School of Business New Building

The new School of Business building complex will be a flagship facility, serving as the permanent home for the School. The building will complement the School of Business’ existing space program and fully address enrollment-driven needs in pursuit of their aspiration to become the premier center of management research and education in the Inland Empire.


Project Scope:

The proposed building will provide about 38,500 ASF within approximately to 63,400 GSF, along with exterior circulation and gathering areas. The program includes the following spaces:

  • Classrooms and Educational Spaces
  • Student Support Spaces
  • Academic Offices and Support Spaces
  • Administrative Offices and Support Spaces
  • Shared Building Resources (Lobby, Multipurpose room(s) etc)

School of Business Project Updates

  • 950592 UCR SBB - Construction Alert #93

    Week of August 19, 2024

    Construction Activities 

     

    Location

    Activity

    Equipment Used

    Anticipated Disturbance

    SBB (Lot 8)

    Install Signage – INT-L1

    NA

    NA

    SBB (Lot 8)

    Install Signage – INT-L2

    NA

    NA

    SBB (Lot 8)

    Install Signage – INT-L3

    NA

    NA

    SBB (Lot 8)

    Install Signage – INT-L4

    NA

    NA

    SBB (Lot 8)

    Set Plumbing Finishes – INT-L4

    NA

    NA

    Anderson Park

    Install Exterior Signage – SITE-AP

    NA

    NA

    SBB (Lot 8)

    F/R/P Stairs – SITE-N

    Heavy Equipment

    Noise

    SBB (Lot 8)

    F/R/P Hardscape – SITE-N

    Heavy Equipment

    Noise

    SBB (Lot 8)

    Base and Pave – SITE-N

    Heavy Equipment

    Noise

    SBB (Lot 8)

    F/R/P Stairs – SITE-E

    Heavy Equipment

    Noise

    SBB (Lot 8)

    F/R/P Hardscape – SIET-E

    Heavy Equipment

    Noise

    SBB (Lot 8)

    Insall Irrigation – SITE-E

    NA

    NA

    SBB (Lot 8)

    Insall Landscaping – SITE-E

    NA

    NA

    SBB (Lot 8)

    Install Site Furnishing – SITE-E

    NA

    NA

    SBB (Lot 8)

    Insall Handrail / Guardrail – SITE-E

    NA

    NA

    SBB (Lot 8)

    Install Exterior Signage – SITE-E

    NA

    NA

    SBB (Lot 8)

    Install Exterior Signage – SITE-S

    NA

    NA

    SBB (Lot 8)

    Install Irrigation – SITE-W

    NA

    NA

    SBB (Lot 8)

    Install Handrail / Guardrail – SITE-W

    NA

    NA

    SBB (Lot 8)

    Install Site Furnishings – SITE-W

    NA

    NA

    SBB (Lot 8)

    Install Exterior Signage – SITE-W

    NA

    NA

    SBB (Lot 8)

    Base and Pave – SITE-W

    Heavy Equipment

    Noise

     

    Week of August 26, 2024

    Construction Activities

     

    Location

    Activity

    Equipment Used

    Anticipated Disturbance

    SBB (Lot 8)

    Install Signage – INT-L1

    NA

    NA

    SBB (Lot 8)

    Install Signage – INT-L2

    NA

    NA

    SBB (Lot 8)

    Install Signage – INT-L3

    NA

    NA

    SBB (Lot 8)

    Install Signage – INT-L4

    NA

    NA

    SBB (Lot 8)

    Set Plumbing Finishes – INT-L4

    NA

    NA

    Anderson Park

    Install Exterior Signage – SITE-AP

    NA

    NA

    SBB (Lot 8)

    F/R/P Stairs – SITE-N

    Heavy Equipment

    Noise

    SBB (Lot 8)

    F/R/P Hardscape – SITE-N

    Heavy Equipment

    Noise

    SBB (Lot 8)

    Base and Pave – SITE-N

    Heavy Equipment

    Noise

    SBB (Lot 8)

    F/R/P Stairs – SITE-E

    Heavy Equipment

    Noise

    SBB (Lot 8)

    F/R/P Hardscape – SIET-E

    Heavy Equipment

    Noise

    SBB (Lot 8)

    Insall Irrigation – SITE-E

    NA

    NA

    SBB (Lot 8)

    Insall Landscaping – SITE-E

    NA

    NA

    SBB (Lot 8)

    Install Site Furnishing – SITE-E

    NA

    NA

    SBB (Lot 8)

    Insall Handrail / Guardrail – SITE-E

    NA

    NA

    SBB (Lot 8)

    Install Exterior Signage – SITE-E

    NA

    NA

    SBB (Lot 8)

    Install Exterior Signage – SITE-S

    NA

    NA

    SBB (Lot 8)

    Install Irrigation – SITE-W

    NA

    NA

    SBB (Lot 8)

    Install Handrail / Guardrail – SITE-W

    NA

    NA

    SBB (Lot 8)

    Install Site Furnishings – SITE-W

    NA

    NA

    SBB (Lot 8)

    Install Exterior Signage – SITE-W

    NA

    NA

    SBB (Lot 8)

    Base and Pave – SITE-W

    Heavy Equipment

    Noise

     

    Week of September 2, 2024

    Construction Activities

     

    Location

    Activity

    Equipment Used

    Anticipated Disturbance

    SBB (Lot 8)

    Trend CHW/HHW System Performance

    NA

    NA

    SBB (Lot 8)

    Trend HVAC System Performance

    NA

    NA

    SBB (Lot 8)

    Install Landscape (West Site)

    NA

    NA

    SBB (Lot 8)

    Install Landscape (East Site)

    NA

    NA

    SBB (Lot 8)

    Install Landscape (North Site)

    NA

    NA

    SBB (Lot 8)

    Install Irrigation (North Site)

    NA

    NA

     

    Current and Upcoming Anticipated Closures

    The following shutdown(s)/ closures are anticipated as indicated below. Updates to this schedule will be released weekly in the Project Construction Advisories until the work is complete.  Please contact John Franklin with any specific questions or concerns at john.franklin@ucr.edu.

     

    Description

    Location

    Duration & Date

    Impacted Buildings/ Facilities

    Lot 8

    Lot 8

    Permanently  

    Lot 8

    Lot 43

    Lot 43

    Indefinitely  

    Lot 43

    South Campus Drive

    South Campus Drive

    6/17 – 8/30

    South Campus Drive Road Closure 

    Anderson Park

    Anderson Park

    Indefinitely

    Anderson Park

  • 950592 UCR SBB - Construction Alert #92

    Week of August 12, 2024

    Construction Activities 

     

    Location

    Activity

    Equipment Used

    Anticipated Disturbance

    SBB (Lot 8)

    Install Handrail / Guardrail – INT-L2

    NA

    NA

    SBB (Lot 8)

    Fine Grade – SITE-N

    Heavy Equipment

    Noise

    SBB (Lot 8)

    Backfill Planters – SITE-N

    NA

    NA

    SBB (Lot 8)

    F/R/P Stairs – SITE-N

    Heavy Equipment

    Noise

    SBB (Lot 8)

    F/R/P Hardscape – SITE-N

    Heavy Equipment

    Noise

    SBB (Lot 8)

    Install Irrigation – SITE-E

    NA

    NA

    SBB (Lot 8)

    Install Landscaping – SITE-E

    NA

    NA

    SBB (Lot 8)

    Install Site Furnishings – SITE-E

    NA

    NA

    SBB (Lot 8)

    Install Handrail / Guardrail – SITE-E

    NA

    NA

    SBB (Lot 8)

    Install Exterior Signage – SITE-E

    NA

    NA

    SBB (Lot 8)

    Install Site Furnishings – SITE-S

    NA

    NA

    SBB (Lot 8)

    Install Exterior Signage – SITE-S

    NA

    NA

    SBB (Lot 8)

    Install Irrigation – SITE-S

    NA

    NA

    SBB (Lot 8)

    Base & Pave – SITE-S

    Heavy Equipment

    Noise

    SBB (Lot 8)

    Install Landscaping – SITE-S

    NA

    NA

    SBB (Lot 8)

    Install Handrail / Guardrail – SITE-W

    NA

    NA

     

    Week of August 19, 2024

    Construction Activities

     

    Location

    Activity

    Equipment Used

    Anticipated Disturbance

    SBB (Lot 8)

    Install Signage – INT-L1

    NA

    NA

    SBB (Lot 8)

    Install Signage – INT-L2

    NA

    NA

    SBB (Lot 8)

    Install Signage – INT-L3

    NA

    NA

    SBB (Lot 8)

    Install Signage – INT-L4

    NA

    NA

    SBB (Lot 8)

    Set Plumbing Finishes – INT-L4

    NA

    NA

    Anderson Park

    Install Exterior Signage – SITE-AP

    NA

    NA

    SBB (Lot 8)

    F/R/P Stairs – SITE-N

    Heavy Equipment

    Noise

    SBB (Lot 8)

    F/R/P Hardscape – SITE-N

    Heavy Equipment

    Noise

    SBB (Lot 8)

    Base and Pave – SITE-N

    Heavy Equipment

    Noise

    SBB (Lot 8)

    F/R/P Stairs – SITE-E

    Heavy Equipment

    Noise

    SBB (Lot 8)

    F/R/P Hardscape – SIET-E

    Heavy Equipment

    Noise

    SBB (Lot 8)

    Insall Irrigation – SITE-E

    NA

    NA

    SBB (Lot 8)

    Insall Landscaping – SITE-E

    NA

    NA

    SBB (Lot 8)

    Install Site Furnishing – SITE-E

    NA

    NA

    SBB (Lot 8)

    Insall Handrail / Guardrail – SITE-E

    NA

    NA

    SBB (Lot 8)

    Install Exterior Signage – SITE-E

    NA

    NA

    SBB (Lot 8)

    Install Exterior Signage – SITE-S

    NA

    NA

    SBB (Lot 8)

    Install Irrigation – SITE-W

    NA

    NA

    SBB (Lot 8)

    Install Handrail / Guardrail – SITE-W

    NA

    NA

    SBB (Lot 8)

    Install Site Furnishings – SITE-W

    NA

    NA

    SBB (Lot 8)

    Install Exterior Signage – SITE-W

    NA

    NA

    SBB (Lot 8)

    Base and Pave – SITE-W

    Heavy Equipment

    Noise

     

    Week of August 26, 2024

    Construction Activities

     

    Location

    Activity

    Equipment Used

    Anticipated Disturbance

    SBB (Lot 8)

    Donor Wall Signage – INT-L2

    NA

    NA

    SBB (Lot 8)

    Install Handrail – SITE-N

    NA

    NA

    SBB (Lot 8)

    Base and Pave – SITE-N

    Heavy Equipment

    Noise

    SBB (Lot 8)

    F/R/P Stairs – SITE-N

    Heavy Equipment

    Noise

    SBB (Lot 8)

    F/R/P Hardscape – SITE-N

    Heavy Equipment

    Noise

    SBB (Lot 8)

    Install Exterior Signage – SITE-N

    NA

    NA

    SBB (Lot 8)

    F/R/P Stairs – SITE-E

    Heavy Equipment

    Noise

    SBB (Lot 8)

    F/R/P Hardscape – SITE-E

    Heavy Equipment

    Noise

    SBB (Lot 8)

    Install Irrigation – SITE-E

    NA

    NA

    SBB (Lot 8)

    Install Site Furnishings – SITE-E

    NA

    NA

    SBB (Lot 8)

    Install Handrail / Guardrail – SITE-E

    NA

    NA

    SBB (Lot 8)

    Install Exterior Signage – SITE-E

    NA

    NA

    SBB (Lot 8)

    Install Irrigation – SITE-W

    NA

    NA

    SBB (Lot 8)

    Install Handrail / Guardrail – SITE-W

    NA

    NA

    SBB (Lot 8)

    Install Site Furnishings – SITE-W

    NA

    NA

    SBB (Lot 8)

    Install Exterior Signage – SITE-W

    NA

    NA

    SBB (Lot 8)

    Base and Pave – SITE-W

    Heavy Equipment

    Noise

    SBB (Lot 8)

    Grind and Overlay Remaining Asphalt Paving / Final Cap Paving – SITE-CD

    Heavy Equipment

    Noise

    SBB (Lot 8)

    Install Landscape – SITE-W

    NA

    NA

    SBB (Lot 8)

    Install Landscape – SITE-E

    Heavy Equipment

    Noise

    SBB (Lot 8)

    Install Landscape – SITE-N

    Heavy Equipment

    Noise

    SBB (Lot 8)

    Install Irrigation – SITE-N

    Heavy Equipment

    Noise

     

    Current and Upcoming Anticipated Closures

    The following shutdown(s)/ closures are anticipated as indicated below. Updates to this schedule will be released weekly in the Project Construction Advisories until the work is complete.  Please contact John Franklin with any specific questions or concerns at john.franklin@ucr.edu.

