Week of July 22, 2024
Construction Activities
Location
Activity
Equipment Used
Anticipated Disturbance
SBB (Lot 8)
Install Electrical Finishes – RR-L1
NA
NA
SBB (Lot 8)
Install Casework / Millwork – INT-L1
NA
NA
SBB (Lot 8)
MEPF Devices at Wood Ceilings – INT-L1
NA
NA
SBB (Lot 8)
Install Interior Glazing Glass – INT-L1
NA
NA
SBB (Lot 8)
Install Wood Ceilings – INT-L1
NA
NA
SBB (Lot 8)
Install FEC's – INT-L1
NA
NA
SBB (Lot 8)
Install Operable Partition Walls – INT-L1
NA
NA
SBB (Lot 8)
Install Wall Protection – INT-L1
NA
NA
SBB (Lot 8)
Install Marker Boards – INT-L1
NA
NA
SBB (Lot 8)
Install AV Devices – INT-L1
NA
NA
SBB (Lot 8)
Install Telecom Devices – INT-L1
NA
NA
SBB (Lot 8)
Install Electrical Cover Plates – INT-L1
NA
NA
SBB (Lot 8)
Install Security Devices – INT-L1
NA
NA
SBB (Lot 8)
Install Carpet & Base – INT-L1
NA
NA
SBB (Lot 8)
Install Security Devices – INT-AUD
NA
NA
SBB (Lot 8)
Install Polished Concrete – INT-AUD
NA
NA
SBB (Lot 8)
Install Marker Boards – INT-AUD
NA
NA
SBB (Lot 8)
Install Telecom Devices – INT-AUD
NA
NA
SBB (Lot 8)
Install Electrical Cover Plates – INT-AUD
NA
NA
SBB (Lot 8)
Final Coat of Paint – RR-L2
NA
NA
SBB (Lot 8)
MEPF Devices at Wood Ceiling – INT-L2
NA
NA
SBB (Lot 8)
Install Wood Ceilings – INT-L2
NA
NA
SBB (Lot 8)
Install Casework / Millwork – INT-L2
NA
NA
SBB (Lot 8)
Set Plumbing Finishes – INT-L2
NA
NA
SBB (Lot 8)
Install Electrical Finishes – RR-L3
NA
NA
SBB (Lot 8)
Install Casework / Millwork – INT-L3
NA
NA
SBB (Lot 8)
Toilet Partitions and Accessories – RR-L4
NA
NA
SBB (Lot 8)
Install Casework / Millwork – INT-L4
NA
NA
SBB (Lot 8)
Install Marker Boards – INT-L4
NA
NA
SBB (Lot 8)
Install AV Devices – INT-L4
NA
NA
SBB (Lot 8)
Install FF&E – INT-L4
NA
NA
SBB (Lot 8)
Remove Protection & Install Finishes – ELEV-295
NA
NA
Anderson Park
F/R/P Remaining Hardscape Along Campus Drive – SITE-AP
Heavy Equipment
Noise
SBB (Lot 8)
Backfill / Rough Grade / Cut Curbs – SITE-E
Heavy Equipment
Noise
SBB (Lot 8)
Install Irrigation Mains & Sleeves – SITE-E
NA
NA
SBB (Lot 8)
Install Site Lighting Underground – SITE-E
NA
NA
SBB (Lot 8)
F/R/P Curb & Gutter – SITE-S
Heavy Equipment
Noise
SBB (Lot 8)
F/R/P Curb & Gutter – SITE-W
Heavy Equipment
Noise
SBB (Lot 8)
Fine Grade – SITE-W
Heavy Equipment
Noise
SBB (Lot 8)
Backfill Planters – SITE-W
Heavy Equipment
Noise
SBB (Lot 8)
F/R/P Hardscape – SITE-W
Heavy Equipment
Noise
Campus Drive
Fine Grade for Asphalt – SITE-CD
Heavy Equipment
Noise
Week of July 29, 2024
Construction Activities
Location
Activity
Equipment Used
Anticipated Disturbance
SBB (Lot 8)
Final Coat of Paint – RR-L1
NA
NA
SBB (Lot 8)
Install Roll Up Door – FR08-185
NA
NA
SBB (Lot 8)
Install Window Shades – INT-L1
NA
NA
SBB (Lot 8)
Install FF&E – INT-L1
NA
NA
SBB (Lot 8)
Install Polished Concrete – INT-L1
NA
NA
SBB (Lot 8)
Install Fixed Seating – INT-AUD
NA
NA
SBB (Lot 8)
Remove Dancefloor – INT-L2
NA
NA
SBB (Lot 8)
Install Window Shades – INT-L2
NA
NA
SBB (Lot 8)
Final Coat of Paint – RR-L3
NA
NA
SBB (Lot 8)
Install Window Shades – INT-L3
NA
NA
SBB (Lot 8)
Set Plumbing Finishes – INT-L3
NA
NA
SBB (Lot 8)
Install Electrical Finishes – RR-L4
NA
NA
SBB (Lot 8)
Install Window Shades – INT-L4
NA
NA
Anderson Park
Install Site Furnishings – SITE-AP
NA
NA
Anderson Park
Install Irrigation – SITE-AP
NA
NA
Anderson Park
Install Handrail/Guardrail – SITE-AP
NA
NA
SBB (Lot 8)
Backfill / Rough Grade / Cut Curbs – SITE-N
Heavy Equipment
Noise
SBB (Lot 8)
F/R/P Curbs – SITE-E
Heavy Equipment
Noise
SBB (Lot 8)
Fine Grade – SITE-S
Heavy Equipment
Noise
SBB (Lot 8)
Backfill & LID Planter Install – SITE-S
Heavy Equipment
Noise
SBB (Lot 8)
F/R/P Hardscape – SITE-S
Heavy Equipment
Noise
SBB (Lot 8)
F/R/P Stairs – SITE-W
Heavy Equipment
Noise
Campus Drive
Base & Pave – SITE-CD
Heavy Equipment
Noise
Week of August 5, 2024
Construction Activities
