School of Business New Building

The new School of Business building complex will be a flagship facility, serving as the permanent home for the School. The building will complement the School of Business’ existing space program and fully address enrollment-driven needs in pursuit of their aspiration to become the premier center of management research and education in the Inland Empire.


Project Scope:

The proposed building will provide about 38,500 ASF within approximately to 63,400 GSF, along with exterior circulation and gathering areas. The program includes the following spaces:

  • Classrooms and Educational Spaces
  • Student Support Spaces
  • Academic Offices and Support Spaces
  • Administrative Offices and Support Spaces
  • Shared Building Resources (Lobby, Multipurpose room(s) etc)

School of Business Project Updates

  • 950592 UCR SBB - Construction Alert #88

    Week of July 15, 2024

    Construction Activities

     

    Location

    Activity

    Equipment Used

    Anticipated Disturbance

    SBB (Lot 8) 

    Install Plumbing Fixtures – RR-L1

    NA

    NA

    SBB (Lot 8)

    Toilet Partitions and Accessories – RR-L1

    NA

    NA

    SBB (Lot 8)

    Seal Concrete Floor – FR08-195

    NA

    NA

    SBB (Lot 8) 

    Install Cafe Equipment – FR08-165

    NA

    NA

    SBB (Lot 8)

    Install Doors & Hardware – INT-L1

    NA

    NA

    SBB (Lot 8)

    Final Coat of Paint – INT-L1

    NA

    NA

    SBB (Lot 8)

    Set Plumbing Finishes – INT-L1

    NA

    NA

    SBB (Lot 8)

    Install AV Devices – INT-AUD

    NA

    NA

    SBB (Lot 8)

    Install Wood Wall Panels – INT-AUD

    NA

    NA

    SBB (Lot 8) 

    Install FF&E – INT-AUD

    NA

    NA

    SBB (Lot 8)

    Install Electrical Finishes – RR-L2

    NA

    NA

    SBB (Lot 8)

    Toilet Partitions and Accessories – RR-L3

    NA

    NA

    SBB (Lot 8)

    Install Interior Glazing Glass – INT-L3

    NA

    NA

    SBB (Lot 8)

    Install Marker Boards – INT-L3

    NA

    NA

    SBB (Lot 8) 

    Install AV Devices – INT-L3

    NA

    NA

    SBB (Lot 8)

    Install Interior Glazing Glass – INT-L4

    NA

    NA

    SBB (Lot 8) 

    F/R/P Wall Footings – SITE-N

    Heavy Equipment

    Noise

    SBB (Lot 8)

    F/R/P Seat Benches – SITE-E

    Heavy Equipment

    Noise

    SBB (Lot 8)

    F/R/P Site Walls – Amphitheater – SITE-E

    Heavy Equipment

    Noise

    SBB (Lot 8)

    Install Site Lighting Underground – SITE-S

    NA

    NA

    SBB (Lot 8)

    Install Irrigation Mains & Sleeves – SITE-S

    NA

    NA

    SBB (Lot 8)

    Install Site Lighting Underground – SITE-W

    NA

    NA

    SBB (Lot 8)

    Install Irrigation Mains & Sleeves – SITE-W

    NA

    NA

    Campus Drive

    F/R/P Curb & Gutter – SITE-CD

    Heavy Equipment 

    Noise

    Campus Drive

    Grade Curb Cuts – SITE-CD

    Heavy Equipment 

    Noise

     

    Week of July 22, 2024

    Construction Activities

     

    Location

    Activity

    Equipment Used

    Anticipated Disturbance

    SBB (Lot 8)

    Install Electrical Finishes – RR-L1

    NA

    NA

    SBB (Lot 8)

    Install Casework / Millwork – INT-L1

    NA

    NA

    SBB (Lot 8)

    MEPF Devices at Wood Ceilings – INT-L1

    NA

    NA

    SBB (Lot 8)

    Install Interior Glazing Glass – INT-L1

    NA

    NA

    SBB (Lot 8)

    Install Wood Ceilings – INT-L1

    NA

    NA

    SBB (Lot 8)

    Install FEC's – INT-L1

    NA

    NA

    SBB (Lot 8)

    Install Operable Partition Walls – INT-L1

    NA

    NA

    SBB (Lot 8)

    Install Wall Protection – INT-L1

    NA

    NA

    SBB (Lot 8)

    Install Marker Boards – INT-L1

    NA

    NA

    SBB (Lot 8)

    Install AV Devices – INT-L1

    NA

    NA

    SBB (Lot 8)

    Install Telecom Devices – INT-L1

    NA

    NA

    SBB (Lot 8)

    Install Electrical Cover Plates – INT-L1

    NA

    NA

    SBB (Lot 8)

    Install Security Devices – INT-L1

    NA

    NA

    SBB (Lot 8)

    Install Carpet & Base – INT-L1

    NA

    NA

    SBB (Lot 8)

    Install Security Devices – INT-AUD

    NA

    NA

    SBB (Lot 8)

    Install Polished Concrete – INT-AUD

    NA

    NA

    SBB (Lot 8)

    Install Marker Boards – INT-AUD

    NA

    NA

    SBB (Lot 8)

    Install Telecom Devices – INT-AUD

    NA

    NA

    SBB (Lot 8)

    Install Electrical Cover Plates – INT-AUD

    NA

    NA

    SBB (Lot 8)

    Final Coat of Paint – RR-L2

    NA

    NA

    SBB (Lot 8)

    MEPF Devices at Wood Ceiling – INT-L2

    NA

    NA

    SBB (Lot 8)

    Install Wood Ceilings – INT-L2

    NA

    NA

    SBB (Lot 8)

    Install Casework / Millwork – INT-L2

    NA

    NA

    SBB (Lot 8)

    Set Plumbing Finishes – INT-L2

    NA

    NA

    SBB (Lot 8)

    Install Electrical Finishes – RR-L3

    NA

    NA

    SBB (Lot 8)

    Install Casework / Millwork – INT-L3

    NA

    NA

    SBB (Lot 8)

    Toilet Partitions and Accessories – RR-L4

    NA

    NA

    SBB (Lot 8)

    Install Casework / Millwork – INT-L4

    NA

    NA

    SBB (Lot 8)

    Install Marker Boards – INT-L4

    NA

    NA

    SBB (Lot 8)

    Install AV Devices – INT-L4

    NA

    NA

    SBB (Lot 8)

    Install FF&E – INT-L4

    NA

    NA

    SBB (Lot 8)

    Remove Protection & Install Finishes – ELEV-295

    NA

    NA

    Anderson Park

    F/R/P Remaining Hardscape Along Campus Drive – SITE-AP

    Heavy Equipment

    Noise

    SBB (Lot 8)

    Backfill / Rough Grade / Cut Curbs – SITE-E

    Heavy Equipment

    Noise

    SBB (Lot 8)

    Install Irrigation Mains & Sleeves – SITE-E

    NA

    NA

    SBB (Lot 8)

    Install Site Lighting Underground – SITE-E

    NA

    NA

    SBB (Lot 8)

    F/R/P Curb & Gutter – SITE-S

    Heavy Equipment

    Noise

    SBB (Lot 8)

    F/R/P Curb & Gutter – SITE-W

    Heavy Equipment

    Noise

    SBB (Lot 8)

    Fine Grade – SITE-W

    Heavy Equipment

    Noise

    SBB (Lot 8)

    Backfill Planters – SITE-W

    Heavy Equipment

    Noise

    SBB (Lot 8)

    F/R/P Hardscape – SITE-W

    Heavy Equipment

    Noise

    Campus Drive

    Fine Grade for Asphalt – SITE-CD

    Heavy Equipment

    Noise

     

    Week of July 29, 2024

    Construction Activities

     

    Location

    Activity

    Equipment Used

    Anticipated Disturbance

    SBB (Lot 8)

    Final Coat of Paint – RR-L1

    NA

    NA

    SBB (Lot 8)

    Install Roll Up Door – FR08-185

    NA

    NA

    SBB (Lot 8)

    Install Window Shades – INT-L1

    NA

    NA

    SBB (Lot 8)

    Install FF&E – INT-L1

    NA

    NA

    SBB (Lot 8)

    Install Polished Concrete – INT-L1

    NA

    NA

    SBB (Lot 8)

    Install Fixed Seating – INT-AUD

    NA

    NA

    SBB (Lot 8)

    Remove Dancefloor – INT-L2

    NA

    NA

    SBB (Lot 8)

    Install Window Shades – INT-L2

    NA

    NA

    SBB (Lot 8)

    Final Coat of Paint – RR-L3

    NA

    NA

    SBB (Lot 8)

    Install Window Shades – INT-L3

    NA

    NA

    SBB (Lot 8)

    Set Plumbing Finishes – INT-L3

    NA

    NA

    SBB (Lot 8)

    Install Electrical Finishes – RR-L4

    NA

    NA

    SBB (Lot 8)

    Install Window Shades – INT-L4

    NA

    NA

    Anderson Park

    Install Site Furnishings – SITE-AP

    NA

    NA

    Anderson Park

    Install Irrigation – SITE-AP

    NA

    NA

    Anderson Park 

    Install Handrail/Guardrail – SITE-AP

    NA

    NA

    SBB (Lot 8)

    Backfill / Rough Grade / Cut Curbs – SITE-N

    Heavy Equipment

    Noise

    SBB (Lot 8)

    F/R/P Curbs – SITE-E

    Heavy Equipment

    Noise

    SBB (Lot 8)

    Fine Grade – SITE-S

    Heavy Equipment

    Noise

    SBB (Lot 8)

    Backfill & LID Planter Install – SITE-S

    Heavy Equipment

    Noise

    SBB (Lot 8)

    F/R/P Hardscape – SITE-S

    Heavy Equipment

    Noise

    SBB (Lot 8)

    F/R/P Stairs – SITE-W

    Heavy Equipment

    Noise

    Campus Drive

    Base & Pave – SITE-CD

    Heavy Equipment

    Noise

     

    Current and Upcoming Anticipated Closures

    The following shutdown(s)/ closures are anticipated as indicated below. Updates to this schedule will be released weekly in the Project Construction Advisories until the work is complete.  Please contact John Franklin with any specific questions or concerns at john.franklin@ucr.edu.