     

    Description

    Location

    Duration & Date

    Impacted Buildings/ Facilities

    Lot 8

    Lot 8

    Permanently  

    Lot 8

    Lot 43

    Lot 43

    Indefinitely  

    Lot 43

    South Campus Drive

    South Campus Drive

    6/17 – 8/30

    South Campus Drive Road Closure 

    Anderson Park

    Anderson Park

    Indefinitely

    Anderson Park

  • 950592 UCR SBB - Construction Alert #91

    Please note: Due to logistical reasons and ongoing construction, South Campus Drive will remain closed until Friday, 8/30
    We sincerely apologize for the extended delays and any inconvenience this may have caused.
     

    Week of August 5, 2024

    Construction Activities 

     

    Location

    Activity

    Equipment Used

    Anticipated Disturbance

    SBB (Lot 8) 

    Install Signage – INT-L1

    NA

    NA

    SBB (Lot 8)

    Final Clean / Punchlist – INT-L1

    NA

    NA

    SBB (Lot 8)

    Wood Cladding / Bench – INT-L2

    NA

    NA

    SBB (Lot 8) 

    Donor Wall Signage – INT-L2

    NA

    NA

    SBB (Lot 8)

    Install Signage – INT-L2

    NA

    NA

    SBB (Lot 8)

    Install Polished Concrete – INT-L2

    NA

    NA

    SBB (Lot 8)

    Final Clean / Punchlist – INT-L2

    NA

    NA

    SBB (Lot 8)

    Install Signage – INT-L3

    NA

    NA

    SBB (Lot 8)

    Final Clean / Punchlist – INT-L3

    NA

    NA

    SBB (Lot 8) 

    Final Coat of Paint – RR-L4

    NA

    NA

    SBB (Lot 8)

    Install Signage – INT-L4

    NA

    NA

    SBB (Lot 8)

    Set Plumbing Finishes – INT-L4

    NA

    NA

    SBB (Lot 8)

    Final Clean / Punchlist – INT-L4

    NA

    NA

    SBB (Lot 8)

    Install Exterior Signage – SITE-AP

    NA

    NA

    SBB (Lot 8) 

    Install Landscaping – SITE-AP

    NA

    NA

    SBB (Lot 8)

    Install Irrigation Mains & Sleeves – SITE-N

    NA

    NA

    SBB (Lot 8) 

    Install Site Lighting Underground – SITE-N

    NA

    NA

    SBB (Lot 8)

    F/R/P Curb & Gutter – SITE-N

    Heavy Equipment

    Noise

    SBB (Lot 8)

    Fine Grade – SITE-E

    Heavy Equipment

    Noise

    SBB (Lot 8)

    F/R/P Stairs – SITE-E

    Heavy Equipment

    Heavy Equipment

    SBB (Lot 8)

    F/R/P Hardscape – SITE-E

    Heavy Equipment

    Heavy Equipment

    SBB (Lot 8)

    Install Site Furnishings – SITE-W

    NA

    NA

    SBB (Lot 8)

    Install Exterior Signage – SITE-W

    NA

    NA

    SBB (Lot 8)

    Install Irrigation – SITE-W

    NA 

    NA

    SBB (Lot 8)

    Base & Pave – SITE-W

    Heavy Equipment 

    Noise

    SBB (Lot 8)

    Install Landscaping – SITE-W

    NA 

    NA

     

    Week of August 12, 2024

    Construction Activities

     

    Location

    Activity

    Equipment Used

    Anticipated Disturbance

    SBB (Lot 8)

    Final Clean / Punch – INT-AUD

    NA

    NA

    SBB (Lot 8)

    Install Handrail / Guardrail – INT-L2

    NA

    NA

    SBB (Lot 8)

    Fine Grade – SITE-N

    Heavy Equipment

    Noise

    SBB (Lot 8)

    Backfill Planters – SITE-N

    NA

    NA

    SBB (Lot 8)

    F/R/P Stairs – SITE-N

    Heavy Equipment

    Noise

    SBB (Lot 8)

    F/R/P Hardscape – SITE-N

    Heavy Equipment

    Noise

    SBB (Lot 8)

    Install Irrigation – SITE-E

    NA

    NA

    SBB (Lot 8)

    Install Landscaping – SITE-E

    NA

    NA

    SBB (Lot 8)

    Install Site Furnishings – SITE-E

    NA

    NA

    SBB (Lot 8)

    Install Handrail / Guardrail – SITE-E

    NA

    NA

    SBB (Lot 8)

    Install Exterior Signage – SITE-E

    NA

    NA

    SBB (Lot 8)

    Install Site Furnishings – SITE-S

    NA

    NA

    SBB (Lot 8)

    Install Exterior Signage – SITE-S

    NA

    NA

    SBB (Lot 8)

    Install Irrigation – SITE-S

    NA

    NA

    SBB (Lot 8)

    Base & Pave – SITE-S

    Heavy Equipment

    Noise

    SBB (Lot 8)

    Install Landscaping – SITE-S

    NA

    NA

    SBB (Lot 8)

    Install Handrail / Guardrail – SITE-W

    NA

    NA

     

    Week of August 19, 2024

    Construction Activities

     

    Location

    Activity

    Equipment Used

    Anticipated Disturbance

    SBB (Lot 8)

    Install Signage – INT-L1

    NA

    NA

    SBB (Lot 8)

    Install Signage – INT-L2

    NA

    NA

    SBB (Lot 8)

    Install Signage – INT-L3

    NA

    NA

    SBB (Lot 8)

    Install Signage – INT-L4

    NA

    NA

    SBB (Lot 8)

    Set Plumbing Finishes – INT-L4

    NA

    NA

    Anderson Park

    Install Exterior Signage – SITE-AP

    NA

    NA

    SBB (Lot 8)

    F/R/P Stairs – SITE-N

    Heavy Equipment

    Noise

    SBB (Lot 8)

    F/R/P Hardscape – SITE-N

    Heavy Equipment

    Noise

    SBB (Lot 8)

    Base and Pave – SITE-N

    Heavy Equipment

    Noise

    SBB (Lot 8)

    F/R/P Stairs – SITE-E

    Heavy Equipment

    Noise

    SBB (Lot 8)

    F/R/P Hardscape – SIET-E

    Heavy Equipment

    Noise

    SBB (Lot 8)

    Insall Irrigation – SITE-E

    NA

    NA

    SBB (Lot 8)

    Insall Landscaping – SITE-E

    NA

    NA

    SBB (Lot 8)

    Install Site Furnishing – SITE-E

    NA

    NA

    SBB (Lot 8)

    Insall Handrail / Guardrail – SITE-E

    NA

    NA

    SBB (Lot 8)

    Install Exterior Signage – SITE-E

    NA

    NA

    SBB (Lot 8)

    Install Exterior Signage – SITE-S

    NA

    NA

    SBB (Lot 8)

    Install Irrigation – SITE-W

    NA

    NA

    SBB (Lot 8)

    Install Handrail / Guardrail – SITE-W

    NA

    NA

    SBB (Lot 8)

    Install Site Furnishings – SITE-W

    NA

    NA

    SBB (Lot 8)

    Install Exterior Signage – SITE-W

    NA

    NA

    SBB (Lot 8)

    Base and Pave – SITE-W

    Heavy Equipment

    Noise

     

    Current and Upcoming Anticipated Closures

    The following shutdown(s)/ closures are anticipated as indicated below. Updates to this schedule will be released weekly in the Project Construction Advisories until the work is complete.  Please contact John Franklin with any specific questions or concerns at john.franklin@ucr.edu.

     

    Description

    Location

    Duration & Date

    Impacted Buildings/ Facilities

    Lot 8

    Lot 8

    Permanently  

    Lot 8

    Lot 43

    Lot 43

    Indefinitely  

    Lot 43

    South Campus Drive

    South Campus Drive

    6/17 – 8/19

    South Campus Drive Road Closure 

    Anderson Park

    Anderson Park

    Indefinitely

    Anderson Park

  • 950592 UCR SBB - Construction Alert #90

    Week of July 29, 2024

    Construction Activities

     

    LocationActivityEquipment UsedAnticipated Disturbance

    SBB (Lot 8)

    Final Coat of Paint – RR-L1

    NA

    NA

    SBB (Lot 8)

    Install Roll Up Door – FR08-185

    NA

    NA

    SBB (Lot 8)

    Install Window Shades – INT-L1

    NA

    NA

    SBB (Lot 8)

    Install FF&E – INT-L1

    NA

    NA

    SBB (Lot 8)

    Install Polished Concrete – INT-L1

    NA

    NA

    SBB (Lot 8)

    Install Fixed Seating – INT-AUD

    NA

    NA

    SBB (Lot 8)

    Remove Dancefloor – INT-L2

    NA

    NA

    SBB (Lot 8)

    Install Window Shades – INT-L2

    NA

    NA

    SBB (Lot 8)

    Final Coat of Paint – RR-L3

    NA

    NA

    SBB (Lot 8)

    Install Window Shades – INT-L3

    NA

    NA

    SBB (Lot 8)

    Set Plumbing Finishes – INT-L3

    NA

    NA

    SBB (Lot 8)

    Install Electrical Finishes – RR-L4

    NA

    NA

    SBB (Lot 8)

    Install Window Shades – INT-L4

    NA

    NA

    Anderson Park

    Install Site Furnishings – SITE-AP

    NA

    NA

    Anderson Park

    Install Irrigation – SITE-AP

    NA

    NA

    Anderson Park 

    Install Handrail/Guardrail – SITE-AP

    NA

    NA

    SBB (Lot 8)

    Backfill / Rough Grade / Cut Curbs – SITE-N

    Heavy Equipment

    Noise

    SBB (Lot 8)

    F/R/P Curbs – SITE-E

    Heavy Equipment

    Noise

    SBB (Lot 8)

    Fine Grade – SITE-S

    Heavy Equipment

    Noise

    SBB (Lot 8)

    Backfill & LID Planter Install – SITE-S

    Heavy Equipment

    Noise

    SBB (Lot 8)

    F/R/P Hardscape – SITE-S

    Heavy Equipment

    Noise

    SBB (Lot 8)

    F/R/P Stairs – SITE-W

    Heavy Equipment

    Noise

    Campus Drive

    Base & Pave – SITE-CD

    Heavy Equipment

    Noise

     

    Week of August 5, 2024

    Construction Activities

     

    LocationActivityEquipment UsedAnticipated Disturbance

    SBB (Lot 8) 

    Install Signage – INT-L1

    NA

    NA

    SBB (Lot 8)

    Final Clean / Punchlist – INT-L1

    NA

    NA

    SBB (Lot 8)

    Wood Cladding / Bench – INT-L2

    NA

    NA

    SBB (Lot 8) 

    Donor Wall Signage – INT-L2

    NA

    NA

    SBB (Lot 8)

    Install Signage – INT-L2

    NA

    NA

    SBB (Lot 8)

    Install Polished Concrete – INT-L2

    NA

    NA

    SBB (Lot 8)

    Final Clean / Punchlist – INT-L2

    NA

    NA

    SBB (Lot 8)

    Install Signage – INT-L3

    NA

    NA

    SBB (Lot 8)

    Final Clean / Punchlist – INT-L3

    NA

    NA

    SBB (Lot 8) 

    Final Coat of Paint – RR-L4

    NA

    NA

    SBB (Lot 8)

    Install Signage – INT-L4

    NA

    NA

    SBB (Lot 8)

    Set Plumbing Finishes – INT-L4

    NA

    NA

    SBB (Lot 8)

    Final Clean / Punchlist – INT-L4

    NA

    NA

    SBB (Lot 8)

    Install Exterior Signage – SITE-AP

    NA

    NA

    SBB (Lot 8) 

    Install Landscaping – SITE-AP

    NA

    NA

    SBB (Lot 8)

    Install Irrigation Mains & Sleeves – SITE-N

    NA

    NA

    SBB (Lot 8) 

    Install Site Lighting Underground – SITE-N

    NA

    NA

    SBB (Lot 8)

    F/R/P Curb & Gutter – SITE-N

    Heavy Equipment

    Noise

    SBB (Lot 8)

    Fine Grade – SITE-E

    Heavy Equipment

    Noise

    SBB (Lot 8)