Location
Activity
Equipment Used
Anticipated Disturbance
SBB (Lot 8)
Install Signage – INT-L1
NA
NA
SBB (Lot 8)
Final Clean / Punchlist – INT-L1
NA
NA
SBB (Lot 8)
Wood Cladding / Bench – INT-L2
NA
NA
SBB (Lot 8)
Donor Wall Signage – INT-L2
NA
NA
SBB (Lot 8)
Install Signage – INT-L2
NA
NA
SBB (Lot 8)
Install Polished Concrete – INT-L2
NA
NA
SBB (Lot 8)
Final Clean / Punchlist – INT-L2
NA
NA
SBB (Lot 8)
Install Signage – INT-L3
NA
NA
SBB (Lot 8)
Final Clean / Punchlist – INT-L3
NA
NA
SBB (Lot 8)
Final Coat of Paint – RR-L4
NA
NA
SBB (Lot 8)
Install Signage – INT-L4
NA
NA
SBB (Lot 8)
Set Plumbing Finishes – INT-L4
NA
NA
SBB (Lot 8)
Final Clean / Punchlist – INT-L4
NA
NA
SBB (Lot 8)
Install Exterior Signage – SITE-AP
NA
NA
SBB (Lot 8)
Install Landscaping – SITE-AP
NA
NA
SBB (Lot 8)
Install Irrigation Mains & Sleeves – SITE-N
NA
NA
SBB (Lot 8)
Install Site Lighting Underground – SITE-N
NA
NA
SBB (Lot 8)
F/R/P Curb & Gutter – SITE-N
Heavy Equipment
Noise
SBB (Lot 8)
Fine Grade – SITE-E
Heavy Equipment
Noise
SBB (Lot 8)
F/R/P Stairs – SITE-E
Heavy Equipment
Heavy Equipment
SBB (Lot 8)
F/R/P Hardscape – SITE-E
Heavy Equipment
Heavy Equipment
SBB (Lot 8)
Install Site Furnishings – SITE-W
NA
NA
SBB (Lot 8)
Install Exterior Signage – SITE-W
NA
NA
SBB (Lot 8)
Install Irrigation – SITE-W
NA
NA
SBB (Lot 8)
Base & Pave – SITE-W
Heavy Equipment
Noise
SBB (Lot 8)
Install Landscaping – SITE-W
NA
NA
Current and Upcoming Anticipated Closures
The following shutdown(s)/ closures are anticipated as indicated below. Updates to this schedule will be released weekly in the Project Construction Advisories until the work is complete. Please contact John Franklin with any specific questions or concerns at john.franklin@ucr.edu.
Description
Location
Duration & Date
Impacted Buildings/ Facilities
Lot 8
Lot 8
Permanently
Lot 8
Lot 43
Lot 43
Indefinitely
Lot 43
South Campus Drive
South Campus Drive
6/17 – 8/9
South Campus Drive Road Closure
Anderson Park
Anderson Park
Indefinitely
Anderson Park
-
950592 UCR SBB - Construction Alert #88
Week of July 15, 2024
Construction Activities
Location
Activity
Equipment Used
Anticipated Disturbance
SBB (Lot 8)
Install Plumbing Fixtures – RR-L1
NA
NA
SBB (Lot 8)
Toilet Partitions and Accessories – RR-L1
NA
NA
SBB (Lot 8)
Seal Concrete Floor – FR08-195
NA
NA
SBB (Lot 8)
Install Cafe Equipment – FR08-165
NA
NA
SBB (Lot 8)
Install Doors & Hardware – INT-L1
NA
NA
SBB (Lot 8)
Final Coat of Paint – INT-L1
NA
NA
SBB (Lot 8)
Set Plumbing Finishes – INT-L1
NA
NA
SBB (Lot 8)
Install AV Devices – INT-AUD
NA
NA
SBB (Lot 8)
Install Wood Wall Panels – INT-AUD
NA
NA
SBB (Lot 8)
Install FF&E – INT-AUD
NA
NA
SBB (Lot 8)
Install Electrical Finishes – RR-L2
NA
NA
SBB (Lot 8)
Toilet Partitions and Accessories – RR-L3
NA
NA
SBB (Lot 8)
Install Interior Glazing Glass – INT-L3
NA
NA
SBB (Lot 8)
Install Marker Boards – INT-L3
NA
NA
SBB (Lot 8)
Install AV Devices – INT-L3
NA
NA
SBB (Lot 8)
Install Interior Glazing Glass – INT-L4
NA
NA
SBB (Lot 8)
F/R/P Wall Footings – SITE-N
Heavy Equipment
Noise
SBB (Lot 8)
F/R/P Seat Benches – SITE-E
Heavy Equipment
Noise
SBB (Lot 8)
F/R/P Site Walls – Amphitheater – SITE-E
Heavy Equipment
Noise
SBB (Lot 8)
Install Site Lighting Underground – SITE-S
NA
NA
SBB (Lot 8)
Install Irrigation Mains & Sleeves – SITE-S
NA
NA
SBB (Lot 8)
Install Site Lighting Underground – SITE-W
NA
NA
SBB (Lot 8)
Install Irrigation Mains & Sleeves – SITE-W
NA
NA
Campus Drive
F/R/P Curb & Gutter – SITE-CD
Heavy Equipment
Noise
Campus Drive
Grade Curb Cuts – SITE-CD
Heavy Equipment
Noise
Week of July 22, 2024
Construction Activities
Location
Activity
Equipment Used
Anticipated Disturbance
SBB (Lot 8)
Install Electrical Finishes – RR-L1
NA
NA
SBB (Lot 8)
Install Casework / Millwork – INT-L1
NA
NA
SBB (Lot 8)
MEPF Devices at Wood Ceilings – INT-L1
NA
NA
SBB (Lot 8)