     

    Description

    Location

    Duration & Date

    Impacted Buildings/ Facilities

    Lot 8

    Lot 8

    Permanently 

    Lot 8

    Lot 43

    Lot 43

    Indefinitely 

    Lot 43

    South Campus Drive

    South Campus Drive

    6/17 – 8/9

    South Campus Drive Road Closure 

    Anderson Park

    Anderson Park

    Indefinitely

    Anderson Park

  • 950592 UCR SBB - Construction Alert #87

    Week of July 8, 2024

    Construction Activities

     

    Location

    Activity

    Equipment Used

    Anticipated Disturbance

    SBB Site (Lot 8)

    Toilet Partitions and Accessories - RR-L1

    NA

    NA

    SBB Site (Lot 8)

    Install Cafe Equipment – INT-L1

    NA

    NA

    SBB Site (Lot 8)

    Install FEC's - INT-L1

    NA

    NA

    SBB Site (Lot 8)

    Install Operable Partition Walls – INT-L1

    NA

    NA

    SBB Site (Lot 8)

    Install Wall Protection – INT-L1

    NA

    NA

    SBB Site (Lot 8)

    Install Marker Boards – INT-L1

    NA

    NA

    SBB Site (Lot 8)

    Install AV Devices – INT-L1

    NA

    NA

    SBB Site (Lot 8)

    Install Telecom Devices – INT-L1

    NA

    NA

    SBB Site (Lot 8)

    Install Electrical Cover Plates – INT-L1

    NA

    NA

    SBB Site (Lot 8)

    Install Security Devices – INT-L1

    NA

    NA

    SBB Site (Lot 8)

    Install Casework / Millwork (Remaining) – INT-L1

    NA

    NA

    SBB Site (Lot 8)

    Install Carpet & Base – INT-L1

    NA

    NA

    SBB Site (Lot 8)

    Install AV Devices – INT-AUD

    NA

    NA

    SBB Site (Lot 8)

    Install Handrail – INT-AUD

    NA

    NA

    SBB Site (Lot 8)

    Install Operable Partition Walls – INT-L2

    NA

    NA

    SBB Site (Lot 8)

    Final Coat of Paint – RR-L3

    NA

    NA

    SBB Site (Lot 8)

    Install Electrical Finishes – RR-L4

    NA

    NA

    SBB Site (Lot 8)

    Measure / Fab / Install Countertops (Remaining) – INT-L4

    NA

    NA

    SBB Site (Lot 8)

    Schedule State Elevator Inspection - ELEV

    NA

    NA

    Anderson Park

    Install Handrail / Guardrail - SITE

    NA

    NA

    SBB Site (Lot 8)

    F/R/P Curb & Gutter – SITE-N      

    Heavy Equipment

    Noise

    SBB Site (Lot 8)

    F/R/P Stairs – SITE-E

    Heavy Equipment

    Noise

    SBB Site (Lot 8)

    F/R/P Hardscape – SITE-E

    Heavy Equipment

    Noise

    SBB Site (Lot 8)

    F/R/P Hardscape – SITE-S

    Heavy Equipment

    Noise

    SBB Site (Lot 8)

    Fine Grade – SITE-W       

    Heavy Equipment

    Noise

    SBB Site (Lot 8)

    Backfill Planters – SITE-W

    Heavy Equipment

    Noise

    SBB Site (Lot 8)

    F/R/P Stairs – SITE-W

    Heavy Equipment

    Noise

    SBB Site (Lot 8)

    F/R/P Hardscape – SITE-W

    Heavy Equipment

    Noise

    SBB Site (Lot 8)

    Fine Grade for Asphalt – SITE-CD

    Heavy Equipment

    Noise

     

    Week of July 15, 2024

    Construction Activities 

     

    Location

    Activity

    Equipment Used

    Anticipated Disturbance

    SBB (Lot 8) 

    Complete Landscape Finish Site Work at Manlift Leaveout – ML

    NA

    NA

    SBB (Lot 8)

    Install Electrical Finishes – RR-L1

    NA

    NA

    SBB (Lot 8)

    Final Coat of Paint – RR-L1

    NA

    NA

    SBB (Lot 8) 

    Install FF&E – INT-L1

    NA

    NA

    SBB (Lot 8)

    Install Marker Boards – INT-AUD

    NA

    NA

    SBB (Lot 8)

    Install Polished Concrete – INT-AUD

    NA

    NA

    SBB (Lot 8)

    Install Security Devices – INT-AUD

    NA

    NA

    SBB (Lot 8)

    Install Telecom Devices – INT-AUD

    NA

    NA

    SBB (Lot 8)

    Install Electrical Cover Plates – INT-AUD

    NA

    NA

    SBB (Lot 8) 

    Final Coat of Paint – INT-L2

    NA

    NA

    SBB (Lot 8)

    Final Coat of Paint – INT-L3

    NA

    NA

    SBB (Lot 8)

    Final Coat of Paint – RR-L4

    NA

    NA

    SBB (Lot 8)

    Install FF&E – INT-L4

    NA

    NA

    Anderson Park

    Install Site Furnishings – SITE-AP

    NA

    NA

    Anderson Park

    Install Irrigation – SITE-AP

    NA

    NA

    SBB (Lot 8)

    Fine Grade – SITE-N

    Heavy Equipment

    Noise

    SBB (Lot 8) 

    Backfill Planters – SITE-N

    Heavy Equipment

    Noise

    SBB (Lot 8)

    F/R/P Stairs – SITE-N

    Heavy Equipment

    Noise

    SBB (Lot 8)

    F/R/P Hardscape – SITE-N

    Heavy Equipment

    Noise

    SBB (Lot 8)

    Field Measure and Procure Handrail / Guardrail – SITE-E

    NA

    NA

    SBB (Lot 8)

    Field Measure and Procure Handrail / Guardrail – SITE-W

    NA

    NA

    Campus Drive

    Base & Pave – SITE-CD

    Heavy Equipment

    Noise

    Campus Drive

    Demo – SITE-CD

    Heavy Equipment

    Noise

    Campus Drive

    Rough Grade – SITE-CD

    Heavy Equipment 

    Noise

     

    Week of July 22, 2024

    Construction Activities

     

    Location

    Activity

    Equipment Used

    Anticipated Disturbance

    SBB (Lot 8)

    MEPF Devices at Wood Ceiling – INT-L2

    NA

    NA

    SBB (Lot 8)

    Measure / Fab / Install Countertops (Remaining) – INT-L2

    NA

    NA

    SBB (Lot 8)

    Install Wood Ceilings – INT-L2

    NA

    NA

    SBB (Lot 8)

    Install Fixed Seating – INT-L2

    NA

    NA

    SBB (Lot 8)

    MEPF Devices at Wood Ceiling – INT-L2

    NA

    NA

    SBB (Lot 8)

    Install Wood Ceilings – INT-L2

    NA

    NA

    SBB (Lot 8)

    Install Wall Protection – INT-L2

    NA

    NA

    SBB (Lot 8)

    Install Marker Boards – INT-L2

    NA

    NA

    SBB (Lot 8)

    Install Wall Protection – INT-L3

    NA

    NA

    SBB (Lot 8)

    Final Coat of Paint – INT-L4

    NA

    NA

    SBB (Lot 8)

    Field Measure and Procure Handrail / Guardrail – SITE-N

    NA

    NA

    SBB (Lot 8)

    Install Site Furnishings – SITE-E

    NA

    NA

    SBB (Lot 8)

    Install Irrigation – SITE-E

    NA

    NA

    Campus Drive

    Grade Curb Cuts – SITE-CD

    Heavy Equipment

    Noise

    Campus Drive

    F/R/P Curb & Gutter – SITE-CD

    Heavy Equipment

    Noise

     

    Current and Upcoming Anticipated Closures

    The following shutdown(s)/ closures are anticipated as indicated below. Updates to this schedule will be released weekly in the Project Construction Advisories until the work is complete.  Please contact John Franklin with any specific questions or concerns at john.franklin@ucr.edu.