    F/R/P Stairs – SITE-E

    Heavy Equipment

    Heavy Equipment

    SBB (Lot 8)

    F/R/P Hardscape – SITE-E

    Heavy Equipment

    Heavy Equipment

    SBB (Lot 8)

    Install Site Furnishings – SITE-W

    NA

    NA

    SBB (Lot 8)

    Install Exterior Signage – SITE-W

    NA

    NA

    SBB (Lot 8)

    Install Irrigation – SITE-W

    NA 

    NA

    SBB (Lot 8)

    Base & Pave – SITE-W

    Heavy Equipment 

    Noise

    SBB (Lot 8)

    Install Landscaping – SITE-W

    NA 

    NA

     

    Week of August 12, 2024

    Construction Activities

     

    LocationActivityEquipment UsedAnticipated Disturbance

    SBB (Lot 8)

    Final Clean / Punch – INT-AUD

    NA

    NA

    SBB (Lot 8)

    Install Handrail / Guardrail – INT-L2

    NA

    NA

    SBB (Lot 8)

    Fine Grade – SITE-N

    Heavy Equipment

    Noise

    SBB (Lot 8)

    Backfill Planters – SITE-N

    NA

    NA

    SBB (Lot 8)

    F/R/P Stairs – SITE-N

    Heavy Equipment

    Noise

    SBB (Lot 8)

    F/R/P Hardscape – SITE-N

    Heavy Equipment

    Noise

    SBB (Lot 8)

    Install Irrigation – SITE-E

    NA

    NA

    SBB (Lot 8)

    Install Landscaping – SITE-E

    NA

    NA

    SBB (Lot 8)

    Install Site Furnishings – SITE-E

    NA

    NA

    SBB (Lot 8)

    Install Handrail / Guardrail – SITE-E

    NA

    NA

    SBB (Lot 8)

    Install Exterior Signage – SITE-E

    NA

    NA

    SBB (Lot 8)

    Install Site Furnishings – SITE-S

    NA

    NA

    SBB (Lot 8)

    Install Exterior Signage – SITE-S

    NA

    NA

    SBB (Lot 8)

    Install Irrigation – SITE-S

    NA

    NA

    SBB (Lot 8)

    Base & Pave – SITE-S

    Heavy Equipment

    Noise

    SBB (Lot 8)

    Install Landscaping – SITE-S

    NA

    NA

    SBB (Lot 8)

    Install Handrail / Guardrail – SITE-W

    NA

    NA

     

    Current and Upcoming Anticipated Closures

    The following shutdown(s)/ closures are anticipated as indicated below. Updates to this schedule will be released weekly in the Project Construction Advisories until the work is complete.  Please contact John Franklin with any specific questions or concerns at john.franklin@ucr.edu.

     

    Description

    Location

    Duration & Date

    Impacted Buildings/ Facilities

    Lot 8

    Lot 8

    Permanently  

    Lot 8

    Lot 43

    Lot 43

    Indefinitely  

    Lot 43

    South Campus Drive

    South Campus Drive

    6/17 – 8/12

    South Campus Drive Road Closure 

    Anderson Park

    Anderson Park

    Indefinitely

    Anderson Park

  • 950592 UCR SBB - Construction Alert #89

    Week of July 22, 2024

    Construction Activities

     

    Location

    Activity

    Equipment Used

    Anticipated Disturbance

    SBB (Lot 8)

    Install Electrical Finishes – RR-L1

    NA

    NA

    SBB (Lot 8)

    Install Casework / Millwork – INT-L1

    NA

    NA

    SBB (Lot 8)

    MEPF Devices at Wood Ceilings – INT-L1

    NA

    NA

    SBB (Lot 8)

    Install Interior Glazing Glass – INT-L1

    NA

    NA

    SBB (Lot 8)

    Install Wood Ceilings – INT-L1

    NA

    NA

    SBB (Lot 8)

    Install FEC's – INT-L1

    NA

    NA

    SBB (Lot 8)

    Install Operable Partition Walls – INT-L1

    NA

    NA

    SBB (Lot 8)

    Install Wall Protection – INT-L1

    NA

    NA

    SBB (Lot 8)

    Install Marker Boards – INT-L1

    NA

    NA

    SBB (Lot 8)

    Install AV Devices – INT-L1

    NA

    NA

    SBB (Lot 8)

    Install Telecom Devices – INT-L1

    NA

    NA

    SBB (Lot 8)

    Install Electrical Cover Plates – INT-L1

    NA

    NA

    SBB (Lot 8)

    Install Security Devices – INT-L1

    NA

    NA

    SBB (Lot 8)

    Install Carpet & Base – INT-L1

    NA

    NA

    SBB (Lot 8)

    Install Security Devices – INT-AUD

    NA

    NA

    SBB (Lot 8)

    Install Polished Concrete – INT-AUD

    NA

    NA

    SBB (Lot 8)

    Install Marker Boards – INT-AUD

    NA

    NA

    SBB (Lot 8)

    Install Telecom Devices – INT-AUD

    NA

    NA

    SBB (Lot 8)

    Install Electrical Cover Plates – INT-AUD

    NA

    NA

    SBB (Lot 8)

    Final Coat of Paint – RR-L2

    NA

    NA

    SBB (Lot 8)

    MEPF Devices at Wood Ceiling – INT-L2

    NA

    NA

    SBB (Lot 8)

    Install Wood Ceilings – INT-L2

    NA

    NA

    SBB (Lot 8)

    Install Casework / Millwork – INT-L2

    NA

    NA

    SBB (Lot 8)

    Set Plumbing Finishes – INT-L2

    NA

    NA

    SBB (Lot 8)

    Install Electrical Finishes – RR-L3

    NA

    NA

    SBB (Lot 8)

    Install Casework / Millwork – INT-L3

    NA

    NA

    SBB (Lot 8)

    Toilet Partitions and Accessories – RR-L4

    NA

    NA

    SBB (Lot 8)

    Install Casework / Millwork – INT-L4

    NA

    NA

    SBB (Lot 8)

    Install Marker Boards – INT-L4

    NA

    NA

    SBB (Lot 8)

    Install AV Devices – INT-L4

    NA

    NA

    SBB (Lot 8)

    Install FF&E – INT-L4

    NA

    NA

    SBB (Lot 8)

    Remove Protection & Install Finishes – ELEV-295

    NA

    NA

    Anderson Park

    F/R/P Remaining Hardscape Along Campus Drive – SITE-AP

    Heavy Equipment

    Noise

    SBB (Lot 8)

    Backfill / Rough Grade / Cut Curbs – SITE-E

    Heavy Equipment

    Noise

    SBB (Lot 8)

    Install Irrigation Mains & Sleeves – SITE-E

    NA

    NA

    SBB (Lot 8)

    Install Site Lighting Underground – SITE-E

    NA

    NA

    SBB (Lot 8)

    F/R/P Curb & Gutter – SITE-S

    Heavy Equipment

    Noise

    SBB (Lot 8)

    F/R/P Curb & Gutter – SITE-W

    Heavy Equipment

    Noise

    SBB (Lot 8)

    Fine Grade – SITE-W

    Heavy Equipment

    Noise

    SBB (Lot 8)

    Backfill Planters – SITE-W

    Heavy Equipment

    Noise

    SBB (Lot 8)

    F/R/P Hardscape – SITE-W

    Heavy Equipment

    Noise

    Campus Drive

    Fine Grade for Asphalt – SITE-CD

    Heavy Equipment

    Noise

     

    Week of July 29, 2024

    Construction Activities

     

    Location

    Activity

    Equipment Used

    Anticipated Disturbance

    SBB (Lot 8)

    Final Coat of Paint – RR-L1

    NA

    NA

    SBB (Lot 8)

    Install Roll Up Door – FR08-185

    NA

    NA

    SBB (Lot 8)

    Install Window Shades – INT-L1

    NA

    NA

    SBB (Lot 8)

    Install FF&E – INT-L1

    NA

    NA

    SBB (Lot 8)

    Install Polished Concrete – INT-L1

    NA

    NA

    SBB (Lot 8)

    Install Fixed Seating – INT-AUD

    NA

    NA

    SBB (Lot 8)

    Remove Dancefloor – INT-L2

    NA

    NA

    SBB (Lot 8)

    Install Window Shades – INT-L2

    NA

    NA

    SBB (Lot 8)

    Final Coat of Paint – RR-L3

    NA

    NA

    SBB (Lot 8)

    Install Window Shades – INT-L3

    NA

    NA

    SBB (Lot 8)

    Set Plumbing Finishes – INT-L3

    NA

    NA

    SBB (Lot 8)

    Install Electrical Finishes – RR-L4

    NA

    NA

    SBB (Lot 8)

    Install Window Shades – INT-L4

    NA

    NA

    Anderson Park

    Install Site Furnishings – SITE-AP

    NA

    NA

    Anderson Park

    Install Irrigation – SITE-AP

    NA

    NA

    Anderson Park 

    Install Handrail/Guardrail – SITE-AP

    NA

    NA

    SBB (Lot 8)

    Backfill / Rough Grade / Cut Curbs – SITE-N

    Heavy Equipment

    Noise

    SBB (Lot 8)

    F/R/P Curbs – SITE-E

    Heavy Equipment

    Noise

    SBB (Lot 8)

    Fine Grade – SITE-S

    Heavy Equipment

    Noise

    SBB (Lot 8)

    Backfill & LID Planter Install – SITE-S

    Heavy Equipment

    Noise

    SBB (Lot 8)

    F/R/P Hardscape – SITE-S

    Heavy Equipment

    Noise

    SBB (Lot 8)

    F/R/P Stairs – SITE-W

    Heavy Equipment

    Noise

    Campus Drive

    Base & Pave – SITE-CD

    Heavy Equipment

    Noise

     

    Week of August 5, 2024

    Construction Activities

     

    Location

    Activity

    Equipment Used

    Anticipated Disturbance

    SBB (Lot 8) 

    Install Signage – INT-L1

    NA

    NA

    SBB (Lot 8)

    Final Clean / Punchlist – INT-L1

    NA

    NA

    SBB (Lot 8)

    Wood Cladding / Bench – INT-L2

    NA

    NA

    SBB (Lot 8) 

    Donor Wall Signage – INT-L2

    NA

    NA

    SBB (Lot 8)

    Install Signage – INT-L2

    NA

    NA

    SBB (Lot 8)

    Install Polished Concrete – INT-L2

    NA

    NA

    SBB (Lot 8)

    Final Clean / Punchlist – INT-L2

    NA

    NA

    SBB (Lot 8)

    Install Signage – INT-L3

    NA

    NA

    SBB (Lot 8)

    Final Clean / Punchlist – INT-L3

    NA

    NA

    SBB (Lot 8) 

    Final Coat of Paint – RR-L4

    NA

    NA

    SBB (Lot 8)

    Install Signage – INT-L4

    NA

    NA

    SBB (Lot 8)

    Set Plumbing Finishes – INT-L4

    NA

    NA

    SBB (Lot 8)

    Final Clean / Punchlist – INT-L4

    NA

    NA

    SBB (Lot 8)

    Install Exterior Signage – SITE-AP

    NA

    NA

    SBB (Lot 8) 

    Install Landscaping – SITE-AP

    NA

    NA

    SBB (Lot 8)

    Install Irrigation Mains & Sleeves – SITE-N

    NA

    NA

    SBB (Lot 8) 

    Install Site Lighting Underground – SITE-N

    NA

    NA

    SBB (Lot 8)

    F/R/P Curb & Gutter – SITE-N

    Heavy Equipment

    Noise

    SBB (Lot 8)

    Fine Grade – SITE-E

    Heavy Equipment

    Noise

    SBB (Lot 8)

    F/R/P Stairs – SITE-E

    Heavy Equipment

    Heavy Equipment

    SBB (Lot 8)

    F/R/P Hardscape – SITE-E

    Heavy Equipment

    Heavy Equipment

    SBB (Lot 8)

    Install Site Furnishings – SITE-W

    NA

    NA

    SBB (Lot 8)

    Install Exterior Signage – SITE-W

    NA

    NA

    SBB (Lot 8)

    Install Irrigation – SITE-W

    NA 

    NA

    SBB (Lot 8)

    Base & Pave – SITE-W

    Heavy Equipment 

    Noise

    SBB (Lot 8)

    Install Landscaping – SITE-W

    NA 

    NA

     

    Current and Upcoming Anticipated Closures

    The following shutdown(s)/ closures are anticipated as indicated below. Updates to this schedule will be released weekly in the Project Construction Advisories until the work is complete.  Please contact John Franklin with any specific questions or concerns at john.franklin@ucr.edu.

