School of Business New Building
The new School of Business building complex will be a flagship facility, serving as the permanent home for the School. The building will complement the School of Business’ existing space program and fully address enrollment-driven needs in pursuit of their aspiration to become the premier center of management research and education in the Inland Empire.
Project Scope:
The proposed building will provide about 38,500 ASF within approximately to 63,400 GSF, along with exterior circulation and gathering areas. The program includes the following spaces:
- Classrooms and Educational Spaces
- Student Support Spaces
- Academic Offices and Support Spaces
- Administrative Offices and Support Spaces
- Shared Building Resources (Lobby, Multipurpose room(s) etc)
School of Business Project Updates
-
950592 UCR SBB - Construction Alert #44
Current Weeks
Construction Activities
Location
Activity
Equipment Used
Anticipated Disturbance
BIO
Install Metal Decking
Gradall
Noise due to equipment
BIO
Framing and Insulation
Gradall
Noise due to equipment
SBB (Lot 8) Concrete
Deck Pour – L2N
Concrete Pumps
Noise due to equipment
SBB (Lot 8) Concrete
Strip Edge Form – L2N
NA
NA
SBB (Lot 8) Concrete
Layout Walls and Columns – L2N
NA
NA
SBB (Lot 8) Concrete
Rebar – L2N
Crane
Noise due to Equipment
SBB (Lot 8) Concrete
Layout and Install MEPs – L2N
NA
NA
SBB (Lot 8) Concrete
Set Embeds – L2N
NA
NA
SBB (Lot 8) Concrete
Electrical Rough-in – L2S
NA
NA
SBB (Lot 8) Concrete
Deck Pour – L2S
Concrete Pumps
Noise due to equipment
SBB (Lot 8) Concrete
Deck Depressions – L2S
NA
NA
SBB (Lot 8) Concrete
Install Embeds – L2S
N/A
N/A
SBB (Lot 8) Concrete
Install Embeds – L2S
N/A
N/A
SBB (Lot 8) Concrete
Rebar / PT Cables – L2S
Crane
Noise due to Equipment
Week of September 18, 2023
Construction Activities
Location
Activity
Equipment Used
Anticipated Disturbance
BIO
Parapet Coping/Flashing/Louvers
NA
NA
BIO
Downspouts
NA
NA
BIO
In-Wall and overhead plumbing work
NA
NA
BIO
Set fan coil units
NA
NA
SBB (Lot 8) Concrete
Strip & Re-Shore – Deck L2N
Crane
Noise due to Equipment
SBB (Lot 8) Concrete
Layout and Install MEP’s – Vertical L2N
NA
NA
SBB (Lot 8) Concrete
Set Embeds – Vertical L2N
NA
NA
SBB (Lot 8) Concrete
QC / Inspection– Vertical L2N
NA
NA
SBB (Lot 8) Concrete
Close Two Side Forms– Vertical L2N
Crane
Noise due to Equipment
SBB (Lot 8) Concrete
Pour– Vertical L2N
Concrete Pumps
Noise due to equipment
SBB (Lot 8) Concrete
Pour – Deck L2S
Concrete Pumps
Noise due to equipment
SBB (Lot 8) Concrete
Strip Edge Form – Deck L2S
NA
NA
SBB (Lot 8) Concrete
Stress Transfer Beams– Deck L2S
NA
NA
SBB (Lot 8) Concrete
Layout Walls and Columns – Vert L2S
NA
NA
SBB (Lot 8) Concrete
One side form walls and columns – Vert L2S
Crane
Noise due to Equipment
SBB (Lot 8) Concrete
Rebar – Vert L2S
NA
NA
SBB (Lot 8) Concrete
Layout and Install MEP’s – Vert L2S
NA
NA
Week of September 25, 2023
Construction Activities
Location
Activity
Equipment Used
Anticipated Disturbance
BIO
In-Wall & Overhead Electrical Rough-in
NA
NA
BIO
Pull Electrical and Low Voltage Wire
NA
NA
BIO
Fine Grade for Finish Site Work
Heavy Equipment
Noise due to Equipment
BIO
F/R/P Equipment Pads
NA
NA
BIO
F/R/P New Flatwork to Tie Into Existing
NA
NA
SBB (Lot 8) Concrete
Strip Walls and Columns – Vertical L2N
NA
NA
SBB (Lot 8) Concrete
Set Embeds - Vertical L2S
NA
NA
SBB (Lot 8) Concrete
QC Inspection - Vertical L2S
NA
NA
SBB (Lot 8) Concrete
Close two side forms - Vertical L2S
Crane
Noise due to Equipment
SBB (Lot 8) Concrete
Pour - Vertical L2S
Concrete Pump
Noise due to Equipment
SBB (Lot 8) Concrete
Strip walls & Columns - Vertical L2S
Crane
Noise due to Equipment
SBB (Lot 8) Concrete
Form Deck – Deck L3N
Crane
Noise due to Equipment
SBB (Lot 8) Concrete
Edge Form – Deck L3N
NA
NA
Current and Upcoming Anticipated Closures
The following shutdown(s)/ closures are anticipated as indicated below. Updates to this schedule will be released weekly in the Project Construction Advisories until the work is complete. Please contact John Franklin with any specific questions or concerns at john.franklin@ucr.edu.
Description
Location
Duration & Date
Impacted Buildings/ Facilities
Lot 8
Lot 8
Permanently
Lot 8
Lot 43
Lot 43
Indefinitely
Lot 43
Anderson Park
Anderson Park
Indefinitely
Anderson Park
-
950592 UCR SBB - Construction Alert #43
Current Weeks
Construction Activities
Location
Activity
Equipment Used
Anticipated Disturbance
BIO
Concrete
Pour SOG
Concrete Pump
Noise due to Equipment
BIO
Backfill
Mini-Excavator
Noise due to Equipment
BIO
Erect Steel Roof Structure
N/A
N/A
SBB (Lot 8) Concrete
MEP Sleeves and Inserts – L2N
N/A
N/A
SBB (Lot 8) Concrete
Rebar / PT Cables – L2N
Crane
Noise due to Equipment
SBB (Lot 8) Concrete
Electrical Rough-in – L2N
N/A
N/A
SBB (Lot 8) Concrete
Deck Depressions – L2N
N/A
N/A
SBB (Lot 8) Concrete
Edge Form – L2S
N/A
N/A
SBB (Lot 8) Concrete
QC / Inspection – L2N
N/A
N/A
SBB (Lot 8) Concrete
Edge Form L2S
N/A
N/A
SBB (Lot 8) Concrete
Install Embeds – L2S
N/A
N/A
SBB (Lot 8) Concrete
MEP Sleeves and Inserts – L2S
N/A
N/A
SBB (Lot 8) Concrete
Rebar / PT Cables – L2S
Crane
Noise due to Equipment
Week of September 11, 2023
Construction Activities
Location
Activity
Equipment Used
Anticipated Disturbance
BIO
Install Metal Decking
Gradall
Noise due to equipment
SBB (Lot 8) Concrete
Deck Pour – L2N
Concrete Pumps
Noise due to equipment
SBB (Lot 8) Concrete
Strip Edge Form – L2N
NA
NA
SBB (Lot 8) Concrete
Layout Walls and Columns – L2N
NA
NA
SBB (Lot 8) Concrete
Rebar – L2N
Crane
Noise due to Equipment
SBB (Lot 8) Concrete
Layout and Install MEPs – L2N
NA
NA
SBB (Lot 8) Concrete
Set Embeds – L2N
NA
NA
SBB (Lot 8) Concrete
Electrical Rough-in – L2S
NA
NA
SBB (Lot 8) Concrete
Deck Pour – L2S
Concrete Pumps
Noise due to equipment
SBB (Lot 8) Concrete
Deck Depressions – L2S
NA
NA
Week of September 18, 2023
Construction Activities
Location
Activity
Equipment Used
Anticipated Disturbance
BIO
Install Door Frames
NA
NA
BIO
Install Doors and Hardware
NA
NA
BIO
Install Roofing System
Gradall
Noise due to equipment
BIO
Install Electrical Panels
NA
NA
SBB (Lot 8) Concrete
Strip & Re-Shore – L2N
Crane
Noise due to Equipment
SBB (Lot 8) Concrete
Vertical Pour – L2N
Concrete Pumps
Noise due to equipment
SBB (Lot 8) Concrete
Strip Walls and Columns – L2N
Crane
Noise due to Equipment
SBB (Lot 8) Concrete
Rebar – L2S
Crane
Noise due to Equipment
SBB (Lot 8) Concrete
Layout and Install MEPs – L2S
NA
NA
SBB (Lot 8) Concrete
Set Embeds – L2S
NA
NA
SBB (Lot 8) Concrete
Form Deck – L3N
NA
NA
Current and Upcoming Anticipated Closures
The following shutdown(s)/ closures are anticipated as indicated below. Updates to this schedule will be released weekly in the Project Construction Advisories until the work is complete. Please contact John Franklin with any specific questions or concerns at john.franklin@ucr.edu.