     

    Description

    Location

    Duration & Date

    Impacted Buildings/ Facilities

    Lot 8

    Lot 8

    Permanently 

    Lot 8

    Lot 43

    Lot 43

    Indefinitely 

    Lot 43

    South Campus Drive

    South Campus Drive

    6/17 – 7/26

    South Campus Drive Road Closure 

    Anderson Park

    Anderson Park

    Indefinitely

    Anderson Park

  • 950592 UCR SBB - Construction Alert #86

    Week of July 1, 2024

    Construction Activities

     

    Location

    Activity

    Equipment Used

    Anticipated Disturbance

    SBB Site (Lot 8)

    Complete Hardscape Finish Site Work at Manlift Leaveout – EXT-ML

    NA

    NA

    SBB Site (Lot 8)

    Seal Concrete Floor – INT-L1

    NA

    NA

    SBB Site (Lot 8)

    Install Doors & Hardware – INT-L1

    NA

    NA

    SBB Site (Lot 8)

    Set Plumbing Finishes – INT-L1

    NA

    NA

    SBB Site (Lot 8)

    Final Coat of Paint – INT-L1

    NA

    NA

    SBB Site (Lot 8)

    Install Linoleum Flooring – INT-L1

    NA

    NA

    SBB Site (Lot 8)

    Install Signage – INT-AUD

    NA

    NA

    SBB Site (Lot 8)

    Install FEC's – INT-AUD

    NA

    NA

    SBB Site (Lot 8)

    Install Doors & Hardware – INT-AUD

    NA

    NA

    SBB Site (Lot 8)

    Install Wall Protection – INT-AUD

    NA

    NA

    SBB Site (Lot 8)

    Install Wood Wall Panels – INT-AUD

    NA

    NA

    SBB Site (Lot 8)

    Install FF&E – INT-AUD

    NA

    NA

    SBB Site (Lot 8)

    Acoustical Wall Panels – INT-AUD

    NA

    NA

    SBB Site (Lot 8)

    Final Coat of Paint – RR-L2

    NA

    NA

    SBB Site (Lot 8)

    Install FEC's – INT-L2

    NA

    NA

    SBB Site (Lot 8)

    Set Plumbing Finishes – INT-L2

    NA

    NA

    SBB Site (Lot 8)

    Install Electrical Finishes – RR-L3

    NA

    NA

    SBB Site (Lot 8)

    Install FEC's – INT-L3

    NA

    NA

    SBB Site (Lot 8)

    Set Plumbing Finishes – INT-L3

    NA

    NA

    SBB Site (Lot 8)

    Measure / Fab / Install Countertops (Remaining) – INT-L3 

    NA

    NA

    SBB Site (Lot 8)

    Install FF&E – INT-L3

    NA

    NA

    SBB Site (Lot 8)

    Toilet Partitions and Accessories – RR-L4

    NA

    NA

    SBB Site (Lot 8)

    Install FEC's – INT-L4

    NA

    NA

    SBB Site (Lot 8)

    Set Plumbing Finishes – INT-L4

    NA

    NA

    SBB Site (Lot 8)

    Install Casework / Millwork (Remaining) – INT-L4

    NA

    NA

    SBB Site (Lot 8)

    Fine Grade – SITE-E

    Heavy Equipment

    Noise

    SBB Site (Lot 8)

    F/R/P Curb & Gutter – SITE-W

    Heavy Equipment

    Noise

    SBB Site (Lot 8)

    F/R/P Curb & Gutter – SITE-CD

    Heavy Equipment

    Noise

    SBB (Lot 8)

    Air Balance - Level 3 – SU-TB

    NA

    NA

     

    Week of July 8, 2024

    Construction Activities

     

    Location

    Activity

    Equipment Used

    Anticipated Disturbance

    SBB Site (Lot 8)

    Toilet Partitions and Accessories - RR-L1

    NA

    NA

    SBB Site (Lot 8)

    Install Cafe Equipment – INT-L1

    NA

    NA

    SBB Site (Lot 8)

    Install FEC's - INT-L1

    NA

    NA

    SBB Site (Lot 8)

    Install Operable Partition Walls – INT-L1

    NA

    NA

    SBB Site (Lot 8)

    Install Wall Protection – INT-L1

    NA

    NA

    SBB Site (Lot 8)

    Install Marker Boards – INT-L1

    NA

    NA

    SBB Site (Lot 8)

    Install AV Devices – INT-L1

    NA

    NA

    SBB Site (Lot 8)

    Install Telecom Devices – INT-L1

    NA

    NA

    SBB Site (Lot 8)

    Install Electrical Cover Plates – INT-L1

    NA

    NA

    SBB Site (Lot 8)

    Install Security Devices – INT-L1

    NA

    NA

    SBB Site (Lot 8)

    Install Casework / Millwork (Remaining) – INT-L1

    NA

    NA

    SBB Site (Lot 8)

    Install Carpet & Base – INT-L1

    NA

    NA

    SBB Site (Lot 8)

    Install AV Devices – INT-AUD

    NA

    NA

    SBB Site (Lot 8)

    Install Handrail – INT-AUD

    NA

    NA

    SBB Site (Lot 8)

    Install Operable Partition Walls – INT-L2

    NA

    NA

    SBB Site (Lot 8)

    Final Coat of Paint – RR-L3

    NA

    NA

    SBB Site (Lot 8)

    Install Electrical Finishes – RR-L4

    NA

    NA

    SBB Site (Lot 8)

    Measure / Fab / Install Countertops (Remaining) – INT-L4

    NA

    NA

    SBB Site (Lot 8)

    Schedule State Elevator Inspection - ELEV

    NA

    NA

    Anderson Park

    Install Handrail / Guardrail - SITE

    NA

    NA

    SBB Site (Lot 8)

    F/R/P Curb & Gutter – SITE-N      

    Heavy Equipment

    Noise

    SBB Site (Lot 8)

    F/R/P Stairs – SITE-E

    Heavy Equipment

    Noise

    SBB Site (Lot 8)

    F/R/P Hardscape – SITE-E

    Heavy Equipment

    Noise

    SBB Site (Lot 8)

    F/R/P Hardscape – SITE-S

    Heavy Equipment

    Noise

    SBB Site (Lot 8)

    Fine Grade – SITE-W       

    Heavy Equipment

    Noise

    SBB Site (Lot 8)

    Backfill Planters – SITE-W

    Heavy Equipment

    Noise

    SBB Site (Lot 8)

    F/R/P Stairs – SITE-W

    Heavy Equipment

    Noise

    SBB Site (Lot 8)

    F/R/P Hardscape – SITE-W

    Heavy Equipment

    Noise

    SBB Site (Lot 8)

    Fine Grade for Asphalt – SITE-CD

    Heavy Equipment

    Noise

     

    Week of July 15, 2024

    Construction Activities 

     

    Location

    Activity

    Equipment Used

    Anticipated Disturbance

    SBB (Lot 8) 

    Complete Landscape Finish Site Work at Manlift Leaveout – ML

    NA

    NA

    SBB (Lot 8)

    Install Electrical Finishes – RR-L1

    NA

    NA

    SBB (Lot 8)

    Final Coat of Paint – RR-L1

    NA

    NA

    SBB (Lot 8) 

    Install FF&E – INT-L1

    NA

    NA

    SBB (Lot 8)

    Install Marker Boards – INT-AUD

    NA

    NA

    SBB (Lot 8)

    Install Polished Concrete – INT-AUD

    NA

    NA

    SBB (Lot 8)

    Install Security Devices – INT-AUD

    NA

    NA

    SBB (Lot 8)

    Install Telecom Devices – INT-AUD

    NA

    NA

    SBB (Lot 8)

    Install Electrical Cover Plates – INT-AUD

    NA

    NA

    SBB (Lot 8) 

    Final Coat of Paint – INT-L2

    NA

    NA

    SBB (Lot 8)

    Final Coat of Paint – INT-L3

    NA

    NA

    SBB (Lot 8)

    Final Coat of Paint – RR-L4

    NA

    NA

    SBB (Lot 8)

    Install FF&E – INT-L4

    NA

    NA

    Anderson Park

    Install Site Furnishings – SITE-AP

    NA

    NA

    Anderson Park

    Install Irrigation – SITE-AP

    NA

    NA

    SBB (Lot 8)

    Fine Grade – SITE-N

    Heavy Equipment

    Noise

    SBB (Lot 8) 

    Backfill Planters – SITE-N

    Heavy Equipment

    Noise

    SBB (Lot 8)

    F/R/P Stairs – SITE-N

    Heavy Equipment

    Noise

    SBB (Lot 8)

    F/R/P Hardscape – SITE-N

    Heavy Equipment

    Noise

    SBB (Lot 8)

    Field Measure and Procure Handrail / Guardrail – SITE-E

    NA

    NA

    SBB (Lot 8)

    Field Measure and Procure Handrail / Guardrail – SITE-W

    NA

    NA

    Campus Drive

    Base & Pave – SITE-CD

    Heavy Equipment

    Noise

    Campus Drive

    Demo – SITE-CD

    Heavy Equipment

    Noise

    Campus Drive

    Rough Grade – SITE-CD

    Heavy Equipment 

    Noise

     

    Current and Upcoming Anticipated Closures

    The following shutdown(s)/ closures are anticipated as indicated below. Updates to this schedule will be released weekly in the Project Construction Advisories until the work is complete.  Please contact John Franklin with any specific questions or concerns at john.franklin@ucr.edu.