     

    Description

    Location

    Duration & Date

    Impacted Buildings/ Facilities

    Lot 8

    Lot 8

    Permanently 

    Lot 8

    Lot 43

    Lot 43

    Indefinitely 

    Lot 43

    South Campus Drive

    South Campus Drive

    6/17 – 8/9

    South Campus Drive Road Closure 

    Anderson Park

    Anderson Park

    Indefinitely

    Anderson Park

  • 950592 UCR SBB - Construction Alert #88

    Week of July 15, 2024

    Construction Activities

     

    Location

    Activity

    Equipment Used

    Anticipated Disturbance

    SBB (Lot 8) 

    Install Plumbing Fixtures – RR-L1

    NA

    NA

    SBB (Lot 8)

    Toilet Partitions and Accessories – RR-L1

    NA

    NA

    SBB (Lot 8)

    Seal Concrete Floor – FR08-195

    NA

    NA

    SBB (Lot 8) 

    Install Cafe Equipment – FR08-165

    NA

    NA

    SBB (Lot 8)

    Install Doors & Hardware – INT-L1

    NA

    NA

    SBB (Lot 8)

    Final Coat of Paint – INT-L1

    NA

    NA

    SBB (Lot 8)

    Set Plumbing Finishes – INT-L1

    NA

    NA

    SBB (Lot 8)

    Install AV Devices – INT-AUD

    NA

    NA

    SBB (Lot 8)

    Install Wood Wall Panels – INT-AUD

    NA

    NA

    SBB (Lot 8) 

    Install FF&E – INT-AUD

    NA

    NA

    SBB (Lot 8)

    Install Electrical Finishes – RR-L2

    NA

    NA

    SBB (Lot 8)

    Toilet Partitions and Accessories – RR-L3

    NA

    NA

    SBB (Lot 8)

    Install Interior Glazing Glass – INT-L3

    NA

    NA

    SBB (Lot 8)

    Install Marker Boards – INT-L3

    NA

    NA

    SBB (Lot 8) 

    Install AV Devices – INT-L3

    NA

    NA

    SBB (Lot 8)

    Install Interior Glazing Glass – INT-L4

    NA

    NA

    SBB (Lot 8) 

    F/R/P Wall Footings – SITE-N

    Heavy Equipment

    Noise

    SBB (Lot 8)

    F/R/P Seat Benches – SITE-E

    Heavy Equipment

    Noise

    SBB (Lot 8)

    F/R/P Site Walls – Amphitheater – SITE-E

    Heavy Equipment

    Noise

    SBB (Lot 8)

    Install Site Lighting Underground – SITE-S

    NA

    NA

    SBB (Lot 8)

    Install Irrigation Mains & Sleeves – SITE-S

    NA

    NA

    SBB (Lot 8)

    Install Site Lighting Underground – SITE-W

    NA

    NA

    SBB (Lot 8)

    Install Irrigation Mains & Sleeves – SITE-W

    NA

    NA

    Campus Drive

    F/R/P Curb & Gutter – SITE-CD

    Heavy Equipment 

    Noise

    Campus Drive

    Grade Curb Cuts – SITE-CD

    Heavy Equipment 

    Noise

     

    Week of July 22, 2024

    Construction Activities

     

    Location

    Activity

    Equipment Used

    Anticipated Disturbance

    SBB (Lot 8)

    Install Electrical Finishes – RR-L1

    NA

    NA

    SBB (Lot 8)

    Install Casework / Millwork – INT-L1

    NA

    NA

    SBB (Lot 8)

    MEPF Devices at Wood Ceilings – INT-L1

    NA

    NA

    SBB (Lot 8)

    Install Interior Glazing Glass – INT-L1

    NA

    NA

    SBB (Lot 8)

    Install Wood Ceilings – INT-L1

    NA

    NA

    SBB (Lot 8)

    Install FEC's – INT-L1

    NA

    NA

    SBB (Lot 8)

    Install Operable Partition Walls – INT-L1

    NA

    NA

    SBB (Lot 8)

    Install Wall Protection – INT-L1

    NA

    NA

    SBB (Lot 8)

    Install Marker Boards – INT-L1

    NA

    NA

    SBB (Lot 8)

    Install AV Devices – INT-L1

    NA

    NA

    SBB (Lot 8)

    Install Telecom Devices – INT-L1

    NA

    NA

    SBB (Lot 8)

    Install Electrical Cover Plates – INT-L1

    NA

    NA

    SBB (Lot 8)

    Install Security Devices – INT-L1

    NA

    NA

    SBB (Lot 8)

    Install Carpet & Base – INT-L1

    NA

    NA

    SBB (Lot 8)

    Install Security Devices – INT-AUD

    NA

    NA

    SBB (Lot 8)

    Install Polished Concrete – INT-AUD

    NA

    NA

    SBB (Lot 8)

    Install Marker Boards – INT-AUD

    NA

    NA

    SBB (Lot 8)

    Install Telecom Devices – INT-AUD

    NA

    NA

    SBB (Lot 8)

    Install Electrical Cover Plates – INT-AUD

    NA

    NA

    SBB (Lot 8)

    Final Coat of Paint – RR-L2

    NA

    NA

    SBB (Lot 8)

    MEPF Devices at Wood Ceiling – INT-L2

    NA

    NA

    SBB (Lot 8)

    Install Wood Ceilings – INT-L2

    NA

    NA

    SBB (Lot 8)

    Install Casework / Millwork – INT-L2

    NA

    NA

    SBB (Lot 8)

    Set Plumbing Finishes – INT-L2

    NA

    NA

    SBB (Lot 8)

    Install Electrical Finishes – RR-L3

    NA

    NA

    SBB (Lot 8)

    Install Casework / Millwork – INT-L3

    NA

    NA

    SBB (Lot 8)

    Toilet Partitions and Accessories – RR-L4

    NA

    NA

    SBB (Lot 8)

    Install Casework / Millwork – INT-L4

    NA

    NA

    SBB (Lot 8)

    Install Marker Boards – INT-L4

    NA

    NA

    SBB (Lot 8)

    Install AV Devices – INT-L4

    NA

    NA

    SBB (Lot 8)

    Install FF&E – INT-L4

    NA

    NA

    SBB (Lot 8)

    Remove Protection & Install Finishes – ELEV-295

    NA

    NA

    Anderson Park

    F/R/P Remaining Hardscape Along Campus Drive – SITE-AP

    Heavy Equipment

    Noise

    SBB (Lot 8)

    Backfill / Rough Grade / Cut Curbs – SITE-E

    Heavy Equipment

    Noise

    SBB (Lot 8)

    Install Irrigation Mains & Sleeves – SITE-E

    NA

    NA

    SBB (Lot 8)

    Install Site Lighting Underground – SITE-E

    NA

    NA

    SBB (Lot 8)

    F/R/P Curb & Gutter – SITE-S

    Heavy Equipment

    Noise

    SBB (Lot 8)

    F/R/P Curb & Gutter – SITE-W

    Heavy Equipment

    Noise

    SBB (Lot 8)

    Fine Grade – SITE-W

    Heavy Equipment

    Noise

    SBB (Lot 8)

    Backfill Planters – SITE-W

    Heavy Equipment

    Noise

    SBB (Lot 8)

    F/R/P Hardscape – SITE-W

    Heavy Equipment

    Noise

    Campus Drive

    Fine Grade for Asphalt – SITE-CD

    Heavy Equipment

    Noise

     

    Week of July 29, 2024

    Construction Activities

     

    Location

    Activity

    Equipment Used

    Anticipated Disturbance

    SBB (Lot 8)

    Final Coat of Paint – RR-L1

    NA

    NA

    SBB (Lot 8)

    Install Roll Up Door – FR08-185

    NA

    NA

    SBB (Lot 8)

    Install Window Shades – INT-L1

    NA

    NA

    SBB (Lot 8)

    Install FF&E – INT-L1

    NA

    NA

    SBB (Lot 8)

    Install Polished Concrete – INT-L1

    NA

    NA

    SBB (Lot 8)

    Install Fixed Seating – INT-AUD

    NA

    NA

    SBB (Lot 8)

    Remove Dancefloor – INT-L2

    NA

    NA

    SBB (Lot 8)

    Install Window Shades – INT-L2

    NA

    NA

    SBB (Lot 8)

    Final Coat of Paint – RR-L3

    NA

    NA

    SBB (Lot 8)

    Install Window Shades – INT-L3

    NA

    NA

    SBB (Lot 8)

    Set Plumbing Finishes – INT-L3

    NA

    NA

    SBB (Lot 8)

    Install Electrical Finishes – RR-L4

    NA

    NA

    SBB (Lot 8)

    Install Window Shades – INT-L4

    NA

    NA

    Anderson Park

    Install Site Furnishings – SITE-AP

    NA

    NA

    Anderson Park

    Install Irrigation – SITE-AP

    NA

    NA

    Anderson Park 

    Install Handrail/Guardrail – SITE-AP

    NA

    NA

    SBB (Lot 8)

    Backfill / Rough Grade / Cut Curbs – SITE-N

    Heavy Equipment

    Noise

    SBB (Lot 8)

    F/R/P Curbs – SITE-E

    Heavy Equipment

    Noise

    SBB (Lot 8)

    Fine Grade – SITE-S

    Heavy Equipment

    Noise

    SBB (Lot 8)

    Backfill & LID Planter Install – SITE-S

    Heavy Equipment

    Noise

    SBB (Lot 8)

    F/R/P Hardscape – SITE-S

    Heavy Equipment

    Noise

    SBB (Lot 8)

    F/R/P Stairs – SITE-W

    Heavy Equipment

    Noise

    Campus Drive

    Base & Pave – SITE-CD

    Heavy Equipment

    Noise

     

    Current and Upcoming Anticipated Closures

    The following shutdown(s)/ closures are anticipated as indicated below. Updates to this schedule will be released weekly in the Project Construction Advisories until the work is complete.  Please contact John Franklin with any specific questions or concerns at john.franklin@ucr.edu.

     

    Description

    Location

    Duration & Date

    Impacted Buildings/ Facilities

    Lot 8

    Lot 8

    Permanently 

    Lot 8

    Lot 43

    Lot 43

    Indefinitely 

    Lot 43

    South Campus Drive

    South Campus Drive

    6/17 – 8/9

    South Campus Drive Road Closure 

    Anderson Park

    Anderson Park

    Indefinitely

    Anderson Park

  • 950592 UCR SBB - Construction Alert #87

    Week of July 8, 2024

    Construction Activities

     

    Location

    Activity

    Equipment Used

    Anticipated Disturbance

    SBB Site (Lot 8)

    Toilet Partitions and Accessories - RR-L1

    NA

    NA

    SBB Site (Lot 8)

    Install Cafe Equipment – INT-L1

    NA

    NA

    SBB Site (Lot 8)

    Install FEC's - INT-L1

    NA

    NA

    SBB Site (Lot 8)

    Install Operable Partition Walls – INT-L1

    NA

    NA

    SBB Site (Lot 8)

    Install Wall Protection – INT-L1

    NA

    NA

    SBB Site (Lot 8)

    Install Marker Boards – INT-L1

    NA

    NA

    SBB Site (Lot 8)

    Install AV Devices – INT-L1

    NA

    NA

    SBB Site (Lot 8)

    Install Telecom Devices – INT-L1

    NA

    NA

    SBB Site (Lot 8)

    Install Electrical Cover Plates – INT-L1

    NA

    NA

    SBB Site (Lot 8)

    Install Security Devices – INT-L1

    NA

    NA

    SBB Site (Lot 8)

    Install Casework / Millwork (Remaining) – INT-L1

    NA

    NA

    SBB Site (Lot 8)

    Install Carpet & Base – INT-L1

    NA

    NA

    SBB Site (Lot 8)

    Install AV Devices – INT-AUD

    NA

    NA

    SBB Site (Lot 8)

    Install Handrail – INT-AUD

    NA

    NA

    SBB Site (Lot 8)

    Install Operable Partition Walls – INT-L2

    NA

    NA

    SBB Site (Lot 8)

    Final Coat of Paint – RR-L3

    NA

    NA

    SBB Site (Lot 8)

    Install Electrical Finishes – RR-L4

    NA

    NA

    SBB Site (Lot 8)

    Measure / Fab / Install Countertops (Remaining) – INT-L4

    NA

    NA

    SBB Site (Lot 8)

    Schedule State Elevator Inspection - ELEV

    NA

    NA

    Anderson Park

    Install Handrail / Guardrail - SITE

    NA

    NA

    SBB Site (Lot 8)