Description
Location
Duration & Date
Impacted Buildings/ Facilities
Lot 8
Lot 8
Permanently
Lot 8
Lot 43
Lot 43
Indefinitely
Lot 43
Anderson Park
Anderson Park
Indefinitely
Anderson Park
-
950592 UCR SBB - Construction Alert #42
Current Weeks
Construction Activities
Location
Activity
Equipment Used
Anticipated Disturbance
BIO
Concrete
Fine Grade – SOG
N/A
N/A
BIO
Concrete
Vapor Barrier – SOG
N/A
N/A
BIO
Concrete
Rebar – SOG
Gradall
Noise due to Equipment
BIO
Concrete
QC/ Inspection – SOG
N/A
N/A
SBB (Lot 8) Concrete
Pour SOG 2 – L1S
Concrete Pump
Noise due to Equipment
SBB (Lot 8) Sitework
Chilled Water
Mini-excavator
Noise due to Equipment
SBB (Lot 8) Concrete
Edge Form
N/A
N/A
SBB (Lot 8) Concrete
Install Embeds
N/A
N/A
SBB (Lot 8) Concrete
MEP Sleeves & Inserts
N/A
N/A
SBB (Lot 8) Concrete
Rebar / PT Cables
Crane
Noise due to Equipment
SBB (Lot 8) Concrete
Electrical Rough-in
N/A
N/A
SBB (Lot 8) Concrete
Deck Depressions
N/A
N/A
Week of September 4, 2023
Construction Activities
Location
Activity
Equipment Used
Anticipated Disturbance
BIO
Concrete
Pour SOG
Concrete Pump
Noise due to Equipment
BIO
Backfill
Mini-Excavator
Noise due to Equipment
BIO
Erect Steel Roof Structure
N/A
N/A
SBB (Lot 8) Concrete
MEP Sleeves and Inserts – L2N
N/A
N/A
SBB (Lot 8) Concrete
Rebar / PT Cables – L2N
Crane
Noise due to Equipment
SBB (Lot 8) Concrete
Electrical Rough-in – L2N
N/A
N/A
SBB (Lot 8) Concrete
Deck Depressions – L2N
N/A
N/A
SBB (Lot 8) Concrete
Edge Form – L2S
N/A
N/A
SBB (Lot 8) Concrete
QC / Inspection – L2N
N/A
N/A
SBB (Lot 8) Concrete
Edge Form L2S
N/A
N/A
SBB (Lot 8) Concrete
Install Embeds – L2S
N/A
N/A
SBB (Lot 8) Concrete
MEP Sleeves and Inserts – L2S
N/A
N/A
SBB (Lot 8) Concrete
Rebar / PT Cables – L2S
Crane
Noise due to Equipment
Week of September 11, 2023
Construction Activities
Location
Activity
Equipment Used
Anticipated Disturbance
Bio
Install Metal Decking
NA
NA
SBB (Lot 8) Concrete
Pour – L2N
Concrete Pumps
Noise due to equipment
SBB (Lot 8) Concrete
Strip Edge Form – L2N
NA
NA
SBB (Lot 8) Concrete
Layout Walls and Columns – L2N
NA
NA
SBB (Lot 8) Concrete
Rebar – L2N
NA
NA
SBB (Lot 8) Concrete
Layout and Install MEPs – L2N
NA
NA
SBB (Lot 8) Concrete
Set Embeds – L2N
NA
NA
SBB (Lot 8) Concrete
Electrical Rough-in – L2S
NA
NA
SBB (Lot 8) Concrete
Deck Depressions – L2S
NA
NA
Current and Upcoming Anticipated Closures
The following shutdown(s)/ closures are anticipated as indicated below. Updates to this schedule will be released weekly in the Project Construction Advisories until the work is complete. Please contact John Franklin with any specific questions or concerns at john.franklin@ucr.edu.
Description
Location
Duration & Date
Impacted Buildings/ Facilities
Lot 8
Lot 8
Permanently
Lot 8
Lot 43
Lot 43
Indefinitely
Lot 43
Anderson Park
Anderson Park
Indefinitely
Anderson Park
-
950592 UCR SBB - Construction Alert #41
Current Weeks
Construction Activities
Location
Activity
Equipment Used
Anticipated Disturbance
BIO
Underslab Utilities
Install Underslab Plumbing Rough-in
N/A
N/A
BIO
Underslab Utilities
Install Underslab Electrical Rough-in
N/A
N/A
SBB (Lot 8)
Sitework
Chilled Water
Excavator
Noise due to Equipment
SBB (Lot 8) Concrete
Set Screeds – SOG North
N/A
N/A
SBB (Lot 8) Concrete
Q/C Inspection – SOG North
N/A
N/A
SBB (Lot 8) Concrete
Rebar – SOG North
Crane
Noise due to Equipment
SBB (Lot 8) Concrete
Pour – SOG North
Concrete Pumps and Trucks
Noise due to Equipment
SBB (Lot 8) Concrete
Edge Form / Bulkhead – SOG South
N/A
N/A
SBB (Lot 8) Concrete
Rebar – SOG South
Crane
Noise due to Equipment
SBB (Lot 8) Concrete
QC/ Inspection – SOG South
N/A
N/A
SBB (Lot 8) Concrete
Pour – SOG South
Concrete Pumps and Trucks
Noise due to Equipment
SBB (Lot 8) Concrete
Strip Edge Form / Bulkhead – SOG South
N/A
N/A
SBB (Lot 8) Concrete
Form Deck
N/A
N/A
SBB (Lot 8) Concrete
Edge Form
N/A
N/A
Week of August 28, 2023
Construction Activities
Location
Activity
Equipment Used
Anticipated Disturbance
BIO
Concrete
Fine Grade – SOG
N/A
N/A
BIO
Concrete
Vapor Barrier – SOG
N/A
N/A
BIO
Concrete
Rebar – SOG
Gradall
Noise due to Equipment
BIO
Concrete
QC/ Inspection – SOG
N/A
N/A
SBB (Lot 8) Concrete
Pour SOG 2 – L1S
Concrete Pump
Noise due to Equipment
SBB (Lot 8) Sitework
Chilled Water
Mini-excavator
Noise due to Equipment
SBB (Lot 8) Concrete
Edge Form
N/A
N/A
SBB (Lot 8) Concrete
Install Embeds
N/A
N/A
SBB (Lot 8) Concrete
MEP Sleeves & Inserts
N/A
N/A
SBB (Lot 8) Concrete
Rebar / PT Cables
Crane
Noise due to Equipment
SBB (Lot 8) Concrete
Electrical Rough-in
N/A
N/A
SBB (Lot 8) Concrete
Deck Depressions
N/A
N/A
Week of September 4, 2023
Construction Activities
Location
Activity
Equipment Used
Anticipated Disturbance
BIO
Concrete
Pour SOG
Concrete Pump
Noise due to Equipment
BIO
Erect Steel Roof Structure
N/A
N/A
SBB (Lot 8) Concrete
MEP Sleeves and Inserts – L2N
N/A
N/A
SBB (Lot 8) Concrete
Rebar / PT Cables – L2N
Crane
Noise due to Equipment
SBB (Lot 8) Concrete
Electrical Rough-in – L2N
N/A
N/A
SBB (Lot 8) Concrete
Deck Depressions – L2N
N/A
N/A
SBB (Lot 8) Concrete
Edge Form – L2S
N/A
N/A
Current and Upcoming Anticipated Closures
The following shutdown(s)/ closures are anticipated as indicated below. Updates to this schedule will be released weekly in the Project Construction Advisories until the work is complete. Please contact John Franklin with any specific questions or concerns at john.franklin@ucr.edu.