Install Interior Glazing Glass – INT-L1
NA
NA
SBB (Lot 8)
Install Wood Ceilings – INT-L1
NA
NA
SBB (Lot 8)
Install FEC's – INT-L1
NA
NA
SBB (Lot 8)
Install Operable Partition Walls – INT-L1
NA
NA
SBB (Lot 8)
Install Wall Protection – INT-L1
NA
NA
SBB (Lot 8)
Install Marker Boards – INT-L1
NA
NA
SBB (Lot 8)
Install AV Devices – INT-L1
NA
NA
SBB (Lot 8)
Install Telecom Devices – INT-L1
NA
NA
SBB (Lot 8)
Install Electrical Cover Plates – INT-L1
NA
NA
SBB (Lot 8)
Install Security Devices – INT-L1
NA
NA
SBB (Lot 8)
Install Carpet & Base – INT-L1
NA
NA
SBB (Lot 8)
Install Security Devices – INT-AUD
NA
NA
SBB (Lot 8)
Install Polished Concrete – INT-AUD
NA
NA
SBB (Lot 8)
Install Marker Boards – INT-AUD
NA
NA
SBB (Lot 8)
Install Telecom Devices – INT-AUD
NA
NA
SBB (Lot 8)
Install Electrical Cover Plates – INT-AUD
NA
NA
SBB (Lot 8)
Final Coat of Paint – RR-L2
NA
NA
SBB (Lot 8)
MEPF Devices at Wood Ceiling – INT-L2
NA
NA
SBB (Lot 8)
Install Wood Ceilings – INT-L2
NA
NA
SBB (Lot 8)
Install Casework / Millwork – INT-L2
NA
NA
SBB (Lot 8)
Set Plumbing Finishes – INT-L2
NA
NA
SBB (Lot 8)
Install Electrical Finishes – RR-L3
NA
NA
SBB (Lot 8)
Install Casework / Millwork – INT-L3
NA
NA
SBB (Lot 8)
Toilet Partitions and Accessories – RR-L4
NA
NA
SBB (Lot 8)
Install Casework / Millwork – INT-L4
NA
NA
SBB (Lot 8)
Install Marker Boards – INT-L4
NA
NA
SBB (Lot 8)
Install AV Devices – INT-L4
NA
NA
SBB (Lot 8)
Install FF&E – INT-L4
NA
NA
SBB (Lot 8)
Remove Protection & Install Finishes – ELEV-295
NA
NA
Anderson Park
F/R/P Remaining Hardscape Along Campus Drive – SITE-AP
Heavy Equipment
Noise
SBB (Lot 8)
Backfill / Rough Grade / Cut Curbs – SITE-E
Heavy Equipment
Noise
SBB (Lot 8)
Install Irrigation Mains & Sleeves – SITE-E
NA
NA
SBB (Lot 8)
Install Site Lighting Underground – SITE-E
NA
NA
SBB (Lot 8)
F/R/P Curb & Gutter – SITE-S
Heavy Equipment
Noise
SBB (Lot 8)
F/R/P Curb & Gutter – SITE-W
Heavy Equipment
Noise
SBB (Lot 8)
Fine Grade – SITE-W
Heavy Equipment
Noise
SBB (Lot 8)
Backfill Planters – SITE-W
Heavy Equipment
Noise
SBB (Lot 8)
F/R/P Hardscape – SITE-W
Heavy Equipment
Noise
Campus Drive
Fine Grade for Asphalt – SITE-CD
Heavy Equipment
Noise
Week of July 29, 2024
Construction Activities
Location
Activity
Equipment Used
Anticipated Disturbance
SBB (Lot 8)
Final Coat of Paint – RR-L1
NA
NA
SBB (Lot 8)
Install Roll Up Door – FR08-185
NA
NA
SBB (Lot 8)
Install Window Shades – INT-L1
NA
NA
SBB (Lot 8)
Install FF&E – INT-L1
NA
NA
SBB (Lot 8)
Install Polished Concrete – INT-L1
NA
NA
SBB (Lot 8)
Install Fixed Seating – INT-AUD
NA
NA
SBB (Lot 8)
Remove Dancefloor – INT-L2
NA
NA
SBB (Lot 8)
Install Window Shades – INT-L2
NA
NA
SBB (Lot 8)
Final Coat of Paint – RR-L3
NA
NA
SBB (Lot 8)
Install Window Shades – INT-L3
NA
NA
SBB (Lot 8)
Set Plumbing Finishes – INT-L3
NA
NA
SBB (Lot 8)
Install Electrical Finishes – RR-L4
NA
NA
SBB (Lot 8)
Install Window Shades – INT-L4
NA
NA
Anderson Park
Install Site Furnishings – SITE-AP
NA
NA
Anderson Park
Install Irrigation – SITE-AP
NA
NA
Anderson Park
Install Handrail/Guardrail – SITE-AP
NA
NA
SBB (Lot 8)
Backfill / Rough Grade / Cut Curbs – SITE-N
Heavy Equipment
Noise
SBB (Lot 8)
F/R/P Curbs – SITE-E
Heavy Equipment
Noise
SBB (Lot 8)
Fine Grade – SITE-S
Heavy Equipment
Noise
SBB (Lot 8)
Backfill & LID Planter Install – SITE-S
Heavy Equipment
Noise
SBB (Lot 8)
F/R/P Hardscape – SITE-S
Heavy Equipment
Noise
SBB (Lot 8)
F/R/P Stairs – SITE-W
Heavy Equipment
Noise
Campus Drive
Base & Pave – SITE-CD
Heavy Equipment
Noise
Current and Upcoming Anticipated Closures
The following shutdown(s)/ closures are anticipated as indicated below. Updates to this schedule will be released weekly in the Project Construction Advisories until the work is complete. Please contact John Franklin with any specific questions or concerns at john.franklin@ucr.edu.