    F/R/P Curb & Gutter – SITE-N      

    Heavy Equipment

    Noise

    SBB Site (Lot 8)

    F/R/P Stairs – SITE-E

    Heavy Equipment

    Noise

    SBB Site (Lot 8)

    F/R/P Hardscape – SITE-E

    Heavy Equipment

    Noise

    SBB Site (Lot 8)

    F/R/P Hardscape – SITE-S

    Heavy Equipment

    Noise

    SBB Site (Lot 8)

    Fine Grade – SITE-W       

    Heavy Equipment

    Noise

    SBB Site (Lot 8)

    Backfill Planters – SITE-W

    Heavy Equipment

    Noise

    SBB Site (Lot 8)

    F/R/P Stairs – SITE-W

    Heavy Equipment

    Noise

    SBB Site (Lot 8)

    F/R/P Hardscape – SITE-W

    Heavy Equipment

    Noise

    SBB Site (Lot 8)

    Fine Grade for Asphalt – SITE-CD

    Heavy Equipment

    Noise

     

    Week of July 15, 2024

    Construction Activities 

     

    Location

    Activity

    Equipment Used

    Anticipated Disturbance

    SBB (Lot 8) 

    Complete Landscape Finish Site Work at Manlift Leaveout – ML

    NA

    NA

    SBB (Lot 8)

    Install Electrical Finishes – RR-L1

    NA

    NA

    SBB (Lot 8)

    Final Coat of Paint – RR-L1

    NA

    NA

    SBB (Lot 8) 

    Install FF&E – INT-L1

    NA

    NA

    SBB (Lot 8)

    Install Marker Boards – INT-AUD

    NA

    NA

    SBB (Lot 8)

    Install Polished Concrete – INT-AUD

    NA

    NA

    SBB (Lot 8)

    Install Security Devices – INT-AUD

    NA

    NA

    SBB (Lot 8)

    Install Telecom Devices – INT-AUD

    NA

    NA

    SBB (Lot 8)

    Install Electrical Cover Plates – INT-AUD

    NA

    NA

    SBB (Lot 8) 

    Final Coat of Paint – INT-L2

    NA

    NA

    SBB (Lot 8)

    Final Coat of Paint – INT-L3

    NA

    NA

    SBB (Lot 8)

    Final Coat of Paint – RR-L4

    NA

    NA

    SBB (Lot 8)

    Install FF&E – INT-L4

    NA

    NA

    Anderson Park

    Install Site Furnishings – SITE-AP

    NA

    NA

    Anderson Park

    Install Irrigation – SITE-AP

    NA

    NA

    SBB (Lot 8)

    Fine Grade – SITE-N

    Heavy Equipment

    Noise

    SBB (Lot 8) 

    Backfill Planters – SITE-N

    Heavy Equipment

    Noise

    SBB (Lot 8)

    F/R/P Stairs – SITE-N

    Heavy Equipment

    Noise

    SBB (Lot 8)

    F/R/P Hardscape – SITE-N

    Heavy Equipment

    Noise

    SBB (Lot 8)

    Field Measure and Procure Handrail / Guardrail – SITE-E

    NA

    NA

    SBB (Lot 8)

    Field Measure and Procure Handrail / Guardrail – SITE-W

    NA

    NA

    Campus Drive

    Base & Pave – SITE-CD

    Heavy Equipment

    Noise

    Campus Drive

    Demo – SITE-CD

    Heavy Equipment

    Noise

    Campus Drive

    Rough Grade – SITE-CD

    Heavy Equipment 

    Noise

     

    Week of July 22, 2024

    Construction Activities

     

    Location

    Activity

    Equipment Used

    Anticipated Disturbance

    SBB (Lot 8)

    MEPF Devices at Wood Ceiling – INT-L2

    NA

    NA

    SBB (Lot 8)

    Measure / Fab / Install Countertops (Remaining) – INT-L2

    NA

    NA

    SBB (Lot 8)

    Install Wood Ceilings – INT-L2

    NA

    NA

    SBB (Lot 8)

    Install Fixed Seating – INT-L2

    NA

    NA

    SBB (Lot 8)

    MEPF Devices at Wood Ceiling – INT-L2

    NA

    NA

    SBB (Lot 8)

    Install Wood Ceilings – INT-L2

    NA

    NA

    SBB (Lot 8)

    Install Wall Protection – INT-L2

    NA

    NA

    SBB (Lot 8)

    Install Marker Boards – INT-L2

    NA

    NA

    SBB (Lot 8)

    Install Wall Protection – INT-L3

    NA

    NA

    SBB (Lot 8)

    Final Coat of Paint – INT-L4

    NA

    NA

    SBB (Lot 8)

    Field Measure and Procure Handrail / Guardrail – SITE-N

    NA

    NA

    SBB (Lot 8)

    Install Site Furnishings – SITE-E

    NA

    NA

    SBB (Lot 8)

    Install Irrigation – SITE-E

    NA

    NA

    Campus Drive

    Grade Curb Cuts – SITE-CD

    Heavy Equipment

    Noise

    Campus Drive

    F/R/P Curb & Gutter – SITE-CD

    Heavy Equipment

    Noise

     

    Current and Upcoming Anticipated Closures

    The following shutdown(s)/ closures are anticipated as indicated below. Updates to this schedule will be released weekly in the Project Construction Advisories until the work is complete.  Please contact John Franklin with any specific questions or concerns at john.franklin@ucr.edu.

     

    Description

    Location

    Duration & Date

    Impacted Buildings/ Facilities

    Lot 8

    Lot 8

    Permanently 

    Lot 8

    Lot 43

    Lot 43

    Indefinitely 

    Lot 43

    South Campus Drive

    South Campus Drive

    6/17 – 7/26

    South Campus Drive Road Closure 

    Anderson Park

    Anderson Park

    Indefinitely

    Anderson Park

  • 950592 UCR SBB - Construction Alert #86

    Week of July 1, 2024

    Construction Activities

     

    Location

    Activity

    Equipment Used

    Anticipated Disturbance

    SBB Site (Lot 8)

    Complete Hardscape Finish Site Work at Manlift Leaveout – EXT-ML

    NA

    NA

    SBB Site (Lot 8)

    Seal Concrete Floor – INT-L1

    NA

    NA

    SBB Site (Lot 8)

    Install Doors & Hardware – INT-L1

    NA

    NA

    SBB Site (Lot 8)

    Set Plumbing Finishes – INT-L1

    NA

    NA

    SBB Site (Lot 8)

    Final Coat of Paint – INT-L1

    NA

    NA

    SBB Site (Lot 8)

    Install Linoleum Flooring – INT-L1

    NA

    NA

    SBB Site (Lot 8)

    Install Signage – INT-AUD

    NA

    NA

    SBB Site (Lot 8)

    Install FEC's – INT-AUD

    NA

    NA

    SBB Site (Lot 8)

    Install Doors & Hardware – INT-AUD

    NA

    NA

    SBB Site (Lot 8)

    Install Wall Protection – INT-AUD

    NA

    NA

    SBB Site (Lot 8)

    Install Wood Wall Panels – INT-AUD

    NA

    NA

    SBB Site (Lot 8)

    Install FF&E – INT-AUD

    NA

    NA

    SBB Site (Lot 8)

    Acoustical Wall Panels – INT-AUD

    NA

    NA

    SBB Site (Lot 8)

    Final Coat of Paint – RR-L2

    NA

    NA

    SBB Site (Lot 8)

    Install FEC's – INT-L2

    NA

    NA

    SBB Site (Lot 8)

    Set Plumbing Finishes – INT-L2

    NA

    NA

    SBB Site (Lot 8)

    Install Electrical Finishes – RR-L3

    NA

    NA

    SBB Site (Lot 8)

    Install FEC's – INT-L3

    NA

    NA

    SBB Site (Lot 8)

    Set Plumbing Finishes – INT-L3

    NA

    NA

    SBB Site (Lot 8)

    Measure / Fab / Install Countertops (Remaining) – INT-L3 

    NA

    NA

    SBB Site (Lot 8)

    Install FF&E – INT-L3

    NA

    NA

    SBB Site (Lot 8)

    Toilet Partitions and Accessories – RR-L4

    NA

    NA

    SBB Site (Lot 8)

    Install FEC's – INT-L4

    NA

    NA

    SBB Site (Lot 8)

    Set Plumbing Finishes – INT-L4

    NA

    NA

    SBB Site (Lot 8)

    Install Casework / Millwork (Remaining) – INT-L4

    NA

    NA

    SBB Site (Lot 8)

    Fine Grade – SITE-E

    Heavy Equipment

    Noise

    SBB Site (Lot 8)

    F/R/P Curb & Gutter – SITE-W

    Heavy Equipment

    Noise

    SBB Site (Lot 8)

    F/R/P Curb & Gutter – SITE-CD

    Heavy Equipment

    Noise

    SBB (Lot 8)

    Air Balance - Level 3 – SU-TB

    NA

    NA

     

    Week of July 8, 2024

    Construction Activities

     

    Location

    Activity

    Equipment Used

    Anticipated Disturbance

    SBB Site (Lot 8)

    Toilet Partitions and Accessories - RR-L1

    NA

    NA

    SBB Site (Lot 8)

    Install Cafe Equipment – INT-L1

    NA

    NA

    SBB Site (Lot 8)

    Install FEC's - INT-L1

    NA

    NA

    SBB Site (Lot 8)

    Install Operable Partition Walls – INT-L1

    NA

    NA

    SBB Site (Lot 8)

    Install Wall Protection – INT-L1

    NA

    NA

    SBB Site (Lot 8)

    Install Marker Boards – INT-L1

    NA

    NA

    SBB Site (Lot 8)

    Install AV Devices – INT-L1

    NA

    NA

    SBB Site (Lot 8)

    Install Telecom Devices – INT-L1

    NA

    NA

    SBB Site (Lot 8)

    Install Electrical Cover Plates – INT-L1

    NA

    NA

    SBB Site (Lot 8)

    Install Security Devices – INT-L1

    NA

    NA

    SBB Site (Lot 8)

    Install Casework / Millwork (Remaining) – INT-L1

    NA

    NA

    SBB Site (Lot 8)

    Install Carpet & Base – INT-L1

    NA

    NA

    SBB Site (Lot 8)

    Install AV Devices – INT-AUD

    NA

    NA

    SBB Site (Lot 8)

    Install Handrail – INT-AUD

    NA

    NA

    SBB Site (Lot 8)

    Install Operable Partition Walls – INT-L2

    NA

    NA

    SBB Site (Lot 8)

    Final Coat of Paint – RR-L3

    NA

    NA

    SBB Site (Lot 8)

    Install Electrical Finishes – RR-L4

    NA

    NA

    SBB Site (Lot 8)

    Measure / Fab / Install Countertops (Remaining) – INT-L4

    NA

    NA

    SBB Site (Lot 8)

    Schedule State Elevator Inspection - ELEV

    NA

    NA

    Anderson Park

    Install Handrail / Guardrail - SITE

    NA

    NA

    SBB Site (Lot 8)

    F/R/P Curb & Gutter – SITE-N      

    Heavy Equipment

    Noise

    SBB Site (Lot 8)

    F/R/P Stairs – SITE-E

    Heavy Equipment

    Noise

    SBB Site (Lot 8)

    F/R/P Hardscape – SITE-E

    Heavy Equipment

    Noise

    SBB Site (Lot 8)

    F/R/P Hardscape – SITE-S

    Heavy Equipment

    Noise

    SBB Site (Lot 8)

    Fine Grade – SITE-W       

    Heavy Equipment

    Noise

    SBB Site (Lot 8)

    Backfill Planters – SITE-W

    Heavy Equipment

    Noise

    SBB Site (Lot 8)

    F/R/P Stairs – SITE-W

    Heavy Equipment

    Noise

    SBB Site (Lot 8)

    F/R/P Hardscape – SITE-W

    Heavy Equipment

    Noise

    SBB Site (Lot 8)

    Fine Grade for Asphalt – SITE-CD

    Heavy Equipment

    Noise

     

    Week of July 15, 2024

    Construction Activities 

     

    Location

    Activity

    Equipment Used

    Anticipated Disturbance

    SBB (Lot 8) 

    Complete Landscape Finish Site Work at Manlift Leaveout – ML

    NA

    NA

    SBB (Lot 8)

    Install Electrical Finishes – RR-L1

    NA

    NA

    SBB (Lot 8)

    Final Coat of Paint – RR-L1

    NA

    NA

    SBB (Lot 8) 