Description
Location
Duration & Date
Impacted Buildings/ Facilities
Lot 8
Lot 8
Permanently
Lot 8
Lot 43
Lot 43
Indefinitely
Lot 43
Anderson Park
Anderson Park
Indefinitely
Anderson Park
-
950592 UCR SBB - Construction Alert #40
Current Weeks
Construction Activities
Location
Activity
Equipment Used
Anticipated Disturbance
BIO
CMU Walls
Set Scaffold and Erect CMU Block Structure
Gradall
Noise due to Equipment
BIO
CMU Walls
Set Anchor Bolts
N/A
N/A
BIO
CMU Walls
Grout/Clean-Up/Remove Scaffold
N/A
N/A
SBB (Lot 8)
Concrete
Install Vapor Barrier – SOG North
N/A
N/A
SBB (Lot 8) Concrete
Install Electrical Rough-in – SOG North
N/A
N/A
SBB (Lot 8) Concrete
Rebar – SOG North
Crane
Noise due to Equipment
SBB (Lot 8)
Concrete
Underslab Plumbing Rough-In – SOG South
N/A
N/A
SBB (Lot 8)
Concrete
Underslab Electrical Rough-In – SOG South
N/A
N/A
SBB (Lot 8)
Concrete
Fine Grade – SOG South
N/A
N/A
SBB (Lot 8)
Concrete
Install Vapor Barrier – SOG South
N/A
N/A
Week of August 21, 2023
Construction Activities
Location
Activity
Equipment Used
Anticipated Disturbance
BIO
Underslab Utilities
Install Underslab Plumbing Rough-in
N/A
N/A
BIO
Underslab Utilities
Install Underslab Electrical Rough-in
N/A
N/A
SBB (Lot 8)
Sitework
Chilled Water
Excavator
Noise due to Equipment
SBB (Lot 8) Concrete
Set Screeds – SOG North
N/A
N/A
SBB (Lot 8) Concrete
Q/C Inspection – SOG North
N/A
N/A
SBB (Lot 8) Concrete
Rebar – SOG North
Crane
Noise due to Equipment
SBB (Lot 8) Concrete
Pour – SOG North
Concrete Pumps and Trucks
Noise due to Equipment
SBB (Lot 8) Concrete
Edge Form / Bulkhead – SOG South
N/A
N/A
SBB (Lot 8) Concrete
Rebar – SOG South
Crane
Noise due to Equipment
SBB (Lot 8) Concrete
QC/ Inspection – SOG South
N/A
N/A
SBB (Lot 8) Concrete
Pour – SOG South
Concrete Pumps and Trucks
Noise due to Equipment
SBB (Lot 8) Concrete
Strip Edge Form / Bulkhead – SOG South
N/A
N/A
SBB (Lot 8) Concrete
Form Deck
N/A
N/A
SBB (Lot 8) Concrete
Edge Form
N/A
N/A
Week of August 28, 2023
Construction Activities
Location
Activity
Equipment Used
Anticipated Disturbance
BIO
Concrete
Fine Grade – SOG
N/A
N/A
BIO
Concrete
Vapor Barrier – SOG
N/A
N/A
BIO
Concrete
Rebar – SOG
Gradall
Noise due to Equipment
BIO
Concrete
QC/ Inspection – SOG
N/A
N/A
SBB (Lot 8) Sitework
Chilled Water
Mini-excavator
Noise due to Equipment
SBB (Lot 8) Concrete
Edge Form
N/A
N/A
SBB (Lot 8) Concrete
Install Embeds
N/A
N/A
SBB (Lot 8) Concrete
MEP Sleeves & Inserts
N/A
N/A
SBB (Lot 8) Concrete
Rebar / PT Cables
Crane
Noise due to Equipment
SBB (Lot 8) Concrete
Electrical Rough-in
N/A
N/A
SBB (Lot 8) Concrete
Deck Depressions
N/A
N/A
Current and Upcoming Anticipated Closures
The following shutdown(s)/ closures are anticipated as indicated below. Updates to this schedule will be released weekly in the Project Construction Advisories until the work is complete. Please contact John Franklin with any specific questions or concerns at john.franklin@ucr.edu.
Description
Location
Duration & Date
Impacted Buildings/ Facilities
Lot 8
Lot 8
Permanently
Lot 8
Lot 43
Lot 43
Indefinitely
Lot 43
Anderson Park
Anderson Park
Indefinitely
Anderson Park
-
950592 UCR SBB - Construction Alert #39
Current Weeks
Construction Activities
Location
Activity
Equipment Used
Anticipated Disturbance
BIO
Underslab Utilities
Install Underslab Plumbing Rough-In
N/A
N/A
BIO
Underslab Utilities
Install Underslab Electrical Rough-In
N/A
N/A
SBB (Lot 8) Concrete
Install Vapor Barrier – SOG North
N/A
N/A
SBB (Lot 8) Concrete
Edge Form / Bulkhead – SOG North
N/A
N/A
SBB (Lot 8) Concrete
Rebar – SOG North
Crane
Noise due to Equipment
SBB (Lot 8) Concrete
Set Screeds – SOG North
N/A
N/A
SBB (Lot 8) Concrete
QC / Inspection – SOG North
N/A
N/A
SBB (Lot 8) Concrete
Pour – SOG North
Concrete Pumps and Trucks
Noise due to Equipment
SBB (Lot 8)
Concrete
Underslab Plumbing Rough-In – SOG South
N/A
N/A
SBB (Lot 8)
Concrete
Underslab Electrical Rough-In
N/A
N/A
SBB (Lot 8)
Concrete
Backfill Footings, Walls & Columns – SOG South
Dump Truck
Noise due to Equipment
Week of August 14, 2023
Construction Activities
Location
Activity
Equipment Used
Anticipated Disturbance
BIO
CMU Walls
Set Scaffold & Erect CMU Block Structure
Forklift
Noise due to Equipment
SBB (Lot 8)
Sitework
Chilled Water
Excavator
Noise due to Equipment
SBB (Lot 8) Concrete
Fine Grade – SOG South
Skid Steer
Noise due to Equipment
SBB (Lot 8) Concrete
Install Vapor Barrier – SOG South
N/A
N/A
SBB (Lot 8) Concrete
Deliver/ Shake Out Elevated Deck Form Work
Delivery Trucks
Noise due to Equipment
Week of August 21, 2023
Construction Activities
Location
Activity
Equipment Used
Anticipated Disturbance
BIO
CMU Walls
Set Anchor Bolts
N/A
N/A
BIO
CMU Walls
Grout / Clean-up / Remove Scaffold CMU Walls
N/A
N/A
SBB (Lot 8) Sitework
Chilled Water
Excavator
Noise due to Equipment
SBB (Lot 8) Concrete
Edge Form / Bulkhead – SOG South
Concrete Pumps and Trucks
Noise due to Equipment
SBB (Lot 8) Concrete
Rebar – SOG South
Crane
Noise due to Equipment
SBB (Lot 8) Concrete
QC/ Inspection – SOG South
N/A
N/A
SBB (Lot 8) Concrete
Pour – SOG South
Concrete Pumps and Trucks
Noise due to Equipment
SBB (Lot 8) Concrete
Strip Edge Form / Bulkhead – SOG South
N/A
N/A
SBB (Lot 8) Concrete
Form Deck
Crane
Noise Due to Equipment
SBB (Lot 8) Concrete
Edge Form
N/A
N/A
Current and Upcoming Anticipated Closures
The following shutdown(s)/ closures are anticipated as indicated below. Updates to this schedule will be released weekly in the Project Construction Advisories until the work is complete. Please contact John Franklin with any specific questions or concerns at john.franklin@ucr.edu.