     

    Description

    Location

    Duration & Date

    Impacted Buildings/ Facilities

    Lot 8

    Lot 8

    Permanently 

    Lot 8

    Lot 43

    Lot 43

    Indefinitely 

    Lot 43

    South Campus Drive

    South Campus Drive

    6/17 – 7/26

    South Campus Drive Road Closure 

    Anderson Park

    Anderson Park

    Indefinitely

    Anderson Park

  • 950592 UCR SBB - Construction Alert #85

    Week of June 24, 2024

    Construction Activities 

     

    Location

    Activity

    Equipment Used

    Anticipated Disturbance

    SBB (Lot 8) 

    Install Permanent Roofing - RF

    NA

    NA

    SBB (Lot 8)

    Install Countertops – RR-L1

    NA

    NA

    SBB (Lot 8)

    Install Lights and Egress Lighting – INT-L1

    NA

    NA

    SBB (Lot 8) 

    Install HVAC Grills & Diffusers – INT-L1

    NA

    NA

    SBB (Lot 8)

    Install Fire Sprinkler Drops / Heads – INT-L1

    NA

    NA

    SBB (Lot 8)

    Install Fire Alarm Devices – INT-L1

    NA

    NA

    SBB (Lot 8)

    Wood Ceiling Hangers / Grid Supports – INT-L1

    NA

    NA

    SBB (Lot 8)

    Install Casework / Millwork (Wet) – INT-L1

    NA

    NA

    SBB (Lot 8)

    Install Fire Sprinkler Drops / Heads – INT-AUD

    NA

    NA

    SBB (Lot 8) 

    Install Fire Alarm Devices – INT-AUD

    NA

    NA

    SBB (Lot 8)

    Install Lights and Egress Lighting – INT-AUD

    NA

    NA

    SBB (Lot 8)

    Install HVAC Grills & Diffusers – INT-AUD

    NA

    NA

    SBB (Lot 8)

    Final Overhead Inspections and Sign-off for Ceiling Tile – INT-AUD

    NA

    NA

    SBB (Lot 8)

    Install Tile – RR-L2

    NA

    NA

    SBB (Lot 8)

    Wood Ceiling Hangers / Grid Supports – INT-L2

    NA

    NA

    SBB (Lot 8)

    Install Casework / Millwork (Remaining and Wet) – INT-L2

    NA

    NA

    SBB (Lot 8) 

    Install Carpet & Base – INT-L2

    NA

    NA

    SBB (Lot 8)

    Install AV Devices – INT-L2

    NA

    NA

    SBB (Lot 8)

    Install Tile – RR-L3

    NA

    NA

    SBB (Lot 8)

    Install Linoleum Flooring – INT-L3

    NA

    NA

    SBB (Lot 8)

    Install Lockers – INT-L3

    NA

    NA

    SBB (Lot 8)

    Install Casework / Millwork (Wet) – INT-L3

    NA

    NA

    SBB (Lot 8)

    Install Tile – RR-L4

    NA

    NA

    SBB (Lot 8)

    Install Telecom Devices – INT-L4

    NA

    NA

    SBB (Lot 8)

    Install Electrical Cover Plates – INT-L4

    NA

    NA

    SBB (Lot 8)

    Install Security Devices – INT-L4

    NA

    NA

    Anderson Park

    Install Interior Glazing – INT-L4

    NA

    NA

    SBB Site (Lot 8)

    Install Acoustical Ceiling Tile – INT-L4

    NA

    NA

    SBB Site (Lot 8)

    Install Casework / Millwork (Wet) – INT-L4

    NA

    NA

    SBB Site (Lot 8)

    Install Site Furnishings – SITE-AP

    Heavy Equipment

    Noise

    Anderson Park

    Install Irrigation Sleeves – SITE-N

    Heavy Equipment

    Noise

    SBB Site (Lot 8)

    Install Site Lighting Underground – SITE-N

    Heavy Equipment

    Noise

    SBB Site (Lot 8)

    Install Site Lighting Underground – SITE-E

    Heavy Equipment

    Noise

    SBB Site (Lot 8)

    Install Site Lighting Underground – SITE-S

    Heavy Equipment

    Noise

    SBB Site (Lot 8)

    F/R/P Curb & Gutter – SITE-S

    Heavy Equipment

    Noise

    SBB Site (Lot 8)

    Rough Grade / Cut Curbs – SITE-W

    Heavy Equipment

    Noise

    SBB Site (Lot 8)

    Install Irrigation Sleeves – SITE-W

    Heavy Equipment

    Noise

    SBB Site (Lot 8)

    Install Site Lighting Underground – SITE-W

    Heavy Equipment

    Noise

     

    Week of July 1, 2024

    Construction Activities

     

    Location

    Activity

    Equipment Used

    Anticipated Disturbance

    SBB Site (Lot 8)

    Complete Hardscape Finish Site Work at Manlift Leaveout – EXT-ML

    NA

    NA

    SBB Site (Lot 8)

    Seal Concrete Floor – INT-L1

    NA

    NA

    SBB Site (Lot 8)

    Install Doors & Hardware – INT-L1

    NA

    NA

    SBB Site (Lot 8)

    Set Plumbing Finishes – INT-L1

    NA

    NA

    SBB Site (Lot 8)

    Final Coat of Paint – INT-L1

    NA

    NA

    SBB Site (Lot 8)

    Install Linoleum Flooring – INT-L1

    NA

    NA

    SBB Site (Lot 8)

    Install Signage – INT-AUD

    NA

    NA

    SBB Site (Lot 8)

    Install FEC's – INT-AUD

    NA

    NA

    SBB Site (Lot 8)

    Install Doors & Hardware – INT-AUD

    NA

    NA

    SBB Site (Lot 8)

    Install Wall Protection – INT-AUD

    NA

    NA

    SBB Site (Lot 8)

    Install Wood Wall Panels – INT-AUD

    NA

    NA

    SBB Site (Lot 8)

    Install FF&E – INT-AUD

    NA

    NA

    SBB Site (Lot 8)

    Acoustical Wall Panels – INT-AUD

    NA

    NA

    SBB Site (Lot 8)

    Final Coat of Paint – RR-L2

    NA

    NA

    SBB Site (Lot 8)

    Install FEC's – INT-L2

    NA

    NA

    SBB Site (Lot 8)

    Set Plumbing Finishes – INT-L2

    NA

    NA

    SBB Site (Lot 8)

    Install Electrical Finishes – RR-L3

    NA

    NA

    SBB Site (Lot 8)

    Install FEC's – INT-L3

    NA

    NA

    SBB Site (Lot 8)

    Set Plumbing Finishes – INT-L3

    NA

    NA

    SBB Site (Lot 8)

    Measure / Fab / Install Countertops (Remaining) – INT-L3 

    NA

    NA

    SBB Site (Lot 8)

    Install FF&E – INT-L3

    NA

    NA

    SBB Site (Lot 8)

    Toilet Partitions and Accessories – RR-L4

    NA

    NA

    SBB Site (Lot 8)

    Install FEC's – INT-L4

    NA

    NA

    SBB Site (Lot 8)

    Set Plumbing Finishes – INT-L4

    NA

    NA

    SBB Site (Lot 8)

    Install Casework / Millwork (Remaining) – INT-L4

    NA

    NA

    SBB Site (Lot 8)

    Fine Grade – SITE-E

    Heavy Equipment

    Noise

    SBB Site (Lot 8)

    F/R/P Curb & Gutter – SITE-W

    Heavy Equipment

    Noise

    SBB Site (Lot 8)

    F/R/P Curb & Gutter – SITE-CD

    Heavy Equipment

    Noise

    SBB (Lot 8)

    Air Balance - Level 3 – SU-TB

    NA

    NA

     

    Week of July 8, 2024

    Construction Activities

     

    Location

    Activity

    Equipment Used

    Anticipated Disturbance

    SBB Site (Lot 8)

    Toilet Partitions and Accessories - RR-L1

    NA

    NA

    SBB Site (Lot 8)

    Install Cafe Equipment – INT-L1

    NA

    NA

    SBB Site (Lot 8)

    Install FEC's - INT-L1

    NA

    NA

    SBB Site (Lot 8)

    Install Operable Partition Walls – INT-L1

    NA

    NA

    SBB Site (Lot 8)

    Install Wall Protection – INT-L1

    NA

    NA

    SBB Site (Lot 8)

    Install Marker Boards – INT-L1

    NA

    NA

    SBB Site (Lot 8)

    Install AV Devices – INT-L1

    NA

    NA

    SBB Site (Lot 8)

    Install Telecom Devices – INT-L1

    NA

    NA

    SBB Site (Lot 8)

    Install Electrical Cover Plates – INT-L1

    NA

    NA

    SBB Site (Lot 8)

    Install Security Devices – INT-L1

    NA

    NA

    SBB Site (Lot 8)

    Install Casework / Millwork (Remaining) – INT-L1

    NA

    NA

    SBB Site (Lot 8)

    Install Carpet & Base – INT-L1

    NA

    NA

    SBB Site (Lot 8)

    Install AV Devices – INT-AUD

    NA

    NA

    SBB Site (Lot 8)

    Install Handrail – INT-AUD

    NA

    NA

    SBB Site (Lot 8)

    Install Operable Partition Walls – INT-L2

    NA

    NA

    SBB Site (Lot 8)

    Final Coat of Paint – RR-L3

    NA

    NA

    SBB Site (Lot 8)