Description
Location
Duration & Date
Impacted Buildings/ Facilities
Lot 8
Lot 8
Permanently
Lot 8
Lot 43
Lot 43
Indefinitely
Lot 43
South Campus Drive
South Campus Drive
6/17 – 8/9
South Campus Drive Road Closure
Anderson Park
Anderson Park
Indefinitely
Anderson Park
-
950592 UCR SBB - Construction Alert #87
Week of July 8, 2024
Construction Activities
Location
Activity
Equipment Used
Anticipated Disturbance
SBB Site (Lot 8)
Toilet Partitions and Accessories - RR-L1
NA
NA
SBB Site (Lot 8)
Install Cafe Equipment – INT-L1
NA
NA
SBB Site (Lot 8)
Install FEC's - INT-L1
NA
NA
SBB Site (Lot 8)
Install Operable Partition Walls – INT-L1
NA
NA
SBB Site (Lot 8)
Install Wall Protection – INT-L1
NA
NA
SBB Site (Lot 8)
Install Marker Boards – INT-L1
NA
NA
SBB Site (Lot 8)
Install AV Devices – INT-L1
NA
NA
SBB Site (Lot 8)
Install Telecom Devices – INT-L1
NA
NA
SBB Site (Lot 8)
Install Electrical Cover Plates – INT-L1
NA
NA
SBB Site (Lot 8)
Install Security Devices – INT-L1
NA
NA
SBB Site (Lot 8)
Install Casework / Millwork (Remaining) – INT-L1
NA
NA
SBB Site (Lot 8)
Install Carpet & Base – INT-L1
NA
NA
SBB Site (Lot 8)
Install AV Devices – INT-AUD
NA
NA
SBB Site (Lot 8)
Install Handrail – INT-AUD
NA
NA
SBB Site (Lot 8)
Install Operable Partition Walls – INT-L2
NA
NA
SBB Site (Lot 8)
Final Coat of Paint – RR-L3
NA
NA
SBB Site (Lot 8)
Install Electrical Finishes – RR-L4
NA
NA
SBB Site (Lot 8)
Measure / Fab / Install Countertops (Remaining) – INT-L4
NA
NA
SBB Site (Lot 8)
Schedule State Elevator Inspection - ELEV
NA
NA
Anderson Park
Install Handrail / Guardrail - SITE
NA
NA
SBB Site (Lot 8)
F/R/P Curb & Gutter – SITE-N
Heavy Equipment
Noise
SBB Site (Lot 8)
F/R/P Stairs – SITE-E
Heavy Equipment
Noise
SBB Site (Lot 8)
F/R/P Hardscape – SITE-E
Heavy Equipment
Noise
SBB Site (Lot 8)
F/R/P Hardscape – SITE-S
Heavy Equipment
Noise
SBB Site (Lot 8)
Fine Grade – SITE-W
Heavy Equipment
Noise
SBB Site (Lot 8)
Backfill Planters – SITE-W
Heavy Equipment
Noise
SBB Site (Lot 8)
F/R/P Stairs – SITE-W
Heavy Equipment
Noise
SBB Site (Lot 8)
F/R/P Hardscape – SITE-W
Heavy Equipment
Noise
SBB Site (Lot 8)
Fine Grade for Asphalt – SITE-CD
Heavy Equipment
Noise
Week of July 15, 2024
Construction Activities
Location
Activity
Equipment Used
Anticipated Disturbance
SBB (Lot 8)
Complete Landscape Finish Site Work at Manlift Leaveout – ML
NA
NA
SBB (Lot 8)
Install Electrical Finishes – RR-L1
NA
NA
SBB (Lot 8)
Final Coat of Paint – RR-L1
NA
NA
SBB (Lot 8)
Install FF&E – INT-L1
NA
NA
SBB (Lot 8)
Install Marker Boards – INT-AUD
NA
NA
SBB (Lot 8)
Install Polished Concrete – INT-AUD
NA
NA
SBB (Lot 8)
Install Security Devices – INT-AUD
NA
NA
SBB (Lot 8)
Install Telecom Devices – INT-AUD
NA
NA
SBB (Lot 8)
Install Electrical Cover Plates – INT-AUD
NA
NA
SBB (Lot 8)
Final Coat of Paint – INT-L2
NA
NA
SBB (Lot 8)
Final Coat of Paint – INT-L3
NA
NA
SBB (Lot 8)
Final Coat of Paint – RR-L4
NA
NA
SBB (Lot 8)
Install FF&E – INT-L4
NA
NA
Anderson Park
Install Site Furnishings – SITE-AP
NA
NA
Anderson Park
Install Irrigation – SITE-AP
NA
NA
SBB (Lot 8)
Fine Grade – SITE-N
Heavy Equipment
Noise
SBB (Lot 8)
Backfill Planters – SITE-N
Heavy Equipment
Noise
SBB (Lot 8)
F/R/P Stairs – SITE-N
Heavy Equipment
Noise
SBB (Lot 8)
F/R/P Hardscape – SITE-N
Heavy Equipment
Noise
SBB (Lot 8)
Field Measure and Procure Handrail / Guardrail – SITE-E
NA
NA
SBB (Lot 8)
Field Measure and Procure Handrail / Guardrail – SITE-W
NA
NA
Campus Drive
Base & Pave – SITE-CD
Heavy Equipment
Noise
Campus Drive
Demo – SITE-CD
Heavy Equipment
Noise
Campus Drive
Rough Grade – SITE-CD
Heavy Equipment
Noise
Week of July 22, 2024
Construction Activities
Location
Activity
Equipment Used
Anticipated Disturbance
SBB (Lot 8)
MEPF Devices at Wood Ceiling – INT-L2
NA
NA
SBB (Lot 8)
Measure / Fab / Install Countertops (Remaining) – INT-L2
NA
NA
SBB (Lot 8)
Install Wood Ceilings – INT-L2
NA
NA
SBB (Lot 8)
Install Fixed Seating – INT-L2
NA
NA
SBB (Lot 8)
MEPF Devices at Wood Ceiling – INT-L2
NA
NA
SBB (Lot 8)
Install Wood Ceilings – INT-L2
NA
NA
SBB (Lot 8)
Install Wall Protection – INT-L2
NA
NA
SBB (Lot 8)
Install Marker Boards – INT-L2
NA
NA
SBB (Lot 8)
Install Wall Protection – INT-L3
NA
NA
SBB (Lot 8)
Final Coat of Paint – INT-L4
NA
NA
SBB (Lot 8)
Field Measure and Procure Handrail / Guardrail – SITE-N
NA
NA
SBB (Lot 8)
Install Site Furnishings – SITE-E
NA
NA
SBB (Lot 8)
Install Irrigation – SITE-E
NA
NA
Campus Drive
Grade Curb Cuts – SITE-CD
Heavy Equipment
Noise
Campus Drive
F/R/P Curb & Gutter – SITE-CD
Heavy Equipment
Noise
Current and Upcoming Anticipated Closures
The following shutdown(s)/ closures are anticipated as indicated below. Updates to this schedule will be released weekly in the Project Construction Advisories until the work is complete. Please contact John Franklin with any specific questions or concerns at john.franklin@ucr.edu.