Description
Location
Duration & Date
Impacted Buildings/ Facilities
Lot 8
Lot 8
Permanently
Lot 8
Lot 43
Lot 43
Indefinitely
Lot 43
Anderson Park
Anderson Park
Indefinitely
Anderson Park
-
950592 UCR SBB - Construction Alert #38
Current Weeks
Construction Activities
Location
Activity
Equipment Used
Anticipated Disturbance
BIO
Foundations
Excavate Foundations
Mini-Excavator and Skid Steer
Noise due to Equipment
BIO
Foundations
Rebar Foundations
N/A
N/A
BIO
Foundations
QC/ Inspection Foundations
N/A
N/A
BIO
Foundations
Pour Foundations
Concrete Pumps and Trucks
Noise due to Equipment
SBB (Lot 8) Concrete
Close Two Side Form – Core Wall – Pour 2
Crane
Noise due to Equipment
SBB (Lot 8) Concrete
Pour – Core Wall – Pour 2
Concrete Pumps and Trucks
Noise due to Equipment
SBB (Lot 8) Concrete
Strip Walls – Core Walls – Pour 2
Crane
Noise due to Equipment
SBB (Lot 8) Concrete
Shotcrete – Retaining Wall
Concrete Pumps and Trucks
Noise due to Equipment
SBB (Lot 8) Concrete
Removed Rebound – Retaining Wall
Crane
Noise due to Equipment
SBB (Lot 8) Concrete
Remove Scaffold
N/A
N/A
SBB (Lot 8) Concrete
Backfill Footings, Walls & Columns – SOG North
Dump Trucks
Noise due to Equipment
SBB (Lot 8) Concrete
Fine Grade – SOG North
Skid Steer
Noise due to Equipment
SBB (Lot 8) Concrete
Underslab Plumbing Rough-In – SOG South
N/A
N/A
SBB (Lot 8)
Concrete
Underslab Electrical Rough-In
N/A
N/A
Week of August 7, 2023
Construction Activities
Location
Activity
Equipment Used
Anticipated Disturbance
BIO
Underslab Utilities
Install Underslab Plumbing Rough-In
N/A
N/A
BIO
Underslab Utilities
Install Underslab Electrical Rough-In
N/A
N/A
SBB (Lot 8) Concrete
Install Vapor Barrier – SOG North
N/A
N/A
SBB (Lot 8) Concrete
Edge Form / Bulkhead – SOG North
N/A
N/A
SBB (Lot 8) Concrete
Rebar – SOG North
Crane
Noise due to Equipment
SBB (Lot 8) Concrete
Set Screeds – SOG North
N/A
N/A
SBB (Lot 8) Concrete
QC / Inspection – SOG North
N/A
N/A
SBB (Lot 8) Concrete
Pour – SOG North
Concrete Pumps and Trucks
Noise due to Equipment
SBB (Lot 8)
Concrete
Underslab Plumbing Rough-In – SOG South
N/A
N/A
SBB (Lot 8)
Concrete
Underslab Electrical Rough-In
N/A
N/A
SBB (Lot 8)
Concrete
Backfill Footings, Walls & Columns – SOG South
Dump Truck
Noise due to Equipment
Week of August 14, 2023
Construction Activities
Location
Activity
Equipment Used
Anticipated Disturbance
BIO
CMU Walls
Set Scaffold & Erect CMU Block Structure
N/A
N/A
SBB (Lot 8) Concrete
Fine Grade – SOG South
Skid Steer
Noise due to Equipment
SBB (Lot 8) Concrete
Install Vapor Barrier – SOG South
N/A
N/A
SBB (Lot 8) Concrete
Deliver/ Shake Out Elevated Deck Form Work
Delivery Trucks
Noise due to Equipment
Current and Upcoming Anticipated Closures
The following shutdown(s)/ closures are anticipated as indicated below. Updates to this schedule will be released weekly in the Project Construction Advisories until the work is complete. Please contact John Franklin with any specific questions or concerns at john.franklin@ucr.edu.
Description
Location
Duration & Date
Impacted Buildings/ Facilities
Lot 8
Lot 8
Indefinitely
Lot 8
Lot 43
Lot 43
Indefinitely
Lot 43
Anderson Park
Anderson Park
Indefinitely
Anderson Park
-
950592 UCR SBB - Construction Alert #37
Current Weeks
Construction Activities
Location
Activity
Equipment Used
Anticipated Disturbance
BIO
Sitework
Remove (E) Electrical
Mini-Excavator and Skid Steer
Noise due to Equipment
BIO
Sitework
Grade Site & Building Pad
Mini-Excavator and Skid Steer
Noise due to Equipment
BIO
Sitework
Building Pad Certification
N/A
N/A
SBB (Lot 8) Sitework
Pothole Chilled Water
Excavator
Noise due to Equipment
SBB (Lot 8) Concrete
Rebar – Core Walls – Pour 2
Crane
Noise due to Equipment
SBB (Lot 8) Concrete
One Side Form Walls – Core Wall – Pour 2
Crane
Noise due to Equipment
SBB (Lot 8) Concrete
Layout & Install MEP’s – Core Walls – Pour 2
N/A
N/A
SBB (Lot 8) Concrete
QC/ Inspection – Core Walls – Pour 2
N/A
N/A
SBB (Lot 8) Concrete
Set Embeds – Core Wall – Pour 2
N/A
N/A
SBB (Lot 8) Concrete
Close Two Side Forms – Shear Walls & Columns – Pour 3
Crane
Noise due to Equipment
SBB (Lot 8) Concrete
Pour – Shear Walls & Columns – Pour 3
Concrete Pumps and Trucks
Noise due to Equipment
SBB (Lot 8) Concrete
Strip Walls – Shear Walls & Columns – Pour 3
Crane
Noise due to Equipment
SBB (Lot 8)
Concrete
Set Scaffold – Retaining Wall
N/A
N/A
SBB (Lot 8)
Concrete
Underslab Electrical Stub-Up
N/A
N/A
Week of July 31, 2023
Construction Activities
Location
Activity
Equipment Used
Anticipated Disturbance
BIO
Foundation
Layout Foundation
N/A
N/A
BIO
Foundation
Excavate Foundations
Excavator
Noise due to Equipment
BIO
Foundation
Rebar Foundations
N/A
N/A
BIO Foundations
QC/ Inspection Foundations
N/A
N/A
BIO Foundations
Pour Foundations
Concrete Pumps and Trucks
Noise due to Equipment
SBB (Lot 8) Sitework
Install Chilled Water
Excavator
Noise due to Equipment
SBB (Lot 8) Concrete
Pour – Core Walls – Pour 2
Concrete Pumps and Trucks
Noise due to Equipment
SBB (Lot 8) Concrete
Strip Walls – Core Walls – Pour 2
Crane
Noise due to Equipment
SBB (Lot 8) Concrete
Shotcrete Wires – Retaining Wall
N/A
N/A
SBB (Lot 8) Concrete
Shotcrete – Retaining Wall
Concrete Pump and Trucks
Noise due to Equipment
SBB (Lot 8) Concrete
Remove Rebound – Retaining Wall
Crane
Noise due to Equipment
SBB (Lot 8) Concrete
Remove Scaffold – Retaining Wall
N/A
N/A
SBB (Lot 8)
Concrete
Backfill Footings, Walls, & Columns – SOG North
Dump Trucks
Noise due to Equipment
SBB (Lot 8)
Concrete
Fine Grade – SOG North
Skid Steer
Noise due to Equipment
SBB (Lot 8)
Concrete
Underslab Plumbing Rough-in – SOG South
N/A
N/A
SBB (Lot 8)
Concrete
Backfill Footings, Walls, & Columns – SOG South
Dump Trucks
Noise due to Equipment
Week of August 07, 2023
Construction Activities
Location
Activity
Equipment Used
Anticipated Disturbance
BIO
Underslab Utilities
Install Underslab Utilities Plumbing Rough-In
N/A
N/A
BIO
Underslab Utilities
Install Underslab Utilities Electrical Rough-In
N/A
N/A
SBB (Lot 8) Sitework
Install Chilled Water
Excavator
Noise due to Equipment
SBB (Lot 8) Concrete
Install Vapor Barrier – SOG North
N/A
N/A
SBB (Lot 8) Concrete
Edge Form / Bulkhead – SOG North
N/A
N/A
SBB (Lot 8) Concrete
Rebar - SOG North
Crane
Noise due to Equipment
SBB (Lot 8) Concrete
Set Screeds – SOG North
N/A
N/A
SBB (Lot 8) Concrete
QC/ Inspection – SOG North
N/A
N/A
SBB (Lot 8) Concrete
Pour – SOG North
Concrete pumps and Trucks
Noise due to Equipment
SBB (Lot 8)
Concrete
Underslab Plumbing Rough-In
N/A
N/A
SBB (Lot 8)
Concrete
Underslab Electrical Rough-In – SOG South
N/A
N/A
Current and Upcoming Anticipated Closures
The following shutdown(s)/ closures are anticipated as indicated below. Updates to this schedule will be released weekly in the Project Construction Advisories until the work is complete. Please contact John Franklin with any specific questions or concerns at john.franklin@ucr.edu.