    Install Electrical Finishes – RR-L4

    NA

    NA

    SBB Site (Lot 8)

    Measure / Fab / Install Countertops (Remaining) – INT-L4

    NA

    NA

    SBB Site (Lot 8)

    Schedule State Elevator Inspection - ELEV

    NA

    NA

    Anderson Park

    Install Handrail / Guardrail - SITE

    NA

    NA

    SBB Site (Lot 8)

    F/R/P Curb & Gutter – SITE-N      

    Heavy Equipment

    Noise

    SBB Site (Lot 8)

    F/R/P Stairs – SITE-E

    Heavy Equipment

    Noise

    SBB Site (Lot 8)

    F/R/P Hardscape – SITE-E

    Heavy Equipment

    Noise

    SBB Site (Lot 8)

    F/R/P Hardscape – SITE-S

    Heavy Equipment

    Noise

    SBB Site (Lot 8)

    Fine Grade – SITE-W       

    Heavy Equipment

    Noise

    SBB Site (Lot 8)

    Backfill Planters – SITE-W

    Heavy Equipment

    Noise

    SBB Site (Lot 8)

    F/R/P Stairs – SITE-W

    Heavy Equipment

    Noise

    SBB Site (Lot 8)

    F/R/P Hardscape – SITE-W

    Heavy Equipment

    Noise

    SBB Site (Lot 8)

    Fine Grade for Asphalt – SITE-CD

    Heavy Equipment

    Noise

     

    Current and Upcoming Anticipated Closures

    The following shutdown(s)/ closures are anticipated as indicated below. Updates to this schedule will be released weekly in the Project Construction Advisories until the work is complete.  Please contact John Franklin with any specific questions or concerns at john.franklin@ucr.edu.

     

    Description

    Location

    Duration & Date

    Impacted Buildings/ Facilities

    Lot 8

    Lot 8

    Permanently 

    Lot 8

    Lot 43

    Lot 43

    Indefinitely 

    Lot 43

    South Campus Drive

    South Campus Drive

    6/17 – 7/19

    South Campus Drive Road Closure 

    Anderson Park

    Anderson Park

    Indefinitely

    Anderson Park

  • 950592 UCR SBB - Construction Alert #84

    Current Week

    Construction Activities

     

    Location

    Activity

    Equipment Used

    Anticipated Disturbance

    SBB Site (Lot 8)

    Install Parapet Cap - RF

    NA

    NA

    SBB Site (Lot 8)

    Deck Edge Metal Panels at Windows – EXT-SW

    NA

    NA

    SBB Site (Lot 8)

    Install Window Shades – EXT-NE

    NA

    NA

    SBB Site (Lot 8)

    Deck Edge Metal Panels at Windows – EXT-NE

    NA

    NA

    SBB Site (Lot 8)

    Curtain Wall - Frames & Glass – Manlift Leavout

    NA

    NA

    SBB Site (Lot 8)

    Install Window Shades – Manlift Leavout

    NA

    NA

    SBB Site (Lot 8)

    Install Tile – RR-L1

    NA

    NA

    SBB Site (Lot 8)

    Install Cafe Equipment 

    NA

    NA

    SBB Site (Lot 8)

    Install Lights and Egress Lighting – INT-L1

    NA

    NA

    SBB Site (Lot 8)

    Install HVAC Grills & Diffusers – INT-L1

    NA

    NA

    SBB Site (Lot 8)

    Install Casework / Millwork (Wet) – INT-L1

    NA

    NA

    SBB Site (Lot 8)

    Final Overhead Inspections and Sign-off for Ceiling Tile – INT-L1

    NA

    NA

    SBB Site (Lot 8)

    Prime & Paint Walls – INT-AUD

    NA

    NA

    SBB Site (Lot 8)

    Toilet Partitions and Accessories – RR-L2

    NA

    NA

    SBB Site (Lot 8)

    Install Casework / Millwork (Remaining) – INT-L2

    NA

    NA

    SBB Site (Lot 8)

    Install Carpet & Base – INT-L2

    NA

    NA

    SBB Site (Lot 8)

    Install Doors & Hardware – INT-L2

    NA

    NA

    SBB Site (Lot 8)

    Install Tile – RR-L3

    NA

    NA

    SBB Site (Lot 8)

    Install Plumbing Fixtures – RR-L3

    NA

    NA

    SBB Site (Lot 8)

    Install Linoleum Flooring – INT-L3

    NA

    NA

    SBB Site (Lot 8)

    Install Doors & Hardware – INT-L3

    NA

    NA

    SBB Site (Lot 8)

    Install AV Devices – INT-L3

    NA

    NA

    SBB Site (Lot 8)

    Install Tile – RR-L4

    NA

    NA

    SBB Site (Lot 8)

    Install Acoustical Ceiling Tile – INT-L4

    NA

    NA

    SBB Site (Lot 8)

    Install Casework / Millwork (Wet) – INT-L4

    NA

    NA

    SBB Site (Lot 8)

    Install Doors & Hardware – INT-L4

    NA

    NA

    Anderson Park

    Install landscaping – SITE-AP

    Heavy Equipment

    Noise

    SBB Site (Lot 8)

    F/R/P Site Walls – SITE-N

    Heavy Equipment

    Noise

    SBB Site (Lot 8)

    F/R/P Curbs – SITE-E

    Heavy Equipment

    Noise

    SBB Site (Lot 8)

    F/R/P Seat Wall – SITE-E

    Heavy Equipment

    Noise

    SBB Site (Lot 8)

    Backfill & LID Planter Install – SITE-S

    Heavy Equipment

    Noise

     

    Week of June 24, 2024

    Construction Activities 

     

    Location

    Activity

    Equipment Used

    Anticipated Disturbance

    SBB Site (Lot 8)

    Install Permanent Roofing - RF

    NA

    NA

    SBB Site (Lot 8)

    Install Countertops – RR-L1

    NA

    NA

    SBB Site (Lot 8)

    Install Lights and Egress Lighting – INT-L1

    NA

    NA

    SBB Site (Lot 8)

    Install HVAC Grills & Diffusers – INT-L1

    NA

    NA

    SBB Site (Lot 8)

    Install Fire Sprinkler Drops / Heads – INT-L1

    NA

    NA

    SBB Site (Lot 8)

    Install Fire Alarm Devices – INT-L1

    NA

    NA

    SBB Site (Lot 8)

    Wood Ceiling Hangers / Grid Supports – INT-L1

    NA

    NA

    SBB Site (Lot 8)

    Install Casework / Millwork (Wet) – INT-L1

    NA

    NA

    SBB Site (Lot 8)

    Install Fire Sprinkler Drops / Heads – INT-AUD

    NA

    NA

    SBB Site (Lot 8)

    Install Fire Alarm Devices – INT-AUD

    NA

    NA

    SBB Site (Lot 8)

    Install Lights and Egress Lighting – INT-AUD

    NA

    NA

    SBB Site (Lot 8)

    Install HVAC Grills & Diffusers – INT-AUD

    NA

    NA

    SBB Site (Lot 8)

    Final Overhead Inspections and Sign-off for Ceiling Tile – INT-AUD

    NA

    NA

    SBB Site (Lot 8)

    Install Tile – RR-L2

    NA

    NA

    SBB Site (Lot 8)

    Wood Ceiling Hangers / Grid Supports – INT-L2

    NA

    NA

    SBB Site (Lot 8)

    Install Casework / Millwork (Remaining and Wet) – INT-L2

    NA

    NA

    SBB Site (Lot 8)

    Install Carpet & Base – INT-L2

    NA

    NA

    SBB Site (Lot 8)

    Install AV Devices – INT-L2

    NA

    NA

    SBB Site (Lot 8)

    Install Tile – RR-L3

    NA

    NA

    SBB Site (Lot 8)

    Install Linoleum Flooring – INT-L3

    NA

    NA

    SBB Site (Lot 8)

    Install Lockers – INT-L3

    NA

    NA

    SBB Site (Lot 8)

    Install Casework / Millwork (Wet) – INT-L3

    NA

    NA

    SBB Site (Lot 8)

    Install Tile – RR-L4

    NA

    NA

    SBB Site (Lot 8)

    Install Telecom Devices – INT-L4

    NA

    NA

    SBB Site (Lot 8)

    Install Electrical Cover Plates – INT-L4

    NA

    NA

    SBB Site (Lot 8)

    Install Security Devices – INT-L4

    NA

    NA

    Anderson Park

    Install Interior Glazing – INT-L4

    NA

    NA

    SBB Site (Lot 8)

    Install Acoustical Ceiling Tile – INT-L4

    NA

    NA

    SBB Site (Lot 8)

    Install Casework / Millwork (Wet) – INT-L4

    NA

    NA

    SBB Site (Lot 8)

    Install Site Furnishings – SITE-AP

    Heavy Equipment

    Noise

    Anderson Park

    Install Irrigation Sleeves – SITE-N

    Heavy Equipment

    Noise

    SBB Site (Lot 8)

    Install Site Lighting Underground – SITE-N

    Heavy Equipment

    Noise

    SBB Site (Lot 8)

    Install Site Lighting Underground – SITE-E

    Heavy Equipment

    Noise

    SBB Site (Lot 8)