    Install FF&E – INT-L1

    NA

    NA

    SBB (Lot 8)

    Install Marker Boards – INT-AUD

    NA

    NA

    SBB (Lot 8)

    Install Polished Concrete – INT-AUD

    NA

    NA

    SBB (Lot 8)

    Install Security Devices – INT-AUD

    NA

    NA

    SBB (Lot 8)

    Install Telecom Devices – INT-AUD

    NA

    NA

    SBB (Lot 8)

    Install Electrical Cover Plates – INT-AUD

    NA

    NA

    SBB (Lot 8) 

    Final Coat of Paint – INT-L2

    NA

    NA

    SBB (Lot 8)

    Final Coat of Paint – INT-L3

    NA

    NA

    SBB (Lot 8)

    Final Coat of Paint – RR-L4

    NA

    NA

    SBB (Lot 8)

    Install FF&E – INT-L4

    NA

    NA

    Anderson Park

    Install Site Furnishings – SITE-AP

    NA

    NA

    Anderson Park

    Install Irrigation – SITE-AP

    NA

    NA

    SBB (Lot 8)

    Fine Grade – SITE-N

    Heavy Equipment

    Noise

    SBB (Lot 8) 

    Backfill Planters – SITE-N

    Heavy Equipment

    Noise

    SBB (Lot 8)

    F/R/P Stairs – SITE-N

    Heavy Equipment

    Noise

    SBB (Lot 8)

    F/R/P Hardscape – SITE-N

    Heavy Equipment

    Noise

    SBB (Lot 8)

    Field Measure and Procure Handrail / Guardrail – SITE-E

    NA

    NA

    SBB (Lot 8)

    Field Measure and Procure Handrail / Guardrail – SITE-W

    NA

    NA

    Campus Drive

    Base & Pave – SITE-CD

    Heavy Equipment

    Noise

    Campus Drive

    Demo – SITE-CD

    Heavy Equipment

    Noise

    Campus Drive

    Rough Grade – SITE-CD

    Heavy Equipment 

    Noise

     

    Current and Upcoming Anticipated Closures

    The following shutdown(s)/ closures are anticipated as indicated below. Updates to this schedule will be released weekly in the Project Construction Advisories until the work is complete.  Please contact John Franklin with any specific questions or concerns at john.franklin@ucr.edu.

     

    Description

    Location

    Duration & Date

    Impacted Buildings/ Facilities

    Lot 8

    Lot 8

    Permanently 

    Lot 8

    Lot 43

    Lot 43

    Indefinitely 

    Lot 43

    South Campus Drive

    South Campus Drive

    6/17 – 7/26

    South Campus Drive Road Closure 

    Anderson Park

    Anderson Park

    Indefinitely

    Anderson Park

  • 950592 UCR SBB - Construction Alert #85

    Week of June 24, 2024

    Construction Activities 

     

    Location

    Activity

    Equipment Used

    Anticipated Disturbance

    SBB (Lot 8) 

    Install Permanent Roofing - RF

    NA

    NA

    SBB (Lot 8)

    Install Countertops – RR-L1

    NA

    NA

    SBB (Lot 8)

    Install Lights and Egress Lighting – INT-L1

    NA

    NA

    SBB (Lot 8) 

    Install HVAC Grills & Diffusers – INT-L1

    NA

    NA

    SBB (Lot 8)

    Install Fire Sprinkler Drops / Heads – INT-L1

    NA

    NA

    SBB (Lot 8)

    Install Fire Alarm Devices – INT-L1

    NA

    NA

    SBB (Lot 8)

    Wood Ceiling Hangers / Grid Supports – INT-L1

    NA

    NA

    SBB (Lot 8)

    Install Casework / Millwork (Wet) – INT-L1

    NA

    NA

    SBB (Lot 8)

    Install Fire Sprinkler Drops / Heads – INT-AUD

    NA

    NA

    SBB (Lot 8) 

    Install Fire Alarm Devices – INT-AUD

    NA

    NA

    SBB (Lot 8)

    Install Lights and Egress Lighting – INT-AUD

    NA

    NA

    SBB (Lot 8)

    Install HVAC Grills & Diffusers – INT-AUD

    NA

    NA

    SBB (Lot 8)

    Final Overhead Inspections and Sign-off for Ceiling Tile – INT-AUD

    NA

    NA

    SBB (Lot 8)

    Install Tile – RR-L2

    NA

    NA

    SBB (Lot 8)

    Wood Ceiling Hangers / Grid Supports – INT-L2

    NA

    NA

    SBB (Lot 8)

    Install Casework / Millwork (Remaining and Wet) – INT-L2

    NA

    NA

    SBB (Lot 8) 

    Install Carpet & Base – INT-L2

    NA

    NA

    SBB (Lot 8)

    Install AV Devices – INT-L2

    NA

    NA

    SBB (Lot 8)

    Install Tile – RR-L3

    NA

    NA

    SBB (Lot 8)

    Install Linoleum Flooring – INT-L3

    NA

    NA

    SBB (Lot 8)

    Install Lockers – INT-L3

    NA

    NA

    SBB (Lot 8)

    Install Casework / Millwork (Wet) – INT-L3

    NA

    NA

    SBB (Lot 8)

    Install Tile – RR-L4

    NA

    NA

    SBB (Lot 8)

    Install Telecom Devices – INT-L4

    NA

    NA

    SBB (Lot 8)

    Install Electrical Cover Plates – INT-L4

    NA

    NA

    SBB (Lot 8)

    Install Security Devices – INT-L4

    NA

    NA

    Anderson Park

    Install Interior Glazing – INT-L4

    NA

    NA

    SBB Site (Lot 8)

    Install Acoustical Ceiling Tile – INT-L4

    NA

    NA

    SBB Site (Lot 8)

    Install Casework / Millwork (Wet) – INT-L4

    NA

    NA

    SBB Site (Lot 8)

    Install Site Furnishings – SITE-AP

    Heavy Equipment

    Noise

    Anderson Park

    Install Irrigation Sleeves – SITE-N

    Heavy Equipment

    Noise

    SBB Site (Lot 8)

    Install Site Lighting Underground – SITE-N

    Heavy Equipment

    Noise

    SBB Site (Lot 8)

    Install Site Lighting Underground – SITE-E

    Heavy Equipment

    Noise

    SBB Site (Lot 8)

    Install Site Lighting Underground – SITE-S

    Heavy Equipment

    Noise

    SBB Site (Lot 8)

    F/R/P Curb & Gutter – SITE-S

    Heavy Equipment

    Noise

    SBB Site (Lot 8)

    Rough Grade / Cut Curbs – SITE-W

    Heavy Equipment

    Noise

    SBB Site (Lot 8)

    Install Irrigation Sleeves – SITE-W

    Heavy Equipment

    Noise

    SBB Site (Lot 8)

    Install Site Lighting Underground – SITE-W

    Heavy Equipment

    Noise

     

    Week of July 1, 2024

    Construction Activities

     

    Location

    Activity

    Equipment Used

    Anticipated Disturbance

    SBB Site (Lot 8)

    Complete Hardscape Finish Site Work at Manlift Leaveout – EXT-ML

    NA

    NA

    SBB Site (Lot 8)

    Seal Concrete Floor – INT-L1

    NA

    NA

    SBB Site (Lot 8)

    Install Doors & Hardware – INT-L1

    NA

    NA

    SBB Site (Lot 8)

    Set Plumbing Finishes – INT-L1

    NA

    NA

    SBB Site (Lot 8)

    Final Coat of Paint – INT-L1

    NA

    NA

    SBB Site (Lot 8)

    Install Linoleum Flooring – INT-L1

    NA

    NA

    SBB Site (Lot 8)

    Install Signage – INT-AUD

    NA

    NA

    SBB Site (Lot 8)

    Install FEC's – INT-AUD

    NA

    NA

    SBB Site (Lot 8)

    Install Doors & Hardware – INT-AUD

    NA

    NA

    SBB Site (Lot 8)

    Install Wall Protection – INT-AUD

    NA

    NA

    SBB Site (Lot 8)

    Install Wood Wall Panels – INT-AUD

    NA

    NA

    SBB Site (Lot 8)

    Install FF&E – INT-AUD

    NA

    NA

    SBB Site (Lot 8)

    Acoustical Wall Panels – INT-AUD

    NA

    NA

    SBB Site (Lot 8)

    Final Coat of Paint – RR-L2

    NA

    NA

    SBB Site (Lot 8)

    Install FEC's – INT-L2

    NA

    NA

    SBB Site (Lot 8)

    Set Plumbing Finishes – INT-L2

    NA

    NA

    SBB Site (Lot 8)

    Install Electrical Finishes – RR-L3

    NA

    NA

    SBB Site (Lot 8)

    Install FEC's – INT-L3

    NA

    NA

    SBB Site (Lot 8)

    Set Plumbing Finishes – INT-L3

    NA

    NA

    SBB Site (Lot 8)

    Measure / Fab / Install Countertops (Remaining) – INT-L3 

    NA

    NA

    SBB Site (Lot 8)

    Install FF&E – INT-L3

    NA

    NA

    SBB Site (Lot 8)

    Toilet Partitions and Accessories – RR-L4

    NA

    NA

    SBB Site (Lot 8)

    Install FEC's – INT-L4

    NA

    NA

    SBB Site (Lot 8)

    Set Plumbing Finishes – INT-L4

    NA

    NA

    SBB Site (Lot 8)

    Install Casework / Millwork (Remaining) – INT-L4

    NA

    NA

    SBB Site (Lot 8)

    Fine Grade – SITE-E

    Heavy Equipment

    Noise

    SBB Site (Lot 8)

    F/R/P Curb & Gutter – SITE-W

    Heavy Equipment

    Noise

    SBB Site (Lot 8)

    F/R/P Curb & Gutter – SITE-CD

    Heavy Equipment

    Noise

    SBB (Lot 8)

    Air Balance - Level 3 – SU-TB

    NA

    NA

     

    Week of July 8, 2024

    Construction Activities

     

    Location

    Activity

    Equipment Used

    Anticipated Disturbance

    SBB Site (Lot 8)

    Toilet Partitions and Accessories - RR-L1

    NA

    NA

    SBB Site (Lot 8)

    Install Cafe Equipment – INT-L1

    NA

    NA

    SBB Site (Lot 8)

    Install FEC's - INT-L1

    NA

    NA

    SBB Site (Lot 8)

    Install Operable Partition Walls – INT-L1

    NA

    NA

    SBB Site (Lot 8)

    Install Wall Protection – INT-L1

    NA

    NA

    SBB Site (Lot 8)

    Install Marker Boards – INT-L1

    NA

    NA

    SBB Site (Lot 8)

    Install AV Devices – INT-L1

    NA

    NA

    SBB Site (Lot 8)

    Install Telecom Devices – INT-L1

    NA

    NA

    SBB Site (Lot 8)

    Install Electrical Cover Plates – INT-L1

    NA

    NA

    SBB Site (Lot 8)

    Install Security Devices – INT-L1

    NA

    NA

    SBB Site (Lot 8)

    Install Casework / Millwork (Remaining) – INT-L1

    NA

    NA

    SBB Site (Lot 8)

    Install Carpet & Base – INT-L1

    NA

    NA

    SBB Site (Lot 8)

    Install AV Devices – INT-AUD

    NA

    NA

    SBB Site (Lot 8)

    Install Handrail – INT-AUD

    NA

    NA

    SBB Site (Lot 8)

    Install Operable Partition Walls – INT-L2

    NA

    NA

    SBB Site (Lot 8)

    Final Coat of Paint – RR-L3

    NA

    NA

    SBB Site (Lot 8)

    Install Electrical Finishes – RR-L4

    NA

    NA

    SBB Site (Lot 8)

    Measure / Fab / Install Countertops (Remaining) – INT-L4

    NA

    NA

    SBB Site (Lot 8)

    Schedule State Elevator Inspection - ELEV

    NA

    NA

    Anderson Park

    Install Handrail / Guardrail - SITE

    NA

    NA

    SBB Site (Lot 8)

    F/R/P Curb & Gutter – SITE-N      

    Heavy Equipment

    Noise

    SBB Site (Lot 8)

    F/R/P Stairs – SITE-E

    Heavy Equipment

    Noise

    SBB Site (Lot 8)

    F/R/P Hardscape – SITE-E

    Heavy Equipment

    Noise

    SBB Site (Lot 8)

    F/R/P Hardscape – SITE-S

    Heavy Equipment

    Noise

    SBB Site (Lot 8)

    Fine Grade – SITE-W       

    Heavy Equipment

    Noise

    SBB Site (Lot 8)

    Backfill Planters – SITE-W

    Heavy Equipment

    Noise

    SBB Site (Lot 8)

    F/R/P Stairs – SITE-W

    Heavy Equipment

    Noise

    SBB Site (Lot 8)

    F/R/P Hardscape – SITE-W

    Heavy Equipment

    Noise

    SBB Site (Lot 8)

    Fine Grade for Asphalt – SITE-CD

    Heavy Equipment

    Noise

     

    Current and Upcoming Anticipated Closures

    The following shutdown(s)/ closures are anticipated as indicated below. Updates to this schedule will be released weekly in the Project Construction Advisories until the work is complete.  Please contact John Franklin with any specific questions or concerns at john.franklin@ucr.edu.