Description
Location
Duration & Date
Impacted Buildings/ Facilities
Lot 8
Lot 8
Permanently
Lot 8
Lot 43
Lot 43
Indefinitely
Lot 43
South Campus Drive
South Campus Drive
6/17 – 7/26
South Campus Drive Road Closure
Anderson Park
Anderson Park
Indefinitely
Anderson Park
-
950592 UCR SBB - Construction Alert #86
Week of July 1, 2024
Construction Activities
Location
Activity
Equipment Used
Anticipated Disturbance
SBB Site (Lot 8)
Complete Hardscape Finish Site Work at Manlift Leaveout – EXT-ML
NA
NA
SBB Site (Lot 8)
Seal Concrete Floor – INT-L1
NA
NA
SBB Site (Lot 8)
Install Doors & Hardware – INT-L1
NA
NA
SBB Site (Lot 8)
Set Plumbing Finishes – INT-L1
NA
NA
SBB Site (Lot 8)
Final Coat of Paint – INT-L1
NA
NA
SBB Site (Lot 8)
Install Linoleum Flooring – INT-L1
NA
NA
SBB Site (Lot 8)
Install Signage – INT-AUD
NA
NA
SBB Site (Lot 8)
Install FEC's – INT-AUD
NA
NA
SBB Site (Lot 8)
Install Doors & Hardware – INT-AUD
NA
NA
SBB Site (Lot 8)
Install Wall Protection – INT-AUD
NA
NA
SBB Site (Lot 8)
Install Wood Wall Panels – INT-AUD
NA
NA
SBB Site (Lot 8)
Install FF&E – INT-AUD
NA
NA
SBB Site (Lot 8)
Acoustical Wall Panels – INT-AUD
NA
NA
SBB Site (Lot 8)
Final Coat of Paint – RR-L2
NA
NA
SBB Site (Lot 8)
Install FEC's – INT-L2
NA
NA
SBB Site (Lot 8)
Set Plumbing Finishes – INT-L2
NA
NA
SBB Site (Lot 8)
Install Electrical Finishes – RR-L3
NA
NA
SBB Site (Lot 8)
Install FEC's – INT-L3
NA
NA
SBB Site (Lot 8)
Set Plumbing Finishes – INT-L3
NA
NA
SBB Site (Lot 8)
Measure / Fab / Install Countertops (Remaining) – INT-L3
NA
NA
SBB Site (Lot 8)
Install FF&E – INT-L3
NA
NA
SBB Site (Lot 8)
Toilet Partitions and Accessories – RR-L4
NA
NA
SBB Site (Lot 8)
Install FEC's – INT-L4
NA
NA
SBB Site (Lot 8)
Set Plumbing Finishes – INT-L4
NA
NA
SBB Site (Lot 8)
Install Casework / Millwork (Remaining) – INT-L4
NA
NA
SBB Site (Lot 8)
Fine Grade – SITE-E
Heavy Equipment
Noise
SBB Site (Lot 8)
F/R/P Curb & Gutter – SITE-W
Heavy Equipment
Noise
SBB Site (Lot 8)
F/R/P Curb & Gutter – SITE-CD
Heavy Equipment
Noise
SBB (Lot 8)
Air Balance - Level 3 – SU-TB
NA
NA
Week of July 8, 2024
Construction Activities
Location
Activity
Equipment Used
Anticipated Disturbance
SBB Site (Lot 8)
Toilet Partitions and Accessories - RR-L1
NA
NA
SBB Site (Lot 8)
Install Cafe Equipment – INT-L1
NA
NA
SBB Site (Lot 8)
Install FEC's - INT-L1
NA
NA
SBB Site (Lot 8)
Install Operable Partition Walls – INT-L1
NA
NA
SBB Site (Lot 8)
Install Wall Protection – INT-L1
NA
NA
SBB Site (Lot 8)
Install Marker Boards – INT-L1
NA
NA
SBB Site (Lot 8)
Install AV Devices – INT-L1
NA
NA
SBB Site (Lot 8)
Install Telecom Devices – INT-L1
NA
NA
SBB Site (Lot 8)
Install Electrical Cover Plates – INT-L1
NA
NA
SBB Site (Lot 8)
Install Security Devices – INT-L1
NA
NA
SBB Site (Lot 8)
Install Casework / Millwork (Remaining) – INT-L1
NA
NA
SBB Site (Lot 8)
Install Carpet & Base – INT-L1
NA
NA
SBB Site (Lot 8)
Install AV Devices – INT-AUD
NA
NA
SBB Site (Lot 8)
Install Handrail – INT-AUD
NA
NA
SBB Site (Lot 8)
Install Operable Partition Walls – INT-L2
NA
NA
SBB Site (Lot 8)
Final Coat of Paint – RR-L3
NA
NA
SBB Site (Lot 8)
Install Electrical Finishes – RR-L4
NA
NA
SBB Site (Lot 8)
Measure / Fab / Install Countertops (Remaining) – INT-L4
NA
NA
SBB Site (Lot 8)
Schedule State Elevator Inspection - ELEV
NA
NA
Anderson Park
Install Handrail / Guardrail - SITE
NA
NA
SBB Site (Lot 8)
F/R/P Curb & Gutter – SITE-N
Heavy Equipment
Noise
SBB Site (Lot 8)
F/R/P Stairs – SITE-E
Heavy Equipment
Noise
SBB Site (Lot 8)
F/R/P Hardscape – SITE-E
Heavy Equipment
Noise
SBB Site (Lot 8)
F/R/P Hardscape – SITE-S
Heavy Equipment
Noise
SBB Site (Lot 8)
Fine Grade – SITE-W
Heavy Equipment
Noise
SBB Site (Lot 8)
Backfill Planters – SITE-W
Heavy Equipment
Noise
SBB Site (Lot 8)
F/R/P Stairs – SITE-W
Heavy Equipment
Noise
SBB Site (Lot 8)
F/R/P Hardscape – SITE-W
Heavy Equipment
Noise
SBB Site (Lot 8)
Fine Grade for Asphalt – SITE-CD
Heavy Equipment
Noise
Week of July 15, 2024
Construction Activities
Location
Activity
Equipment Used
Anticipated Disturbance
SBB (Lot 8)
Complete Landscape Finish Site Work at Manlift Leaveout – ML
NA
NA
SBB (Lot 8)