    Install Site Lighting Underground – SITE-S

    Heavy Equipment

    Noise

    SBB Site (Lot 8)

    F/R/P Curb & Gutter – SITE-S

    Heavy Equipment

    Noise

    SBB Site (Lot 8)

    Rough Grade / Cut Curbs – SITE-W

    Heavy Equipment

    Noise

    SBB Site (Lot 8)

    Install Irrigation Sleeves – SITE-W

    Heavy Equipment

    Noise

    SBB Site (Lot 8)

    Install Site Lighting Underground – SITE-W

    Heavy Equipment

    Noise

     

    Week of July 1, 2024

    Construction Activities

     

    Location

    Activity

    Equipment Used

    Anticipated Disturbance

    SBB Site (Lot 8)

    Complete Hardscape Finish Site Work at Manlift Leaveout – EXT-ML

    NA

    NA

    SBB Site (Lot 8)

    Seal Concrete Floor – INT-L1

    NA

    NA

    SBB Site (Lot 8)

    Install Doors & Hardware – INT-L1

    NA

    NA

    SBB Site (Lot 8)

    Set Plumbing Finishes – INT-L1

    NA

    NA

    SBB Site (Lot 8)

    Final Coat of Paint – INT-L1

    NA

    NA

    SBB Site (Lot 8)

    Install Linoleum Flooring – INT-L1

    NA

    NA

    SBB Site (Lot 8)

    Install Signage – INT-AUD

    NA

    NA

    SBB Site (Lot 8)

    Install FEC's – INT-AUD

    NA

    NA

    SBB Site (Lot 8)

    Install Doors & Hardware – INT-AUD

    NA

    NA

    SBB Site (Lot 8)

    Install Wall Protection – INT-AUD

    NA

    NA

    SBB Site (Lot 8)

    Install Wood Wall Panels – INT-AUD

    NA

    NA

    SBB Site (Lot 8)

    Install FF&E – INT-AUD

    NA

    NA

    SBB Site (Lot 8)

    Acoustical Wall Panels – INT-AUD

    NA

    NA

    SBB Site (Lot 8)

    Final Coat of Paint – RR-L2

    NA

    NA

    SBB Site (Lot 8)

    Install FEC's – INT-L2

    NA

    NA

    SBB Site (Lot 8)

    Set Plumbing Finishes – INT-L2

    NA

    NA

    SBB Site (Lot 8)

    Install Electrical Finishes – RR-L3

    NA

    NA

    SBB Site (Lot 8)

    Install FEC's – INT-L3

    NA

    NA

    SBB Site (Lot 8)

    Set Plumbing Finishes – INT-L3

    NA

    NA

    SBB Site (Lot 8)

    Measure / Fab / Install Countertops (Remaining) – INT-L3 

    NA

    NA

    SBB Site (Lot 8)

    Install FF&E – INT-L3

    NA

    NA

    SBB Site (Lot 8)

    Toilet Partitions and Accessories – RR-L4

    NA

    NA

    SBB Site (Lot 8)

    Install FEC's – INT-L4

    NA

    NA

    SBB Site (Lot 8)

    Set Plumbing Finishes – INT-L4

    NA

    NA

    SBB Site (Lot 8)

    Install Casework / Millwork (Remaining) – INT-L4

    NA

    NA

    SBB Site (Lot 8)

    Fine Grade – SITE-E

    Heavy Equipment

    Noise

    SBB Site (Lot 8)

    F/R/P Curb & Gutter – SITE-W

    Heavy Equipment

    Noise

    SBB Site (Lot 8)

    F/R/P Curb & Gutter – SITE-CD

    Heavy Equipment

    Noise

    SBB (Lot 8)

    Air Balance - Level 3 – SU-TB

    NA

    NA

     

    Current and Upcoming Anticipated Closures

    The following shutdown(s)/ closures are anticipated as indicated below. Updates to this schedule will be released weekly in the Project Construction Advisories until the work is complete.  Please contact John Franklin with any specific questions or concerns at john.franklin@ucr.edu.

     

    Description

    Location

    Duration & Date

    Impacted Buildings/ Facilities

    Lot 8

    Lot 8

    Permanently 

    Lot 8

    Lot 43

    Lot 43

    Indefinitely 

    Lot 43

    South Campus Drive

    South Campus Drive

    6/17 – 7/19

    South Campus Drive Road Closure 

    Anderson Park

    Anderson Park

    Indefinitely

    Anderson Park

     

  • 950592 UCR SBB - Construction Alert #83

    Current Week

    Construction Activities

     

    Location

    Activity

    Equipment Used

    Anticipated Disturbance

    SBB (Lot 8) 

    Install Permanent Roofing - Roof

    NA

    NA

    SBB (Lot 8)

    Boardroom Curtain Wall – EXT-SW

    NA

    NA

    SBB (Lot 8)

    Install Window Shades – EXT-NE

    NA

    NA

    SBB (Lot 8) 

    Demo Manlift Pad and Grade

    NA

    NA

    SBB (Lot 8)

    Curtain Wall frames and Glass at Manlift Leave out

    NA

    NA

    SBB (Lot 8)

    Install Countertops – RR

    NA

    NA

    SBB (Lot 8)

    Install Tile – RR

    NA

    NA

    SBB (Lot 8)

    Install café Equipment 

    NA

    NA

    SBB (Lot 8)

    Install Lights and Egress Lighting – INT-L1

    NA

    NA

    SBB (Lot 8) 

    Install HVAC Grills & Diffusers  – INT-L1

    NA

    NA

    SBB (Lot 8)

    Install Fire Sprinkler Drops / Heads  – INT-L1

    NA

    NA

    SBB (Lot 8)

    Install Fire Alarm Devices  – INT-L1

    NA

    NA

    SBB (Lot 8)

    Wood Ceiling Hangers / Grid Supports  – INT-L1

    NA

    NA

    SBB (Lot 8)

    Install Casework / Millwork (Wet) – INT-L1

    NA

    NA

    SBB (Lot 8)

    Install Acoustical Ceiling Tile  – AUD

    NA

    NA

    SBB (Lot 8)

    Remove Dancefloor - AUD

    NA

    NA

    SBB (Lot 8) 

    Install Plumbing Fixtures – RR-L2

    NA

    NA

    SBB (Lot 8)

    Install AV Devics – INT-L2

    NA

    NA

    SBB (Lot 8)

    Install Casework / Millwork (Remaining) – INT-L2

    NA

    NA

    SBB (Lot 8) 

    Install Casework / Millwork (Wet) – INT-L2

    NA

    NA

    SBB (Lot 8)

    Install Carpet & Base – INT-L2

    NA

    NA

    SBB (Lot 8) 

    Install Tile – RR-L3

    NA

    NA

    SBB (Lot 8)

    Install Linoleum - INT-L3

    NA

    NA

    SBB (Lot 8) 

    Install Lockers – INT-L3

    NA

    NA

    SBB (Lot 8)

    Insall Casework / Millwork (Wet) – INT – L3

    NA

    NA

    SBB (Lot 8) 

    Install Tile – RR-L4

    NA

    NA

    SBB (Lot 8)

    Install Telecom Devices – INT-L4

    NA

    NA

    SBB (Lot 8)

    Install Electrical Cover Plates – INT-L4

    NA

    NA

    SBB (Lot 8)

    Install Security Devices– INT-L4

    NA

    NA

    SBB (Lot 8)

    Install Interior Glazing– INT-L4

    NA

    NA

    SBB (Lot 8)

    Install Acoustical Ceiling Tile– INT-L4

    NA

    NA

    SBB (Lot 8)

    Install Casework / Millwork (Wet) – INT-L4

    NA

    NA

    Anderson Park

    Install Irrigation – SITE-AP

    Heavy Equipment

    Noise

    Anderson Park

    Rough Grade / Cut Curbs – SITE-East & South

    Heavy Equipment

    Noise

    SBB Site (Lot 8)

    F/R/P Site Walls – SITE-N

    Heavy Equipment

    Noise

    SBB Site (Lot 8)

    Install Site Lighting Underground – SITE-E

    Heavy Equipment

    Noise

    SBB Site (Lot 8)

    F/R/P Curb & Gutter – SITE-S

    Heavy Equipment

    Noise

     

    Week of June 17, 2024

    Construction Activities

     

    Location

    Activity

    Equipment Used

    Anticipated Disturbance

    SBB (Lot 8) 

    Install Parapet Cap - RF

    NA

    NA

    SBB (Lot 8)

    Deck Edge Metal Panels at Windows – EXT-SW

    NA

    NA

    SBB (Lot 8)

    Install Window Shades – EXT-NE

    NA

    NA

    SBB (Lot 8) 

    Deck Edge Metal Panels at Windows – EXT-NE

    NA

    NA

    SBB (Lot 8)

    Curtain Wall - Frames & Glass – Manlift Leavout

    NA

    NA

    SBB (Lot 8)

    Install Window Shades – Manlift Leavout

    NA

    NA

    SBB (Lot 8)

    Install Tile – RR-L1

    NA

    NA

    SBB (Lot 8)

    Install Cafe Equipment 

    NA

    NA

    SBB (Lot 8)

    Install Lights and Egress Lighting – INT-L1

    NA

    NA

    SBB (Lot 8) 