     

    Description

    Location

    Duration & Date

    Impacted Buildings/ Facilities

    Lot 8

    Lot 8

    Permanently 

    Lot 8

    Lot 43

    Lot 43

    Indefinitely 

    Lot 43

    South Campus Drive

    South Campus Drive

    6/17 – 7/19

    South Campus Drive Road Closure 

    Anderson Park

    Anderson Park

    Indefinitely

    Anderson Park

  • 950592 UCR SBB - Construction Alert #84

    Current Week

    Construction Activities

     

    Location

    Activity

    Equipment Used

    Anticipated Disturbance

    SBB Site (Lot 8)

    Install Parapet Cap - RF

    NA

    NA

    SBB Site (Lot 8)

    Deck Edge Metal Panels at Windows – EXT-SW

    NA

    NA

    SBB Site (Lot 8)

    Install Window Shades – EXT-NE

    NA

    NA

    SBB Site (Lot 8)

    Deck Edge Metal Panels at Windows – EXT-NE

    NA

    NA

    SBB Site (Lot 8)

    Curtain Wall - Frames & Glass – Manlift Leavout

    NA

    NA

    SBB Site (Lot 8)

    Install Window Shades – Manlift Leavout

    NA

    NA

    SBB Site (Lot 8)

    Install Tile – RR-L1

    NA

    NA

    SBB Site (Lot 8)

    Install Cafe Equipment 

    NA

    NA

    SBB Site (Lot 8)

    Install Lights and Egress Lighting – INT-L1

    NA

    NA

    SBB Site (Lot 8)

    Install HVAC Grills & Diffusers – INT-L1

    NA

    NA

    SBB Site (Lot 8)

    Install Casework / Millwork (Wet) – INT-L1

    NA

    NA

    SBB Site (Lot 8)

    Final Overhead Inspections and Sign-off for Ceiling Tile – INT-L1

    NA

    NA

    SBB Site (Lot 8)

    Prime & Paint Walls – INT-AUD

    NA

    NA

    SBB Site (Lot 8)

    Toilet Partitions and Accessories – RR-L2

    NA

    NA

    SBB Site (Lot 8)

    Install Casework / Millwork (Remaining) – INT-L2

    NA

    NA

    SBB Site (Lot 8)

    Install Carpet & Base – INT-L2

    NA

    NA

    SBB Site (Lot 8)

    Install Doors & Hardware – INT-L2

    NA

    NA

    SBB Site (Lot 8)

    Install Tile – RR-L3

    NA

    NA

    SBB Site (Lot 8)

    Install Plumbing Fixtures – RR-L3

    NA

    NA

    SBB Site (Lot 8)

    Install Linoleum Flooring – INT-L3

    NA

    NA

    SBB Site (Lot 8)

    Install Doors & Hardware – INT-L3

    NA

    NA

    SBB Site (Lot 8)

    Install AV Devices – INT-L3

    NA

    NA

    SBB Site (Lot 8)

    Install Tile – RR-L4

    NA

    NA

    SBB Site (Lot 8)

    Install Acoustical Ceiling Tile – INT-L4

    NA

    NA

    SBB Site (Lot 8)

    Install Casework / Millwork (Wet) – INT-L4

    NA

    NA

    SBB Site (Lot 8)

    Install Doors & Hardware – INT-L4

    NA

    NA

    Anderson Park

    Install landscaping – SITE-AP

    Heavy Equipment

    Noise

    SBB Site (Lot 8)

    F/R/P Site Walls – SITE-N

    Heavy Equipment

    Noise

    SBB Site (Lot 8)

    F/R/P Curbs – SITE-E

    Heavy Equipment

    Noise

    SBB Site (Lot 8)

    F/R/P Seat Wall – SITE-E

    Heavy Equipment

    Noise

    SBB Site (Lot 8)

    Backfill & LID Planter Install – SITE-S

    Heavy Equipment

    Noise

     

    Week of June 24, 2024

    Construction Activities 

     

    Location

    Activity

    Equipment Used

    Anticipated Disturbance

    SBB Site (Lot 8)

    Install Permanent Roofing - RF

    NA

    NA

    SBB Site (Lot 8)

    Install Countertops – RR-L1

    NA

    NA

    SBB Site (Lot 8)

    Install Lights and Egress Lighting – INT-L1

    NA

    NA

    SBB Site (Lot 8)

    Install HVAC Grills & Diffusers – INT-L1

    NA

    NA

    SBB Site (Lot 8)

    Install Fire Sprinkler Drops / Heads – INT-L1

    NA

    NA

    SBB Site (Lot 8)

    Install Fire Alarm Devices – INT-L1

    NA

    NA

    SBB Site (Lot 8)

    Wood Ceiling Hangers / Grid Supports – INT-L1

    NA

    NA

    SBB Site (Lot 8)

    Install Casework / Millwork (Wet) – INT-L1

    NA

    NA

    SBB Site (Lot 8)

    Install Fire Sprinkler Drops / Heads – INT-AUD

    NA

    NA

    SBB Site (Lot 8)

    Install Fire Alarm Devices – INT-AUD

    NA

    NA

    SBB Site (Lot 8)

    Install Lights and Egress Lighting – INT-AUD

    NA

    NA

    SBB Site (Lot 8)

    Install HVAC Grills & Diffusers – INT-AUD

    NA

    NA

    SBB Site (Lot 8)

    Final Overhead Inspections and Sign-off for Ceiling Tile – INT-AUD

    NA

    NA

    SBB Site (Lot 8)

    Install Tile – RR-L2

    NA

    NA

    SBB Site (Lot 8)

    Wood Ceiling Hangers / Grid Supports – INT-L2

    NA

    NA

    SBB Site (Lot 8)

    Install Casework / Millwork (Remaining and Wet) – INT-L2

    NA

    NA

    SBB Site (Lot 8)

    Install Carpet & Base – INT-L2

    NA

    NA

    SBB Site (Lot 8)

    Install AV Devices – INT-L2

    NA

    NA

    SBB Site (Lot 8)

    Install Tile – RR-L3

    NA

    NA

    SBB Site (Lot 8)

    Install Linoleum Flooring – INT-L3

    NA

    NA

    SBB Site (Lot 8)

    Install Lockers – INT-L3

    NA

    NA

    SBB Site (Lot 8)

    Install Casework / Millwork (Wet) – INT-L3

    NA

    NA

    SBB Site (Lot 8)

    Install Tile – RR-L4

    NA

    NA

    SBB Site (Lot 8)

    Install Telecom Devices – INT-L4

    NA

    NA

    SBB Site (Lot 8)

    Install Electrical Cover Plates – INT-L4

    NA

    NA

    SBB Site (Lot 8)

    Install Security Devices – INT-L4

    NA

    NA

    Anderson Park

    Install Interior Glazing – INT-L4

    NA

    NA

    SBB Site (Lot 8)

    Install Acoustical Ceiling Tile – INT-L4

    NA

    NA

    SBB Site (Lot 8)

    Install Casework / Millwork (Wet) – INT-L4

    NA

    NA

    SBB Site (Lot 8)

    Install Site Furnishings – SITE-AP

    Heavy Equipment

    Noise

    Anderson Park

    Install Irrigation Sleeves – SITE-N

    Heavy Equipment

    Noise

    SBB Site (Lot 8)

    Install Site Lighting Underground – SITE-N

    Heavy Equipment

    Noise

    SBB Site (Lot 8)

    Install Site Lighting Underground – SITE-E

    Heavy Equipment

    Noise

    SBB Site (Lot 8)

    Install Site Lighting Underground – SITE-S

    Heavy Equipment

    Noise

    SBB Site (Lot 8)

    F/R/P Curb & Gutter – SITE-S

    Heavy Equipment

    Noise

    SBB Site (Lot 8)

    Rough Grade / Cut Curbs – SITE-W

    Heavy Equipment

    Noise

    SBB Site (Lot 8)

    Install Irrigation Sleeves – SITE-W

    Heavy Equipment

    Noise

    SBB Site (Lot 8)

    Install Site Lighting Underground – SITE-W

    Heavy Equipment

    Noise

     

    Week of July 1, 2024

    Construction Activities

     

    Location

    Activity

    Equipment Used

    Anticipated Disturbance

    SBB Site (Lot 8)

    Complete Hardscape Finish Site Work at Manlift Leaveout – EXT-ML

    NA

    NA

    SBB Site (Lot 8)

    Seal Concrete Floor – INT-L1

    NA

    NA

    SBB Site (Lot 8)

    Install Doors & Hardware – INT-L1

    NA

    NA

    SBB Site (Lot 8)

    Set Plumbing Finishes – INT-L1

    NA

    NA

    SBB Site (Lot 8)

    Final Coat of Paint – INT-L1

    NA

    NA

    SBB Site (Lot 8)

    Install Linoleum Flooring – INT-L1

    NA

    NA

    SBB Site (Lot 8)

    Install Signage – INT-AUD

    NA

    NA

    SBB Site (Lot 8)

    Install FEC's – INT-AUD

    NA

    NA

    SBB Site (Lot 8)

    Install Doors & Hardware – INT-AUD

    NA

    NA

    SBB Site (Lot 8)

    Install Wall Protection – INT-AUD

    NA

    NA

    SBB Site (Lot 8)

    Install Wood Wall Panels – INT-AUD

    NA

    NA

    SBB Site (Lot 8)

    Install FF&E – INT-AUD

    NA

    NA

    SBB Site (Lot 8)

    Acoustical Wall Panels – INT-AUD

    NA

    NA

    SBB Site (Lot 8)

    Final Coat of Paint – RR-L2

    NA

    NA

    SBB Site (Lot 8)

    Install FEC's – INT-L2

    NA

    NA

    SBB Site (Lot 8)

    Set Plumbing Finishes – INT-L2

    NA

    NA

    SBB Site (Lot 8)

    Install Electrical Finishes – RR-L3

    NA

    NA

    SBB Site (Lot 8)

    Install FEC's – INT-L3

    NA

    NA

    SBB Site (Lot 8)

    Set Plumbing Finishes – INT-L3

    NA

    NA

    SBB Site (Lot 8)

    Measure / Fab / Install Countertops (Remaining) – INT-L3 

    NA

    NA

    SBB Site (Lot 8)

    Install FF&E – INT-L3

    NA

    NA

    SBB Site (Lot 8)

    Toilet Partitions and Accessories – RR-L4

    NA

    NA

    SBB Site (Lot 8)

    Install FEC's – INT-L4

    NA

    NA

    SBB Site (Lot 8)

    Set Plumbing Finishes – INT-L4

    NA

    NA

    SBB Site (Lot 8)

    Install Casework / Millwork (Remaining) – INT-L4

    NA

    NA

    SBB Site (Lot 8)

    Fine Grade – SITE-E

    Heavy Equipment

    Noise

    SBB Site (Lot 8)

    F/R/P Curb & Gutter – SITE-W

    Heavy Equipment

    Noise

    SBB Site (Lot 8)

    F/R/P Curb & Gutter – SITE-CD

    Heavy Equipment

    Noise

    SBB (Lot 8)

    Air Balance - Level 3 – SU-TB

    NA

    NA

     

    Current and Upcoming Anticipated Closures

    The following shutdown(s)/ closures are anticipated as indicated below. Updates to this schedule will be released weekly in the Project Construction Advisories until the work is complete.  Please contact John Franklin with any specific questions or concerns at john.franklin@ucr.edu.