Install Electrical Finishes – RR-L1
NA
NA
SBB (Lot 8)
Final Coat of Paint – RR-L1
NA
NA
SBB (Lot 8)
Install FF&E – INT-L1
NA
NA
SBB (Lot 8)
Install Marker Boards – INT-AUD
NA
NA
SBB (Lot 8)
Install Polished Concrete – INT-AUD
NA
NA
SBB (Lot 8)
Install Security Devices – INT-AUD
NA
NA
SBB (Lot 8)
Install Telecom Devices – INT-AUD
NA
NA
SBB (Lot 8)
Install Electrical Cover Plates – INT-AUD
NA
NA
SBB (Lot 8)
Final Coat of Paint – INT-L2
NA
NA
SBB (Lot 8)
Final Coat of Paint – INT-L3
NA
NA
SBB (Lot 8)
Final Coat of Paint – RR-L4
NA
NA
SBB (Lot 8)
Install FF&E – INT-L4
NA
NA
Anderson Park
Install Site Furnishings – SITE-AP
NA
NA
Anderson Park
Install Irrigation – SITE-AP
NA
NA
SBB (Lot 8)
Fine Grade – SITE-N
Heavy Equipment
Noise
SBB (Lot 8)
Backfill Planters – SITE-N
Heavy Equipment
Noise
SBB (Lot 8)
F/R/P Stairs – SITE-N
Heavy Equipment
Noise
SBB (Lot 8)
F/R/P Hardscape – SITE-N
Heavy Equipment
Noise
SBB (Lot 8)
Field Measure and Procure Handrail / Guardrail – SITE-E
NA
NA
SBB (Lot 8)
Field Measure and Procure Handrail / Guardrail – SITE-W
NA
NA
Campus Drive
Base & Pave – SITE-CD
Heavy Equipment
Noise
Campus Drive
Demo – SITE-CD
Heavy Equipment
Noise
Campus Drive
Rough Grade – SITE-CD
Heavy Equipment
Noise
Current and Upcoming Anticipated Closures
The following shutdown(s)/ closures are anticipated as indicated below. Updates to this schedule will be released weekly in the Project Construction Advisories until the work is complete. Please contact John Franklin with any specific questions or concerns at john.franklin@ucr.edu.
Description
Location
Duration & Date
Impacted Buildings/ Facilities
Lot 8
Lot 8
Permanently
Lot 8
Lot 43
Lot 43
Indefinitely
Lot 43
South Campus Drive
South Campus Drive
6/17 – 7/26
South Campus Drive Road Closure
Anderson Park
Anderson Park
Indefinitely
Anderson Park
-
950592 UCR SBB - Construction Alert #85
Week of June 24, 2024
Construction Activities
Location
Activity
Equipment Used
Anticipated Disturbance
SBB (Lot 8)
Install Permanent Roofing - RF
NA
NA
SBB (Lot 8)
Install Countertops – RR-L1
NA
NA
SBB (Lot 8)
Install Lights and Egress Lighting – INT-L1
NA
NA
SBB (Lot 8)
Install HVAC Grills & Diffusers – INT-L1
NA
NA
SBB (Lot 8)
Install Fire Sprinkler Drops / Heads – INT-L1
NA
NA
SBB (Lot 8)
Install Fire Alarm Devices – INT-L1
NA
NA
SBB (Lot 8)
Wood Ceiling Hangers / Grid Supports – INT-L1
NA
NA
SBB (Lot 8)
Install Casework / Millwork (Wet) – INT-L1
NA
NA
SBB (Lot 8)
Install Fire Sprinkler Drops / Heads – INT-AUD
NA
NA
SBB (Lot 8)
Install Fire Alarm Devices – INT-AUD
NA
NA
SBB (Lot 8)
Install Lights and Egress Lighting – INT-AUD
NA
NA
SBB (Lot 8)
Install HVAC Grills & Diffusers – INT-AUD
NA
NA
SBB (Lot 8)
Final Overhead Inspections and Sign-off for Ceiling Tile – INT-AUD
NA
NA
SBB (Lot 8)
Install Tile – RR-L2
NA
NA
SBB (Lot 8)
Wood Ceiling Hangers / Grid Supports – INT-L2
NA
NA
SBB (Lot 8)
Install Casework / Millwork (Remaining and Wet) – INT-L2
NA
NA
SBB (Lot 8)
Install Carpet & Base – INT-L2
NA
NA
SBB (Lot 8)
Install AV Devices – INT-L2
NA
NA
SBB (Lot 8)
Install Tile – RR-L3
NA
NA
SBB (Lot 8)
Install Linoleum Flooring – INT-L3
NA
NA
SBB (Lot 8)
Install Lockers – INT-L3
NA
NA
SBB (Lot 8)
Install Casework / Millwork (Wet) – INT-L3
NA
NA
SBB (Lot 8)
Install Tile – RR-L4
NA
NA
SBB (Lot 8)
Install Telecom Devices – INT-L4
NA
NA
SBB (Lot 8)
Install Electrical Cover Plates – INT-L4
NA
NA
SBB (Lot 8)
Install Security Devices – INT-L4
NA
NA
Anderson Park
Install Interior Glazing – INT-L4
NA
NA
SBB Site (Lot 8)
Install Acoustical Ceiling Tile – INT-L4
NA
NA
SBB Site (Lot 8)
Install Casework / Millwork (Wet) – INT-L4
NA
NA
SBB Site (Lot 8)
Install Site Furnishings – SITE-AP
Heavy Equipment
Noise
Anderson Park
Install Irrigation Sleeves – SITE-N
Heavy Equipment
Noise
SBB Site (Lot 8)
Install Site Lighting Underground – SITE-N
Heavy Equipment
Noise
SBB Site (Lot 8)
Install Site Lighting Underground – SITE-E
Heavy Equipment
Noise
SBB Site (Lot 8)
Install Site Lighting Underground – SITE-S
Heavy Equipment
Noise
SBB Site (Lot 8)
F/R/P Curb & Gutter – SITE-S
Heavy Equipment
Noise
SBB Site (Lot 8)
Rough Grade / Cut Curbs – SITE-W