Description
Location
Duration & Date
Impacted Buildings/ Facilities
Lot 8
Lot 8
Indefinitely
Lot 8
Lot 43
Lot 43
Indefinitely
Lot 43
College Pl
College Pl
7/10 – 7/28
The College Pl loop is a one-way (single lane) road that branches off S Campus Dr. The Southern College Pl Road contains two traffic control operators helping direct traffic both to and from Parking Lot 3. The Northern College Pl Road has been closed.
Anderson Park
Anderson Park
Indefinitely
Anderson Park
-
950592 UCR SBB - Construction Alert #36
Current Weeks
Construction Activities
Location
Activity
Equipment Used
Anticipated Disturbance
BIO
Sitework
Relocate (E) Steam Line
Mini-Excavator and Skid Steer
Noise due to Equipment
BIO
Sitework
Test & Backfill Steam Line
Skid Steer
Noise due to Equipment
BIO
Sitework
Remove (E) Electrical Line
N/A
N/A
SBB (Lot 8) Sitework
Install Sewer
Excavator
Noise due to Equipment
Partial Lane Closure of South Campus Drive
SBB (Lot 8) Sitework
Install Chilled Water
Excavator
Noise due to Equipment
SBB (Lot 8) Sitework
Strip – Column Pour 1
Crane
Noise due to Equipment
SBB (Lot 8) Sitework
Waterblast – Column Pour 1
Concrete Pressure Washer
Noise due to Equipment
SBB (Lot 8) Sitework
Strip Walls – Shear Walls & Columns – Pour 2
Crane
Noise due to Equipment
SBB (Lot 8) Sitework
Rebar – Shear Walls & Columns – Pour 3
N/A
N/A
SBB (Lot 8) Sitework
Layout & Install MEP’s – Shear Walls & Columns – Pour 3
N/A
N/A
SBB (Lot 8) Sitework
Set Embeds – Shear Walls & Columns – Pour 3
N/A
N/A
SBB (Lot 8) Sitework
QC / Inspection – Shear Walls & Columns – Pour 3
N/A
N/A
SBB (Lot 8) Sitework
Close Two Side Forms – Shear Walls & Columns – Pour 3
Crane
Noise due to Equipment
SBB (Lot 8) Concrete
Shotcrete – Retaining Wall
Concrete Pumps and Trucks
Noise due to equipment
SBB (Lot 8) Concrete
Remove Rebound – Retaining Wall
Skid Steer
Noise due to Equipment
SBB (Lot 8) Concrete
Remove Scaffolding – Retaining Wall North
N/A
N/A
SBB (Lot 8) Concrete
Backfill – Retaining Wall
Trucks and Excavator
Noise due to Equipment
SBB (Lot 8) Sitework
MEP Layout & Block outs – Retaining Wall
N/A
N/A
SBB (Lot 8) Sitework
Rebar – Retaining Wall
N/A
N/A
SBB (Lot 8)
Sitework
Set Scaffolding – Retaining Wall South
N/A
N/A
SBB (Lot 8)
Concrete
Backfill Footings, Walls & Columns – SOG North
Excavator
Noise due to Equipment
SBB (Lot 8)
Bio-Retention Planter
Backfill Bio-Retention Planter for Steam Lines
Excavator
Noise due to Equipment
Week of July 24, 2023
Construction Activities
Location
Activity
Equipment Used
Anticipated Disturbance
BIO
Sitework
Remove (E) Electrical
Mini-Excavator and Skid Steer
Noise due to Equipment
BIO
Sitework
Grade Site & Building Pad
N/A
N/A
BIO
Sitework
Building Pad Certification
N/A
N/A
SBB (Lot 8) Sitework
Install Chilled Water
Excavator
Noise due to Equipment
SBB (Lot 8) Concrete
Pour – Shear Walls & Columns – Pour 3
Concrete pumps and Trucks
Noise due to Equipment
SBB (Lot 8) Concrete
Strip Walls – Shear Walls & Columns – Pour 3
Crane
Noise due to Equipment
SBB (Lot 8) Concrete
Shotcrete – Wires
Concrete pumps and Trucks
Noise due to Equipment
SBB (Lot 8) Concrete
Shotcrete -Retaining Wall
Shotcrete Pump
Noise due to Equipment
SBB (Lot 8) Concrete
Remove Rebound – Retaining Wall
Skid Steer
Noise due to Equipment
SBB (Lot 8) Concrete
Remove Scaffolding – Retaining Wall
N/A
N/A
SBB (Lot 8) Concrete
Fine Grade – SOG North
N/A
N/A
SBB (Lot 8)
Concrete
Install Vapor Barrier – SOG North
N/A
N/A
SBB (Lot 8)
Concrete
Edge Form / Bulkhead – SOG North
N/A
N/A
SBB (Lot 8) Concrete
Rebar – SOG North
N/A
N/A
SBB (Lot 8)
Concrete
Underslab Plumbing Rough-in – SOG South
N/A
N/A
SBB (Lot 8)
Concrete
Underslab Electrical Rough-in – SOG South
N/A
N/A
Week of July 31, 2023
Construction Activities
Location
Activity
Equipment Used
Anticipated Disturbance
BIO
Foundations
Layout Foundations
N/A
N/A
BIO
Foundations
Excavate Foundations
Excavator
Noise due to Equipment
BIO
Foundations
Rebar Foundations
N/A
N/A
BIO
Foundations
QC/Inspection Foundations
N/A
N/A
BIO
Foundations
Pour Foundations
Concrete pumps and Trucks
Noise due to Equipment
SBB (Lot 8) Sitework
Install Chilled Water
Excavator
Noise due to Equipment
SBB (Lot 8) Concrete
Backfill - Retaining Wall
Dump Truck(s)
Noise due to Equipment
SBB (Lot 8) Concrete
Edge Form / Bulkhead – SOG North
N/A
N/A
SBB (Lot 8) Concrete
Rebar – SOG North
N/A
N/A
SBB (Lot 8) Concrete
Set Screeds – SOG North
N/A
N/A
SBB (Lot 8) Concrete
QC/ Inspection – SOG North
N/A
N/A
SBB (Lot 8) Concrete
Pour – SOG North
Concrete pumps and Trucks
Noise due to Equipment
SBB (Lot 8)
Concrete
Underslab Plumbing Rough-In – SOG South
N/A
N/A
SBB (Lot 8)
Concrete
Underslab Electrical Rough-In – SOG South
N/A
N/A
SBB (Lot 8) Concrete
Fine Grade – SOG South
skip loader
Noise due to Equipment
Current and Upcoming Anticipated Closures
The following shutdown(s)/ closures are anticipated as indicated below. Updates to this schedule will be released weekly in the Project Construction Advisories until the work is complete. Please contact John Franklin with any specific questions or concerns at john.franklin@ucr.edu.