    Install HVAC Grills & Diffusers – INT-L1

    NA

    NA

    SBB (Lot 8)

    Install Casework / Millwork (Wet) – INT-L1

    NA

    NA

    SBB (Lot 8)

    Final Overhead Inspections and Sign-off for Ceiling Tile – INT-L1

    NA

    NA

    SBB (Lot 8)

    Prime & Paint Walls – INT-AUD

    NA

    NA

    SBB (Lot 8)

    Toilet Partitions and Accessories – RR-L2

    NA

    NA

    SBB (Lot 8)

    Install Casework / Millwork (Remaining) – INT-L2

    NA

    NA

    SBB (Lot 8)

    Install Carpet & Base – INT-L2

    NA

    NA

    SBB (Lot 8) 

    Install Doors & Hardware – INT-L2

    NA

    NA

    SBB (Lot 8)

    Install Tile – RR-L3

    NA

    NA

    SBB (Lot 8)

    Install Plumbing Fixtures – RR-L3

    NA

    NA

    SBB (Lot 8)

    Install Linoleum Flooring – INT-L3

    NA

    NA

    SBB (Lot 8)

    Install Doors & Hardware – INT-L3

    NA

    NA

    SBB (Lot 8)

    Install AV Devices – INT-L3

    NA

    NA

    SBB (Lot 8)

    Install Tile – RR-L4

    NA

    NA

    SBB (Lot 8)

    Install Acoustical Ceiling Tile – INT-L4

    NA

    NA

    SBB (Lot 8)

    Install Casework / Millwork (Wet) – INT-L4

    NA

    NA

    SBB (Lot 8)

    Install Doors & Hardware – INT-L4

    NA

    NA

    Anderson Park

    Install landscaping – SITE-AP

    Heavy Equipment

    Noise

    SBB Site (Lot 8)

    F/R/P Site Walls – SITE-N

    Heavy Equipment

    Noise

    SBB Site (Lot 8)

    F/R/P Curbs – SITE-E

    Heavy Equipment

    Noise

    SBB Site (Lot 8)

    F/R/P Seat Wall – SITE-E

    Heavy Equipment

    Noise

    SBB Site (Lot 8)

    Backfill & LID Planter Install – SITE-S

    Heavy Equipment

    Noise

     

    Week of June 24, 2024

    Construction Activities 

     

    Location

    Activity

    Equipment Used

    Anticipated Disturbance

    SBB (Lot 8) 

    Install Permanent Roofing - RF

    NA

    NA

    SBB (Lot 8)

    Install Countertops – RR-L1

    NA

    NA

    SBB (Lot 8)

    Install Lights and Egress Lighting – INT-L1

    NA

    NA

    SBB (Lot 8) 

    Install HVAC Grills & Diffusers – INT-L1

    NA

    NA

    SBB (Lot 8)

    Install Fire Sprinkler Drops / Heads – INT-L1

    NA

    NA

    SBB (Lot 8)

    Install Fire Alarm Devices – INT-L1

    NA

    NA

    SBB (Lot 8)

    Wood Ceiling Hangers / Grid Supports – INT-L1

    NA

    NA

    SBB (Lot 8)

    Install Casework / Millwork (Wet) – INT-L1

    NA

    NA

    SBB (Lot 8)

    Install Fire Sprinkler Drops / Heads – INT-AUD

    NA

    NA

    SBB (Lot 8) 

    Install Fire Alarm Devices – INT-AUD

    NA

    NA

    SBB (Lot 8)

    Install Lights and Egress Lighting – INT-AUD

    NA

    NA

    SBB (Lot 8)

    Install HVAC Grills & Diffusers – INT-AUD

    NA

    NA

    SBB (Lot 8)

    Final Overhead Inspections and Sign-off for Ceiling Tile – INT-AUD

    NA

    NA

    SBB (Lot 8)

    Install Tile – RR-L2

    NA

    NA

    SBB (Lot 8)

    Wood Ceiling Hangers / Grid Supports – INT-L2

    NA

    NA

    SBB (Lot 8)

    Install Casework / Millwork (Remaining and Wet) – INT-L2

    NA

    NA

    SBB (Lot 8) 

    Install Carpet & Base – INT-L2

    NA

    NA

    SBB (Lot 8)

    Install AV Devices – INT-L2

    NA

    NA

    SBB (Lot 8)

    Install Tile – RR-L3

    NA

    NA

    SBB (Lot 8)

    Install Linoleum Flooring – INT-L3

    NA

    NA

    SBB (Lot 8)

    Install Lockers – INT-L3

    NA

    NA

    SBB (Lot 8)

    Install Casework / Millwork (Wet) – INT-L3

    NA

    NA

    SBB (Lot 8)

    Install Tile – RR-L4

    NA

    NA

    SBB (Lot 8)

    Install Telecom Devices – INT-L4

    NA

    NA

    SBB (Lot 8)

    Install Electrical Cover Plates – INT-L4

    NA

    NA

    SBB (Lot 8)

    Install Security Devices – INT-L4

    NA

    NA

    Anderson Park

    Install Interior Glazing – INT-L4

    NA

    NA

    SBB Site (Lot 8)

    Install Acoustical Ceiling Tile – INT-L4

    NA

    NA

    SBB Site (Lot 8)

    Install Casework / Millwork (Wet) – INT-L4

    NA

    NA

    SBB Site (Lot 8)

    Install Site Furnishings – SITE-AP

    Heavy Equipment

    Noise

    Anderson Park

    Install Irrigation Sleeves – SITE-N

    Heavy Equipment

    Noise

    SBB Site (Lot 8)

    Install Site Lighting Underground – SITE-N

    Heavy Equipment

    Noise

    SBB Site (Lot 8)

    Install Site Lighting Underground – SITE-E

    Heavy Equipment

    Noise

    SBB Site (Lot 8)

    Install Site Lighting Underground – SITE-S

    Heavy Equipment

    Noise

    SBB Site (Lot 8)

    F/R/P Curb & Gutter – SITE-S

    Heavy Equipment

    Noise

    SBB Site (Lot 8)

    Rough Grade / Cut Curbs – SITE-W

    Heavy Equipment

    Noise

    SBB Site (Lot 8)

    Install Irrigation Sleeves – SITE-W

    Heavy Equipment

    Noise

    SBB Site (Lot 8)

    Install Site Lighting Underground – SITE-W

    Heavy Equipment

    Noise

     

    Current and Upcoming Anticipated Closures

    The following shutdown(s)/ closures are anticipated as indicated below. Updates to this schedule will be released weekly in the Project Construction Advisories until the work is complete.  Please contact John Franklin with any specific questions or concerns at john.franklin@ucr.edu.

     

    Description

    Location

    Duration & Date

    Impacted Buildings/ Facilities

    Lot 8

    Lot 8

    Permanently 

    Lot 8

    Lot 43

    Lot 43

    Indefinitely 

    Lot 43

    South Campus Drive

    South Campus Drive

    6/17 – 7/19

    South Campus Drive Road Closure 

    Anderson Park

    Anderson Park

    Indefinitely

    Anderson Park

  • 950592 UCR SBB - Construction Alert #82

    Current Week

    Construction Activities

     

    Location

    Activity

    Equipment Used

    Anticipated Disturbance

    SBB (Lot 8) 

    Install Permanent Roofing – Low Roof

    NA

    NA

    SBB (Lot 8)

    Curtain Wall – Frames and Glass

    NA

    NA

    SBB (Lot 8)

    Precast Panels – EXT-L1

    NA

    NA

    SBB (Lot 8) 

    Set and Grout Thin Brick – Manlift Leavout

    NA

    NA

    SBB (Lot 8)

    Caulking – Manlift Leavout

    NA

    NA

    SBB (Lot 8)

    Remove Scaffold – Manlift Leavout

    NA

    NA

    SBB (Lot 8)

    Seal Concrete Floor – Café

    NA

    NA

    SBB (Lot 8)

    Install Lights and Egress Lighting – INT-L1

    NA

    NA

    SBB (Lot 8)

    Install HVAC Grills & Diffusers – INT-L1

    NA

    NA

    SBB (Lot 8) 

    Final Overhead Inspections and Sign-off for Ceiling Tile – INT-AUD

    NA

    NA

    SBB (Lot 8)

    Install Tile – RR-L2

    NA

    NA

    SBB (Lot 8)

    Install Countertops – RR-L3

    NA

    NA

    SBB (Lot 8)

    Install Interior Glazing – INT-L3

    NA

    NA

    SBB (Lot 8)

    Install Acoustical Ceiling Tile – INT-L3

    NA

    NA

    SBB (Lot 8)

    Prime & 1st Coat of Paint, Walls & Ceilings – RR-L4

    NA

    NA

    SBB (Lot 8)

    Install Countertops – RR-L4

    NA

    NA

    Anderson Park

    Install Site Furnishings – SITE-AP

    Heavy Equipment

    Noise

    Anderson Park

    Install Irrigation – SITE-AP

    Heavy Equipment

    Noise

    SBB (Lot 8)

    Rough Grade / Cut Curbs – SITE-East & South

    Heavy Equipment

    Noise

     

    Week of June 10, 2024

    Construction Activities

     

    Location

    Activity

    Equipment Used

    Anticipated Disturbance

    SBB (Lot 8) 

    Install Permanent Roofing - Roof

    NA

    NA

    SBB (Lot 8)