Heavy Equipment
Noise
SBB Site (Lot 8)
Install Irrigation Sleeves – SITE-W
Heavy Equipment
Noise
SBB Site (Lot 8)
Install Site Lighting Underground – SITE-W
Heavy Equipment
Noise
Week of July 1, 2024
Construction Activities
Location
Activity
Equipment Used
Anticipated Disturbance
SBB Site (Lot 8)
Complete Hardscape Finish Site Work at Manlift Leaveout – EXT-ML
NA
NA
SBB Site (Lot 8)
Seal Concrete Floor – INT-L1
NA
NA
SBB Site (Lot 8)
Install Doors & Hardware – INT-L1
NA
NA
SBB Site (Lot 8)
Set Plumbing Finishes – INT-L1
NA
NA
SBB Site (Lot 8)
Final Coat of Paint – INT-L1
NA
NA
SBB Site (Lot 8)
Install Linoleum Flooring – INT-L1
NA
NA
SBB Site (Lot 8)
Install Signage – INT-AUD
NA
NA
SBB Site (Lot 8)
Install FEC's – INT-AUD
NA
NA
SBB Site (Lot 8)
Install Doors & Hardware – INT-AUD
NA
NA
SBB Site (Lot 8)
Install Wall Protection – INT-AUD
NA
NA
SBB Site (Lot 8)
Install Wood Wall Panels – INT-AUD
NA
NA
SBB Site (Lot 8)
Install FF&E – INT-AUD
NA
NA
SBB Site (Lot 8)
Acoustical Wall Panels – INT-AUD
NA
NA
SBB Site (Lot 8)
Final Coat of Paint – RR-L2
NA
NA
SBB Site (Lot 8)
Install FEC's – INT-L2
NA
NA
SBB Site (Lot 8)
Set Plumbing Finishes – INT-L2
NA
NA
SBB Site (Lot 8)
Install Electrical Finishes – RR-L3
NA
NA
SBB Site (Lot 8)
Install FEC's – INT-L3
NA
NA
SBB Site (Lot 8)
Set Plumbing Finishes – INT-L3
NA
NA
SBB Site (Lot 8)
Measure / Fab / Install Countertops (Remaining) – INT-L3
NA
NA
SBB Site (Lot 8)
Install FF&E – INT-L3
NA
NA
SBB Site (Lot 8)
Toilet Partitions and Accessories – RR-L4
NA
NA
SBB Site (Lot 8)
Install FEC's – INT-L4
NA
NA
SBB Site (Lot 8)
Set Plumbing Finishes – INT-L4
NA
NA
SBB Site (Lot 8)
Install Casework / Millwork (Remaining) – INT-L4
NA
NA
SBB Site (Lot 8)
Fine Grade – SITE-E
Heavy Equipment
Noise
SBB Site (Lot 8)
F/R/P Curb & Gutter – SITE-W
Heavy Equipment
Noise
SBB Site (Lot 8)
F/R/P Curb & Gutter – SITE-CD
Heavy Equipment
Noise
SBB (Lot 8)
Air Balance - Level 3 – SU-TB
NA
NA
Week of July 8, 2024
Construction Activities
Location
Activity
Equipment Used
Anticipated Disturbance
SBB Site (Lot 8)
Toilet Partitions and Accessories - RR-L1
NA
NA
SBB Site (Lot 8)
Install Cafe Equipment – INT-L1
NA
NA
SBB Site (Lot 8)
Install FEC's - INT-L1
NA
NA
SBB Site (Lot 8)
Install Operable Partition Walls – INT-L1
NA
NA
SBB Site (Lot 8)
Install Wall Protection – INT-L1
NA
NA
SBB Site (Lot 8)
Install Marker Boards – INT-L1
NA
NA
SBB Site (Lot 8)
Install AV Devices – INT-L1
NA
NA
SBB Site (Lot 8)
Install Telecom Devices – INT-L1
NA
NA
SBB Site (Lot 8)
Install Electrical Cover Plates – INT-L1
NA
NA
SBB Site (Lot 8)
Install Security Devices – INT-L1
NA
NA
SBB Site (Lot 8)
Install Casework / Millwork (Remaining) – INT-L1
NA
NA
SBB Site (Lot 8)
Install Carpet & Base – INT-L1
NA
NA
SBB Site (Lot 8)
Install AV Devices – INT-AUD
NA
NA
SBB Site (Lot 8)
Install Handrail – INT-AUD
NA
NA
SBB Site (Lot 8)
Install Operable Partition Walls – INT-L2
NA
NA
SBB Site (Lot 8)
Final Coat of Paint – RR-L3
NA
NA
SBB Site (Lot 8)
Install Electrical Finishes – RR-L4
NA
NA
SBB Site (Lot 8)
Measure / Fab / Install Countertops (Remaining) – INT-L4
NA
NA
SBB Site (Lot 8)
Schedule State Elevator Inspection - ELEV
NA
NA
Anderson Park
Install Handrail / Guardrail - SITE
NA
NA
SBB Site (Lot 8)
F/R/P Curb & Gutter – SITE-N
Heavy Equipment
Noise
SBB Site (Lot 8)
F/R/P Stairs – SITE-E
Heavy Equipment
Noise
SBB Site (Lot 8)
F/R/P Hardscape – SITE-E
Heavy Equipment
Noise
SBB Site (Lot 8)
F/R/P Hardscape – SITE-S
Heavy Equipment
Noise
SBB Site (Lot 8)
Fine Grade – SITE-W
Heavy Equipment
Noise
SBB Site (Lot 8)
Backfill Planters – SITE-W
Heavy Equipment
Noise
SBB Site (Lot 8)
F/R/P Stairs – SITE-W
Heavy Equipment
Noise
SBB Site (Lot 8)
F/R/P Hardscape – SITE-W
Heavy Equipment
Noise
SBB Site (Lot 8)
Fine Grade for Asphalt – SITE-CD
Heavy Equipment
Noise
Current and Upcoming Anticipated Closures
The following shutdown(s)/ closures are anticipated as indicated below. Updates to this schedule will be released weekly in the Project Construction Advisories until the work is complete. Please contact John Franklin with any specific questions or concerns at john.franklin@ucr.edu.