Description
Location
Duration & Date
Impacted Buildings/ Facilities
Lot 8
Lot 8
Indefinitely
Lot 8
Lot 43
Lot 43
Indefinitely
Lot 43
College Pl
College Pl
7/10 – 7/28
The College Pl loop is a one-way (single lane) road that branches off S Campus Dr. The Southern College Pl Road contains two traffic control operators helping direct traffic both to and from Parking Lot 3. The Northern College Pl Road has been closed.
-
950592 UCR SBB - Construction Alert #35
Current Weeks
Construction Activities
Location
Activity
Equipment Used
Anticipated Disturbance
BIO
Sitework
Relocate (E) Steam Line
Mini-Excavator and Skid Steer
Noise due to Equipment
SBB (Lot 8) Sitework
Install Sewer
Excavator
Noise due to Equipment
Partial Lane Closure of South Campus Drive
SBB (Lot 8) Sitework
Install Chilled Water
Excavator
Noise due to Equipment
SBB (Lot 8) Sitework
Close Two Side Forms – Shear Walls & Columns – Pour 2
Crane
Noise due to Equipment
SBB (Lot 8) Concrete
Pour – Shear Walls & Columns – Pour 2
Concrete Pumps and Trucks
Noise due to Equipment
SBB (Lot 8) Concrete
Strip Walls – Shear Walls & Columns – Pour 2
Crane
Noise due to Equipment
SBB (Lot 8) Sitework
One Side Form Walls – Shear Walls & Columns – Pour 3
Crane
Noise due to Equipment
SBB (Lot 8)
Concrete
Electrical Rough-in – Column Pour 1
N/A
N/A
SBB (Lot 8) Concrete
Set Embeds – Column Pour 1
N/A
N/A
SBB (Lot 8) Concrete
QC/Inspection – Column Pour 1
N/A
N/A
SBB (Lot 8) Concrete
Form Columns – Columns – Column Pour 1
Crane
Noise due to Equipment
SBB (Lot 8) Sitework
Pour – Column Pour 1
Concrete Pumps and Trucks
Noise due to Equipment
SBB (Lot 8) Sitework
Set – Scaffolding – Retaining Wall North
N/A
N/A
SBB (Lot 8) Sitework
Shotcrete Wires – Retaining Wall
N/A
N/A
SBB (Lot 8) Sitework
Back Form – Retaining Wall
Excavator
Noise due to Equipment
SBB (Lot 8) Sitework
Waterproofing – Retaining Wall – at Mat Pour 2
N/A
N/A
SBB (Lot 8)
Concrete
Underslab Electrical Stub-up – SOG North
N/A
N/A
SBB (Lot 8)
Bio-Retention Planter
Excavate Bio-retention planter for steam lines
Excavator
Noise due to Equipment
Week of July 17, 2023
Construction Activities
Location
Activity
Equipment Used
Anticipated Disturbance
BIO
Sitework
Relocate (E) Steam Line
Mini-Excavator and Skid Steer
Noise due to Equipment
BIO
Sitework
Test & Backfill Steam Line
Skid Steer
Noise due to Equipment
BIO
Sitework
Remove (E) Electrical Line
N/A
N/A
SBB (Lot 8) Sitework
Install Sewer
Excavator
Noise due to Equipment
Partial Lane Closure of South Campus Drive
SBB (Lot 8) Sitework
Install Chilled Water
Excavator
Noise due to Equipment
SBB (Lot 8) Sitework
Strip – Column Pour 1
Crane
Noise due to Equipment
SBB (Lot 8) Sitework
Waterblast – Column Pour 1
Concrete Pressure Washer
Noise due to Equipment
SBB (Lot 8) Sitework
Strip Walls – Shear Walls & Columns – Pour 2
Crane
Noise due to Equipment
SBB (Lot 8) Sitework
Rebar – Shear Walls & Columns – Pour 3
N/A
N/A
SBB (Lot 8) Sitework
Layout & Install MEP’s – Shear Walls & Columns – Pour 3
N/A
N/A
SBB (Lot 8) Sitework
Set Embeds – Shear Walls & Columns – Pour 3
N/A
N/A
SBB (Lot 8) Sitework
QC / Inspection – Shear Walls & Columns – Pour 3
N/A
N/A
SBB (Lot 8) Sitework
Close Two Side Forms – Shear Walls & Columns – Pour 3
Crane
Noise due to Equipment
SBB (Lot 8) Concrete
Shotcrete – Retaining Wall
Concrete Pumps and Trucks
Noise due to equipment
SBB (Lot 8) Concrete
Remove Rebound – Retaining Wall
Skid Steer
Noise due to Equipment
SBB (Lot 8) Concrete
Remove Scaffolding – Retaining Wall North
N/A
N/A
SBB (Lot 8) Concrete
Backfill – Retaining Wall
Trucks and Excavator
Noise due to Equipment
SBB (Lot 8) Sitework
MEP Layout & Block outs – Retaining Wall
N/A
N/A
SBB (Lot 8) Sitework
Rebar – Retaining Wall
N/A
N/A
SBB (Lot 8)
Sitework
Set Scaffolding – Retaining Wall South
N/A
N/A
SBB (Lot 8)
Concrete
Backfill Footings, Walls & Columns – SOG North
Excavator
Noise due to Equipment
SBB (Lot 8)
Bio-Retention Planter
Backfill Bio-Retention Planter for Steam Lines
Excavator
Noise due to Equipment
Week of July 24, 2023
Construction Activities
Location
Activity
Equipment Used
Anticipated Disturbance
SBB (Lot 8) Sitework
Install Sewer
Excavator
Noise due to Equipment
Partial Lane Closure of South Campus Drive
SBB (Lot 8) Sitework
Install Chilled Water
Excavator
Noise due to Equipment
SBB (Lot 8) Concrete
Pour – Shear Walls & Columns – Pour 3
Concrete pumps and Trucks
Noise due to Equipment
SBB (Lot 8) Concrete
Strip Walls – Shear Walls & Columns – Pour 3
Crane
Noise due to Equipment
SBB (Lot 8) Concrete
Shotcrete – Wires
Concrete pumps and Trucks
Noise due to Equipment
SBB (Lot 8) Concrete
Shotcrete -Retaining Wall
Shotcrete Pump
Noise due to Equipment
SBB (Lot 8) Concrete
Remove Rebound – Retaining Wall
Skid Steer
Noise due to Equipment
SBB (Lot 8) Concrete
Remove Scaffolding – Retaining Wall
N/A
N/A
SBB (Lot 8) Concrete
Fine Grade – SOG North
N/A
N/A
SBB (Lot 8)
Concrete
Install Vapor Barrier – SOG North
N/A
N/A
SBB (Lot 8)
Concrete
Edge Form / Bulkhead – SOG North
N/A
N/A
SBB (Lot 8) Concrete
Rebar – SOG North
N/A
N/A
SBB (Lot 8)
Concrete
Underslab Plumbing Rough-in – SOG South
N/A
N/A
SBB (Lot 8)
Concrete
Underslab Electrical Rough-in – SOG South
N/A
N/A
Current and Upcoming Anticipated Closures
The following shutdown(s)/ closures are anticipated as indicated below. Updates to this schedule will be released weekly in the Project Construction Advisories until the work is complete. Please contact John Franklin with any specific questions or concerns at john.franklin@ucr.edu.