    Boardroom Curtain Wall – EXT-SW

    NA

    NA

    SBB (Lot 8)

    Install Window Shades – EXT-NE

    NA

    NA

    SBB (Lot 8) 

    Demo Manlift Pad and Grade

    NA

    NA

    SBB (Lot 8)

    Curtain Wall frames and Glass at Manlift Leave out

    NA

    NA

    SBB (Lot 8)

    Install Countertops – RR

    NA

    NA

    SBB (Lot 8)

    Install Tile – RR

    NA

    NA

    SBB (Lot 8)

    Install café Equipment 

    NA

    NA

    SBB (Lot 8)

    Install Lights and Egress Lighting – INT-L1

    NA

    NA

    SBB (Lot 8) 

    Install HVAC Grills & Diffusers  – INT-L1

    NA

    NA

    SBB (Lot 8)

    Install Fire Sprinkler Drops / Heads  – INT-L1

    NA

    NA

    SBB (Lot 8)

    Install Fire Alarm Devices  – INT-L1

    NA

    NA

    SBB (Lot 8)

    Wood Ceiling Hangers / Grid Supports  – INT-L1

    NA

    NA

    SBB (Lot 8)

    Install Casework / Millwork (Wet) – INT-L1

    NA

    NA

    SBB (Lot 8)

    Install Acoustical Ceiling Tile  – AUD

    NA

    NA

    SBB (Lot 8)

    Remove Dancefloor - AUD

    NA

    NA

    SBB (Lot 8) 

    Install Plumbing Fixtures – RR-L2

    NA

    NA

    SBB (Lot 8)

    Install AV Devics – INT-L2

    NA

    NA

    SBB (Lot 8)

    Install Casework / Millwork (Remaining) – INT-L2

    NA

    NA

    SBB (Lot 8) 

    Install Casework / Millwork (Wet) – INT-L2

    NA

    NA

    SBB (Lot 8)

    Install Carpet & Base – INT-L2

    NA

    NA

    SBB (Lot 8) 

    Install Tile – RR-L3

    NA

    NA

    SBB (Lot 8)

    Install Linoleum - INT-L3

    NA

    NA

    SBB (Lot 8) 

    Install Lockers – INT-L3

    NA

    NA

    SBB (Lot 8)

    Insall Casework / Millwork (Wet) – INT – L3

    NA

    NA

    SBB (Lot 8) 

    Install Tile – RR-L4

    NA

    NA

    SBB (Lot 8)

    Install Telecom Devices – INT-L4

    NA

    NA

    SBB (Lot 8)

    Install Electrical Cover Plates – INT-L4

    NA

    NA

    SBB (Lot 8)

    Install Security Devices– INT-L4

    NA

    NA

    SBB (Lot 8)

    Install Interior Glazing– INT-L4

    NA

    NA

    SBB (Lot 8)

    Install Acoustical Ceiling Tile– INT-L4

    NA

    NA

    SBB (Lot 8)

    Install Casework / Millwork (Wet) – INT-L4

    NA

    NA

    Anderson Park

    Install Irrigation – SITE-AP

    Heavy Equipment

    Noise

    Anderson Park

    Rough Grade / Cut Curbs – SITE-East & South

    Heavy Equipment

    Noise

    SBB Site (Lot 8)

    F/R/P Site Walls – SITE-N

    Heavy Equipment

    Noise

    SBB Site (Lot 8)

    Install Site Lighting Underground – SITE-E

    Heavy Equipment

    Noise

    SBB Site (Lot 8)

    F/R/P Curb & Gutter – SITE-S

    Heavy Equipment

    Noise

     

    Week of June 17, 2024

    Construction Activities 

     

    Location

    Activity

    Equipment Used

    Anticipated Disturbance

    SBB (Lot 8) 

    Install Parapet Cap - RF

    NA

    NA

    SBB (Lot 8)

    Deck Edge Metal Panels at Windows – EXT-SW

    NA

    NA

    SBB (Lot 8)

    Install Window Shades – EXT-NE

    NA

    NA

    SBB (Lot 8) 

    Deck Edge Metal Panels at Windows – EXT-NE

    NA

    NA

    SBB (Lot 8)

    Curtain Wall - Frames & Glass – Manlift Leavout

    NA

    NA

    SBB (Lot 8)

    Install Window Shades – Manlift Leavout

    NA

    NA

    SBB (Lot 8)

    Install Tile – RR-L1

    NA

    NA

    SBB (Lot 8)

    Install Cafe Equipment 

    NA

    NA

    SBB (Lot 8)

    Install Lights and Egress Lighting – INT-L1

    NA

    NA

    SBB (Lot 8) 

    Install HVAC Grills & Diffusers – INT-L1

    NA

    NA

    SBB (Lot 8)

    Install Casework / Millwork (Wet) – INT-L1

    NA

    NA

    SBB (Lot 8)

    Final Overhead Inspections and Sign-off for Ceiling Tile – INT-L1

    NA

    NA

    SBB (Lot 8)

    Prime & Paint Walls – INT-AUD

    NA

    NA

    SBB (Lot 8)

    Toilet Partitions and Accessories – RR-L2

    NA

    NA

    SBB (Lot 8)

    Install Casework / Millwork (Remaining) – INT-L2

    NA

    NA

    SBB (Lot 8)

    Install Carpet & Base – INT-L2

    NA

    NA

    SBB (Lot 8) 

    Install Doors & Hardware – INT-L2

    NA

    NA

    SBB (Lot 8)

    Install Tile – RR-L3

    NA

    NA

    SBB (Lot 8)

    Install Plumbing Fixtures – RR-L3

    NA

    NA

    SBB (Lot 8)

    Install Linoleum Flooring – INT-L3

    NA

    NA

    SBB (Lot 8)

    Install Doors & Hardware – INT-L3

    NA

    NA

    SBB (Lot 8)

    Install AV Devices – INT-L3

    NA

    NA

    SBB (Lot 8)

    Install Tile – RR-L4

    NA

    NA

    SBB (Lot 8)

    Install Acoustical Ceiling Tile – INT-L4

    NA

    NA

    SBB (Lot 8)

    Install Casework / Millwork (Wet) – INT-L4

    NA

    NA

    SBB (Lot 8)

    Install Doors & Hardware – INT-L4

    NA

    NA

    Anderson Park

    Install landscaping – SITE-AP

    Heavy Equipment

    Noise

    SBB Site (Lot 8)

    F/R/P Site Walls – SITE-N

    Heavy Equipment

    Noise

    SBB Site (Lot 8)

    F/R/P Curbs – SITE-E

    Heavy Equipment

    Noise

    SBB Site (Lot 8)

    F/R/P Seat Wall – SITE-E

    Heavy Equipment

    Noise

    SBB Site (Lot 8)

    Backfill & LID Planter Install – SITE-S

    Heavy Equipment

    Noise

     

    Current and Upcoming Anticipated Closures

    The following shutdown(s)/ closures are anticipated as indicated below. Updates to this schedule will be released weekly in the Project Construction Advisories until the work is complete.  Please contact John Franklin with any specific questions or concerns at john.franklin@ucr.edu.

     

    Description

    Location

    Duration & Date

    Impacted Buildings/ Facilities

    Lot 8

    Lot 8

    Permanently 

    Lot 8

    Lot 43

    Lot 43

    Indefinitely 

    Lot 43

    South Campus Drive

    South Campus Drive

    6/17 – 7/19

    South Campus Drive Road Closure 

    Anderson Park

    Anderson Park

    Indefinitely

    Anderson Park

  • 950592 UCR SBB - Construction Alert #81

    Current Week

    Construction Activities

     

    Location

    Activity

    Equipment Used

    Anticipated Disturbance

    SBB (Lot 8) 

    Precast Panels – EXT-L1

    NA

    NA

    SBB (Lot 8)

    Curtain Wall - Frames & Glass CW25-26, 28-31 (L3/L4) – EXT-NE

    NA

    NA

    SBB (Lot 8)

    Set & Grout Thin Brick – Manlift Leaveout

    NA

    NA

    SBB (Lot 8) 

    Prime & 1st Coat of Paint, Walls & Ceilings – RR-L1

    NA

    NA

    SBB (Lot 8)

    Install Acoustical Grid – INT-L1

    NA

    NA

    SBB (Lot 8)

    Prime & Paint Hardlids at Fixture Leaveout

    NA

    NA

    SBB (Lot 8)

    Install Fire Sprinkler Drops / Heads

    NA

    NA

    SBB (Lot 8)

    Install Fire Alarm Devices

    NA

    NA

    SBB (Lot 8)

    Install Lights and Egress Lighting

    NA

    NA

    SBB (Lot 8) 

    Install HVAC Grills & Diffusers

    NA

    NA

    SBB (Lot 8)

    Install Countertops – RR-L2

    NA

    NA

    SBB (Lot 8)

    Install Tile – RR-L2

    NA

    NA

    SBB (Lot 8)

    Prime & 1st Coat of Paint, Walls & Ceilings – RR-L3

    NA

    NA

    SBB (Lot 8)

    Install Telecom Devices – INT-L3

    NA

    NA

    SBB (Lot 8)

    Install Electrical Cover Plates – INT-L3

    NA

    NA

    SBB (Lot 8)