Description
Location
Duration & Date
Impacted Buildings/ Facilities
Lot 8
Lot 8
Permanently
Lot 8
Lot 43
Lot 43
Indefinitely
Lot 43
South Campus Drive
South Campus Drive
6/17 – 7/19
South Campus Drive Road Closure
Anderson Park
Anderson Park
Indefinitely
Anderson Park
-
950592 UCR SBB - Construction Alert #84
Current Week
Construction Activities
Location
Activity
Equipment Used
Anticipated Disturbance
SBB Site (Lot 8)
Install Parapet Cap - RF
NA
NA
SBB Site (Lot 8)
Deck Edge Metal Panels at Windows – EXT-SW
NA
NA
SBB Site (Lot 8)
Install Window Shades – EXT-NE
NA
NA
SBB Site (Lot 8)
Deck Edge Metal Panels at Windows – EXT-NE
NA
NA
SBB Site (Lot 8)
Curtain Wall - Frames & Glass – Manlift Leavout
NA
NA
SBB Site (Lot 8)
Install Window Shades – Manlift Leavout
NA
NA
SBB Site (Lot 8)
Install Tile – RR-L1
NA
NA
SBB Site (Lot 8)
Install Cafe Equipment
NA
NA
SBB Site (Lot 8)
Install Lights and Egress Lighting – INT-L1
NA
NA
SBB Site (Lot 8)
Install HVAC Grills & Diffusers – INT-L1
NA
NA
SBB Site (Lot 8)
Install Casework / Millwork (Wet) – INT-L1
NA
NA
SBB Site (Lot 8)
Final Overhead Inspections and Sign-off for Ceiling Tile – INT-L1
NA
NA
SBB Site (Lot 8)
Prime & Paint Walls – INT-AUD
NA
NA
SBB Site (Lot 8)
Toilet Partitions and Accessories – RR-L2
NA
NA
SBB Site (Lot 8)
Install Casework / Millwork (Remaining) – INT-L2
NA
NA
SBB Site (Lot 8)
Install Carpet & Base – INT-L2
NA
NA
SBB Site (Lot 8)
Install Doors & Hardware – INT-L2
NA
NA
SBB Site (Lot 8)
Install Tile – RR-L3
NA
NA
SBB Site (Lot 8)
Install Plumbing Fixtures – RR-L3
NA
NA
SBB Site (Lot 8)
Install Linoleum Flooring – INT-L3
NA
NA
SBB Site (Lot 8)
Install Doors & Hardware – INT-L3
NA
NA
SBB Site (Lot 8)
Install AV Devices – INT-L3
NA
NA
SBB Site (Lot 8)
Install Tile – RR-L4
NA
NA
SBB Site (Lot 8)
Install Acoustical Ceiling Tile – INT-L4
NA
NA
SBB Site (Lot 8)
Install Casework / Millwork (Wet) – INT-L4
NA
NA
SBB Site (Lot 8)
Install Doors & Hardware – INT-L4
NA
NA
Anderson Park
Install landscaping – SITE-AP
Heavy Equipment
Noise
SBB Site (Lot 8)
F/R/P Site Walls – SITE-N
Heavy Equipment
Noise
SBB Site (Lot 8)
F/R/P Curbs – SITE-E
Heavy Equipment
Noise
SBB Site (Lot 8)
F/R/P Seat Wall – SITE-E
Heavy Equipment
Noise
SBB Site (Lot 8)
Backfill & LID Planter Install – SITE-S
Heavy Equipment
Noise
Week of June 24, 2024
Construction Activities
Location
Activity
Equipment Used
Anticipated Disturbance
SBB Site (Lot 8)
Install Permanent Roofing - RF
NA
NA
SBB Site (Lot 8)
Install Countertops – RR-L1
NA
NA
SBB Site (Lot 8)
Install Lights and Egress Lighting – INT-L1
NA
NA
SBB Site (Lot 8)
Install HVAC Grills & Diffusers – INT-L1
NA
NA
SBB Site (Lot 8)
Install Fire Sprinkler Drops / Heads – INT-L1
NA
NA
SBB Site (Lot 8)
Install Fire Alarm Devices – INT-L1
NA
NA
SBB Site (Lot 8)
Wood Ceiling Hangers / Grid Supports – INT-L1
NA
NA
SBB Site (Lot 8)
Install Casework / Millwork (Wet) – INT-L1
NA
NA
SBB Site (Lot 8)
Install Fire Sprinkler Drops / Heads – INT-AUD
NA
NA
SBB Site (Lot 8)
Install Fire Alarm Devices – INT-AUD
NA
NA
SBB Site (Lot 8)
Install Lights and Egress Lighting – INT-AUD
NA
NA
SBB Site (Lot 8)
Install HVAC Grills & Diffusers – INT-AUD
NA
NA
SBB Site (Lot 8)
Final Overhead Inspections and Sign-off for Ceiling Tile – INT-AUD
NA
NA
SBB Site (Lot 8)
Install Tile – RR-L2
NA
NA
SBB Site (Lot 8)
Wood Ceiling Hangers / Grid Supports – INT-L2
NA
NA
SBB Site (Lot 8)
Install Casework / Millwork (Remaining and Wet) – INT-L2
NA
NA
SBB Site (Lot 8)
Install Carpet & Base – INT-L2
NA
NA
SBB Site (Lot 8)
Install AV Devices – INT-L2
NA
NA
SBB Site (Lot 8)
Install Tile – RR-L3
NA
NA
SBB Site (Lot 8)
Install Linoleum Flooring – INT-L3
NA
NA
SBB Site (Lot 8)
Install Lockers – INT-L3
NA
NA
SBB Site (Lot 8)
Install Casework / Millwork (Wet) – INT-L3
NA
NA
SBB Site (Lot 8)
Install Tile – RR-L4
NA
NA
SBB Site (Lot 8)
Install Telecom Devices – INT-L4
NA
NA
SBB Site (Lot 8)
Install Electrical Cover Plates – INT-L4
NA