Description
Location
Duration & Date
Impacted Buildings/ Facilities
Lot 8
Lot 8
Permanently
Lot 8
Lot 43
Lot 43
Indefinitely
Lot 43
Anderson Park
Anderson Park
Indefinitely
Anderson Park
-
950592 UCR SBB - Construction Alert #34
Current Weeks
Construction Activities
Location
Activity
Equipment Used
Anticipated Disturbance
SBB (Lot 8) Sitework
Install Sewer
Excavator
Noise due to Equipment
Partial Lane Closure of South Campus Drive
SBB (Lot 8) Sitework
Install Chilled Water
Excavator
Noise due to Equipment
SBB (Lot 8) Concrete
Pour Mat Footing 2
Concrete Pumps and Trucks
Noise due to Equipment
SBB (Lot 8) Concrete
Pour – Shear Walls & Columns – Pour 1
Concrete Pumps and Trucks
Noise due to Equipment
SBB (Lot 8)
Concrete
Strip Walls – Shear Walls & Columns – Pour 1
N/A
N/A
SBB (Lot 8) Concrete
Rebar – Shear Walls & Columns – Pour 2
Crane
Noise due to Equipment
SBB (Lot 8) Concrete
Layout and Install MEP’s – Shear Walls & Columns – Pour 2
N/A
N/A
SBB (Lot 8) Concrete
Set Embeds – Shear Walls & Columns – Pour 2
N/A
N/A
SBB (Lot 8)
Concrete
QC Inspection Shear Walls & Columns – Pour 2
N/A
N/A
SBB (Lot 8)
Concrete
Close Two-Side Forms – Shear Walls & Columns – Pour 2
N/A
N/A
SBB (Lot 8)
Concrete
Set Rebar Column Cages – Column Pour 1
Crane
Noise due to Equipment
SBB (Lot 8)
Concrete
Electrical Rough-In – Column Pour 1
N/A
N/A
SBB (Lot 8)
Concrete
Form Columns – Column Pour 1
N/A
N/A
SBB (Lot 8)
Concrete
Waterproofing – Retaining Wall – at Mat Pour 2
Boom Lift
Noise due to Equipment
SBB (Lot 8)
Concrete
Back Form – Retaining Wall
N/A
N/A
SBB (Lot 8) Concrete
MEP Layouts & Blockouts – Retaining Wall
N/A
N/A
SBB (Lot 8) Bio-Retention Planter
Excavate Bio-retention planter for steam lines
Excavator
Noise due to Equipment
Week of July 10, 2023
Construction Activities
Location
Activity
Equipment Used
Anticipated Disturbance
SBB (Lot 8) Sitework
Install Sewer
Excavator
Noise due to Equipment
Partial Lane Closure of South Campus Drive
SBB (Lot 8) Sitework
Install Chilled Water
Excavator
Noise due to Equipment
SBB (Lot 8) Concrete
Pour – Shear Walls & Columns – Pour 2
Concrete Pumps and Trucks
Noise due to equipment
SBB (Lot 8) Concrete
Strip Walls – Shear Walls & Columns – Pour 2
N/A
N/A
SBB (Lot 8) Concrete
Strip – Columns Pour 1
N/A
N/A
SBB (Lot 8) Concrete
Waterblast – Column Pour 1
Concrete Pressure Washer
Noise due to equipment
SBB (Lot 8) Concrete
Set Scaffolding – Retaining Wall
N/A
N/A
SBB (Lot 8) Concrete
Shotcrete Wires – Retaining Wall
N/A
N/A
SBB (Lot 8) Concrete
Backfill Footings, Walls & Columns – SOG North
N/A
N/A
SBB (Lot 8) Concrete
Install Storm Drain at Auditorium
Excavator
Noise due to Equipment
SBB (Lot 8) Concrete
Underslab Electrical Stub-up – SOG North
N/A
N/A
SBB (Lot 8) Concrete
Backfill Footing, Walls, & Columns – SOG South
Excavator
Noise due to Equipment
SBB (Lot 8) Bio-Retention Planter
Excavate Bio-retention planter for steam lines
Excavator
Noise due to Equipment
Week of July 17, 2023
Construction Activities
Location
Activity
Equipment Used
Anticipated Disturbance
SBB (Lot 8) Sitework
Install Sewer
Excavator
Noise due to Equipment
Partial Lane Closure of South Campus Drive
SBB (Lot 8) Sitework
Install Chilled Water
Excavator
Noise due to Equipment
SBB (Lot 8) Concrete
Shotcrete – Retaining Wall
Concrete pumps and Trucks
Noise due to equipment
SBB (Lot 8) Concrete
Remove Rebound – Retaining Wall
N/A
N/A
SBB (Lot 8) Concrete
Remove Scaffold – Retaining Wall
N/A
N/A
SBB (Lot 8) Concrete
Backfill – Retaining Wall
Trucks
Noise due to equipment
SBB (Lot 8) Bio-Retention Planter
Excavate Bio-retention planter for steam lines
Excavator
Noise due to Equipment
Current and Upcoming Anticipated Closures
The following shutdown(s)/ closures are anticipated as indicated below. Updates to this schedule will be released weekly in the Project Construction Advisories until the work is complete. Please contact John Franklin with any specific questions or concerns at john.franklin@ucr.edu.
Description
Location
Duration & Date
Impacted Buildings/ Facilities
Lot 8
Lot 8
Permanently
Lot 8
Lot 43
Lot 43
Indefinitely
Lot 43
Anderson Park
Anderson Park
Indefinitely
Anderson Park
-
950592 UCR SBB - Construction Alert #33
Current Weeks
Construction Activities
Location
Activity
Equipment Used
Anticipated Disturbance
SBB (Lot 8) Sitework
Install Sewer
N/A
N/A
SBB (Lot 8) Sitework
Install Chilled Water
N/A
N/A
SBB (Lot 8) Concrete
QC Inspection Mat Footing 2
N/A
N/A
SBB (Lot 8) Concrete
Strip and Waterblast Mat Footing 2
N/A
N/A
SBB (Lot 8)
Concrete
Wall & Column Templates and Dowels – Spread Footings
N/A
N/A
SBB (Lot 8) Concrete
QC Inspection at Spread Footings
N/A
N/A
SBB (Lot 8) Concrete
Pour Spread Continuous Footings
Concrete Pumps and Trucks
Noise due to equipment
SBB (Lot 8) Concrete
Strip Wall and Column Templates – Spread Footings
N/A
N/A
SBB (Lot 8)
Concrete
Waterblast Dowels – Spread Footings
N/A
N/A
SBB (Lot 8)
Concrete
Rebar Shear Walls and Columns – For Pour 1
N/A
N/A
SBB (Lot 8)
Concrete
Electrical Rough-in – Shear Walls and Columns – For Pour 1
N/A
N/A
SBB (Lot 8)
Concrete
Set Embeds – Shear Walls and Columns – For Pour 1
N/A
N/A
SBB (Lot 8)
Concrete
QC Inspection Shear Walls and Columns – For Pour 1
N/A
N/A
SBB (Lot 8)
Concrete
Close up Wall Forms – Shear Walls and Columns – For Pour 1
N/A
N/A
SBB (Lot 8)
Concrete
Layout Walls – Shear Walls and Columns – For Pour 2
N/A
N/A
SBB (Lot 8) Concrete
Waterproofing – Retaining Wall at Mat Pour 1
N/A
N/A
Week of July 3, 2023
Construction Activities
Location
Activity
Equipment Used
Anticipated Disturbance
SBB (Lot 8) Sitework
Install Sewer
N/A
N/A
SBB (Lot 8) Sitework
Install Chilled Water
N/A
N/A
SBB (Lot 8) Concrete
Pour Mat Footing 2
Concrete Pumps and Trucks
Noise due to equipment
SBB (Lot 8) Concrete
Pour – Shear Walls & Columns – Pour 1
Concrete Pumps and Trucks
Noise due to equipment
SBB (Lot 8) Concrete
Strip Walls – Shear Walls & Columns – Pour 1
N/A
N/A
SBB (Lot 8) Concrete
Rebar – Shear Walls & Columns – Pour 2
N/A
N/A
SBB (Lot 8) Concrete
Layout and Install MEP’s – Shear Walls & Columns – Pour 2
N/A
N/A
SBB (Lot 8) Concrete
Set Embeds – Shear Walls & Columns – Pour 2
N/A
N/A
SBB (Lot 8) Concrete
QC Inspection Shear Walls & Columns – Pour 2
Concrete Pumps and Trucks
Noise due to equipment
SBB (Lot 8) Concrete
Close Two-Side Forms – Shear Walls & Columns – Pour 2
N/A
N/A
SBB (Lot 8) Concrete
Set Rebar Column Cages – Column Pour 1
N/A
N/A
SBB (Lot 8) Concrete
Electrical Rough-in – Column Pour 1
N/A
N/A
SBB (Lot 8) Concrete
Form Columns – Column Pour 1
N/A
N/A
SBB (Lot 8) Concrete
Waterproofing – Retaining Wall – at Mat Pour 2
N/A
N/A
SBB (Lot 8) Concrete
Back Form – Retaining Wall
N/A
N/A
SBB (Lot 8) Concrete
MEP Layouts & Blockouts – Retaining Wall
N/A
N/A
Week of July 10, 2023
Construction Activities
Location
Activity
Equipment Used
Anticipated Disturbance
SBB (Lot 8) Sitework
Install Sewer
N/A
N/A
SBB (Lot 8) Sitework
Install Chilled Water
N/A
N/A
SBB (Lot 8) Concrete
Pour – Shear Walls & Columns – Pour 2
Concrete Pumps and Trucks
Noise due to equipment
SBB (Lot 8) Concrete
Strip Walls - Shear Walls & Columns – Pour 2
N/A
N/A
SBB (Lot 8) Concrete
Strip – Column Pour 1
N/A
N/A
SBB (Lot 8) Concrete
Waterblast – Column Pour 1
N/A
N/A
SBB (Lot 8) Concrete
Set Scaffolding – Retaining Wall
N/A
N/A
SBB (Lot 8) Concrete
Shotcrete Wires – Retaining Wall
N/A
N/A
SBB (Lot 8) Concrete
Backfill Footing, Walls & Columns – SOG North
N/A
N/A
SBB (Lot 8) Concrete
Install Storm Drain at Auditorium
N/A
N/A
SBB (Lot 8) Concrete
Underslab Electrical Stub-up – SOG North
N/A
N/A
SBB (Lot 8) Concrete
Backfill Footing, Walls, & Columns – SOG South
N/A
N/A
Current and Upcoming Anticipated Closures
The following shutdown(s)/ closures are anticipated as indicated below. Updates to this schedule will be released weekly in the Project Construction Advisories until the work is complete. Please contact John Franklin with any specific questions or concerns at john.franklin@ucr.edu.
Description
Location
Duration & Date
Impacted Buildings/ Facilities
Lot 8
Lot 8
Permanently
Lot 8
Lot 43
Lot 43
Indefinitely
Lot 43
Anderson Park
Anderson Park
Indefinitely
Anderson Park
-
950592 UCR SBB - Construction Alert #32
Current Weeks
Construction Activities
Location
Activity
Equipment Used
Anticipated Disturbance
Genomics
Fire Alarm Testing (MEP testing and startup)
N/A
N/A
SBB (Lot 8) Sitework
Install Sewer
N/A
N/A
SBB (Lot 8) Sitework
Install Chilled Water
N/A
N/A
SBB (Lot 8) Concrete
Qc Inspection Mat Footing 1
N/A
N/A
SBB (Lot 8) Concrete
Pour Mat Footing 1
Concrete Pumps and Trucks
Noise due to equipment
SBB (Lot 8) Concrete
Strip and Waterblast Mat Footing 1
N/A
N/A
SBB (Lot 8) Concrete
Install Storm Drain at Auditorium
N/A
N/A
SBB (Lot 8) Concrete
Rebar Mat Footing 2
N/A
N/A
SBB (Lot 8) Concrete
Wall & Column Templates and Dowels Mat Footing 2
N/A
N/A
SBB (Lot 8) Concrete
Excavate Spread Footings
N/A
N/A
Week of June 26, 2023
Construction Activities
Location
Activity
Equipment Used
Anticipated Disturbance
SBB (Lot 8) Sitework
Install Sewer
N/A
N/A
SBB (Lot 8) Sitework
Install Chilled Water
N/A
N/A
SBB (Lot 8) Concrete
QC inspection at Mat Footing 2
N/A
N/A
SBB (Lot 8) Concrete
Pour Mat Footing 2
Concrete Pumps and Trucks
Noise due to equipment
SBB (Lot 8) Concrete
Strip and Waterblast Mat Footing 2
N/A
N/A
SBB (Lot 8) Concrete
Wall & Column Templates and Dowels - Spread Footings
N/A
N/A
SBB (Lot 8) Concrete
QC inspection at Spread Footings
N/A
N/A
SBB (Lot 8) Concrete
Pour Spread Continuous Footings
Concrete Pumps and Trucks
Noise due to equipment
SBB (Lot 8) Concrete
Strip Wall and Column Templates – Spread Footings
N/A
N/A
SBB (Lot 8) Concrete
Waterblast Dowels – Spread Footings
N/A
N/A
SBB (Lot 8) Concrete
Rebar Shear Walls and Columns - For Pour 1
N/A
N/A
SBB (Lot 8) Concrete
Electrical Rough-in - Shear Walls and Columns - For Pour 1
N/A
N/A
SBB (Lot 8) Concrete
Set Embeds - Shear Walls and Columns – For Pour 1
N/A
N/A
SBB (Lot 8) Concrete
QC inspection Shear Walls and Columns – For Pour 1
N/A
N/A
SBB (Lot 8) Concrete
Close Up Wall Forms – Shear Walls and Columns – For Pour 1
N/A
N/A
SBB (Lot 8) Concrete
Layout Walls – Shear Walls and Columns – For Pour 2
N/A
N/A
SBB (Lot 8) Shotcrete Retaining Wall
Waterproofing – retaining Wall – at Mat Pour 1
N/A
N/A
Week of July 3, 2023
Construction Activities
Location
Activity
Equipment Used
Anticipated Disturbance
SBB (Lot 8) Sitework
Install Sewer
N/A
N/A
SBB (Lot 8) Sitework
Install Chilled Water
N/A
N/A
SBB (Lot 8) Concrete
Pour - Shear Walls & Columns – Pour 1
Concrete Pumps and Trucks
Noise due to equipment
SBB (Lot 8) Concrete
Strip Walls - Shear Walls & Columns – Pour 1
N/A
N/A
SBB (Lot 8) Concrete
Rebar - Shear Walls & Columns – Pour 2
N/A
N/A
SBB (Lot 8) Concrete
Layout and install MEPs - Shear Walls & Columns – Pour 2
N/A
N/A
SBB (Lot 8) Concrete
Set Embeds - Shear Walls & Columns – Pour 2
N/A
N/A
SBB (Lot 8) Concrete
QC Inspection Shear Walls & Columns – Pour 2
N/A
N/A
SBB (Lot 8) Concrete
Close Two Side Forms - Shear Walls & Columns – Pour 2
N/A
N/A