     

    Description

    Location

    Duration & Date

    Impacted Buildings/ Facilities

    Lot 8

    Lot 8

    Permanently 

    Lot 8

    Lot 43

    Lot 43

    Indefinitely 

    Lot 43

    South Campus Drive

    South Campus Drive

    6/17 – 7/19

    South Campus Drive Road Closure 

    Anderson Park

    Anderson Park

    Indefinitely

    Anderson Park

     

  • 950592 UCR SBB - Construction Alert #83

    Current Week

    Construction Activities

     

    Location

    Activity

    Equipment Used

    Anticipated Disturbance

    SBB (Lot 8) 

    Install Permanent Roofing - Roof

    NA

    NA

    SBB (Lot 8)

    Boardroom Curtain Wall – EXT-SW

    NA

    NA

    SBB (Lot 8)

    Install Window Shades – EXT-NE

    NA

    NA

    SBB (Lot 8) 

    Demo Manlift Pad and Grade

    NA

    NA

    SBB (Lot 8)

    Curtain Wall frames and Glass at Manlift Leave out

    NA

    NA

    SBB (Lot 8)

    Install Countertops – RR

    NA

    NA

    SBB (Lot 8)

    Install Tile – RR

    NA

    NA

    SBB (Lot 8)

    Install café Equipment 

    NA

    NA

    SBB (Lot 8)

    Install Lights and Egress Lighting – INT-L1

    NA

    NA

    SBB (Lot 8) 

    Install HVAC Grills & Diffusers  – INT-L1

    NA

    NA

    SBB (Lot 8)

    Install Fire Sprinkler Drops / Heads  – INT-L1

    NA

    NA

    SBB (Lot 8)

    Install Fire Alarm Devices  – INT-L1

    NA

    NA

    SBB (Lot 8)

    Wood Ceiling Hangers / Grid Supports  – INT-L1

    NA

    NA

    SBB (Lot 8)

    Install Casework / Millwork (Wet) – INT-L1

    NA

    NA

    SBB (Lot 8)

    Install Acoustical Ceiling Tile  – AUD

    NA

    NA

    SBB (Lot 8)

    Remove Dancefloor - AUD

    NA

    NA

    SBB (Lot 8) 

    Install Plumbing Fixtures – RR-L2

    NA

    NA

    SBB (Lot 8)

    Install AV Devics – INT-L2

    NA

    NA

    SBB (Lot 8)

    Install Casework / Millwork (Remaining) – INT-L2

    NA

    NA

    SBB (Lot 8) 

    Install Casework / Millwork (Wet) – INT-L2

    NA

    NA

    SBB (Lot 8)

    Install Carpet & Base – INT-L2

    NA

    NA

    SBB (Lot 8) 

    Install Tile – RR-L3

    NA

    NA

    SBB (Lot 8)

    Install Linoleum - INT-L3

    NA

    NA

    SBB (Lot 8) 

    Install Lockers – INT-L3

    NA

    NA

    SBB (Lot 8)

    Insall Casework / Millwork (Wet) – INT – L3

    NA

    NA

    SBB (Lot 8) 

    Install Tile – RR-L4

    NA

    NA

    SBB (Lot 8)

    Install Telecom Devices – INT-L4

    NA

    NA

    SBB (Lot 8)

    Install Electrical Cover Plates – INT-L4

    NA

    NA

    SBB (Lot 8)

    Install Security Devices– INT-L4

    NA

    NA

    SBB (Lot 8)

    Install Interior Glazing– INT-L4

    NA

    NA

    SBB (Lot 8)

    Install Acoustical Ceiling Tile– INT-L4

    NA

    NA

    SBB (Lot 8)

    Install Casework / Millwork (Wet) – INT-L4

    NA

    NA

    Anderson Park

    Install Irrigation – SITE-AP

    Heavy Equipment

    Noise

    Anderson Park

    Rough Grade / Cut Curbs – SITE-East & South

    Heavy Equipment

    Noise

    SBB Site (Lot 8)

    F/R/P Site Walls – SITE-N

    Heavy Equipment

    Noise

    SBB Site (Lot 8)

    Install Site Lighting Underground – SITE-E

    Heavy Equipment

    Noise

    SBB Site (Lot 8)

    F/R/P Curb & Gutter – SITE-S

    Heavy Equipment

    Noise

     

    Week of June 17, 2024

    Construction Activities

     

    Location

    Activity

    Equipment Used

    Anticipated Disturbance

    SBB (Lot 8) 

    Install Parapet Cap - RF

    NA

    NA

    SBB (Lot 8)

    Deck Edge Metal Panels at Windows – EXT-SW

    NA

    NA

    SBB (Lot 8)

    Install Window Shades – EXT-NE

    NA

    NA

    SBB (Lot 8) 

    Deck Edge Metal Panels at Windows – EXT-NE

    NA

    NA

    SBB (Lot 8)

    Curtain Wall - Frames & Glass – Manlift Leavout

    NA

    NA

    SBB (Lot 8)

    Install Window Shades – Manlift Leavout

    NA

    NA

    SBB (Lot 8)

    Install Tile – RR-L1

    NA

    NA

    SBB (Lot 8)

    Install Cafe Equipment 

    NA

    NA

    SBB (Lot 8)

    Install Lights and Egress Lighting – INT-L1

    NA

    NA

    SBB (Lot 8) 

    Install HVAC Grills & Diffusers – INT-L1

    NA

    NA

    SBB (Lot 8)

    Install Casework / Millwork (Wet) – INT-L1

    NA

    NA

    SBB (Lot 8)

    Final Overhead Inspections and Sign-off for Ceiling Tile – INT-L1

    NA

    NA

    SBB (Lot 8)

    Prime & Paint Walls – INT-AUD

    NA

    NA

    SBB (Lot 8)

    Toilet Partitions and Accessories – RR-L2

    NA

    NA

    SBB (Lot 8)

    Install Casework / Millwork (Remaining) – INT-L2

    NA

    NA

    SBB (Lot 8)

    Install Carpet & Base – INT-L2

    NA

    NA

    SBB (Lot 8) 

    Install Doors & Hardware – INT-L2

    NA

    NA

    SBB (Lot 8)

    Install Tile – RR-L3

    NA

    NA

    SBB (Lot 8)

    Install Plumbing Fixtures – RR-L3

    NA

    NA

    SBB (Lot 8)

    Install Linoleum Flooring – INT-L3

    NA

    NA

    SBB (Lot 8)

    Install Doors & Hardware – INT-L3

    NA

    NA

    SBB (Lot 8)

    Install AV Devices – INT-L3

    NA

    NA

    SBB (Lot 8)

    Install Tile – RR-L4

    NA

    NA

    SBB (Lot 8)

    Install Acoustical Ceiling Tile – INT-L4

    NA

    NA

    SBB (Lot 8)

    Install Casework / Millwork (Wet) – INT-L4

    NA

    NA

    SBB (Lot 8)

    Install Doors & Hardware – INT-L4

    NA

    NA

    Anderson Park

    Install landscaping – SITE-AP

    Heavy Equipment

    Noise

    SBB Site (Lot 8)

    F/R/P Site Walls – SITE-N

    Heavy Equipment

    Noise

    SBB Site (Lot 8)

    F/R/P Curbs – SITE-E

    Heavy Equipment

    Noise

    SBB Site (Lot 8)

    F/R/P Seat Wall – SITE-E

    Heavy Equipment

    Noise

    SBB Site (Lot 8)

    Backfill & LID Planter Install – SITE-S

    Heavy Equipment

    Noise

     

    Week of June 24, 2024

    Construction Activities 

     

    Location

    Activity

    Equipment Used

    Anticipated Disturbance

    SBB (Lot 8) 

    Install Permanent Roofing - RF

    NA

    NA

    SBB (Lot 8)

    Install Countertops – RR-L1

    NA

    NA

    SBB (Lot 8)

    Install Lights and Egress Lighting – INT-L1

    NA

    NA

    SBB (Lot 8) 

    Install HVAC Grills & Diffusers – INT-L1

    NA

    NA

    SBB (Lot 8)

    Install Fire Sprinkler Drops / Heads – INT-L1

    NA

    NA

    SBB (Lot 8)

    Install Fire Alarm Devices – INT-L1

    NA

    NA

    SBB (Lot 8)

    Wood Ceiling Hangers / Grid Supports – INT-L1

    NA

    NA

    SBB (Lot 8)

    Install Casework / Millwork (Wet) – INT-L1

    NA

    NA

    SBB (Lot 8)

    Install Fire Sprinkler Drops / Heads – INT-AUD

    NA

    NA

    SBB (Lot 8) 

    Install Fire Alarm Devices – INT-AUD

    NA

    NA

    SBB (Lot 8)

    Install Lights and Egress Lighting – INT-AUD

    NA

    NA

    SBB (Lot 8)

    Install HVAC Grills & Diffusers – INT-AUD

    NA

    NA

    SBB (Lot 8)

    Final Overhead Inspections and Sign-off for Ceiling Tile – INT-AUD

    NA

    NA

    SBB (Lot 8)

    Install Tile – RR-L2

    NA

    NA

    SBB (Lot 8)

    Wood Ceiling Hangers / Grid Supports – INT-L2

    NA

    NA

    SBB (Lot 8)

    Install Casework / Millwork (Remaining and Wet) – INT-L2

    NA

    NA

    SBB (Lot 8) 

    Install Carpet & Base – INT-L2

    NA

    NA

    SBB (Lot 8)

    Install AV Devices – INT-L2

    NA

    NA

    SBB (Lot 8)

    Install Tile – RR-L3

    NA

    NA

    SBB (Lot 8)

    Install Linoleum Flooring – INT-L3

    NA

    NA

    SBB (Lot 8)

    Install Lockers – INT-L3

    NA

    NA

    SBB (Lot 8)

    Install Casework / Millwork (Wet) – INT-L3

    NA

    NA

    SBB (Lot 8)

    Install Tile – RR-L4

    NA

    NA

    SBB (Lot 8)

    Install Telecom Devices – INT-L4

    NA

    NA

    SBB (Lot 8)

    Install Electrical Cover Plates – INT-L4

    NA

    NA

    SBB (Lot 8)

    Install Security Devices – INT-L4

    NA

    NA

    Anderson Park

    Install Interior Glazing – INT-L4

    NA

    NA

    SBB Site (Lot 8)

    Install Acoustical Ceiling Tile – INT-L4

    NA

    NA

    SBB Site (Lot 8)

    Install Casework / Millwork (Wet) – INT-L4

    NA

    NA

    SBB Site (Lot 8)

    Install Site Furnishings – SITE-AP

    Heavy Equipment

    Noise

    Anderson Park

    Install Irrigation Sleeves – SITE-N

    Heavy Equipment

    Noise

    SBB Site (Lot 8)

    Install Site Lighting Underground – SITE-N

    Heavy Equipment

    Noise

    SBB Site (Lot 8)

    Install Site Lighting Underground – SITE-E

    Heavy Equipment

    Noise

    SBB Site (Lot 8)

    Install Site Lighting Underground – SITE-S

    Heavy Equipment

    Noise

    SBB Site (Lot 8)

    F/R/P Curb & Gutter – SITE-S

    Heavy Equipment

    Noise

    SBB Site (Lot 8)

    Rough Grade / Cut Curbs – SITE-W

    Heavy Equipment

    Noise

    SBB Site (Lot 8)

    Install Irrigation Sleeves – SITE-W

    Heavy Equipment

    Noise

    SBB Site (Lot 8)

    Install Site Lighting Underground – SITE-W

    Heavy Equipment

    Noise

     

    Current and Upcoming Anticipated Closures

    The following shutdown(s)/ closures are anticipated as indicated below. Updates to this schedule will be released weekly in the Project Construction Advisories until the work is complete.  Please contact John Franklin with any specific questions or concerns at john.franklin@ucr.edu.

     

    Description

    Location

    Duration & Date

    Impacted Buildings/ Facilities

    Lot 8

    Lot 8

    Permanently 

    Lot 8

    Lot 43

    Lot 43

    Indefinitely 

    Lot 43

    South Campus Drive

    South Campus Drive

    6/17 – 7/19

    South Campus Drive Road Closure 

    Anderson Park

    Anderson Park

    Indefinitely

    Anderson Park

  • 950592 UCR SBB - Construction Alert #82

    Current Week

    Construction Activities

     

    Location

    Activity

    Equipment Used

    Anticipated Disturbance

    SBB (Lot 8) 

    Install Permanent Roofing – Low Roof

    NA

    NA

    SBB (Lot 8)

    Curtain Wall – Frames and Glass

    NA

    NA

    SBB (Lot 8)

    Precast Panels – EXT-L1

    NA

    NA

    SBB (Lot 8) 

    Set and Grout Thin Brick – Manlift Leavout

    NA

    NA

    SBB (Lot 8)

    Caulking – Manlift Leavout

    NA

    NA

    SBB (Lot 8)

    Remove Scaffold – Manlift Leavout

    NA

    NA

    SBB (Lot 8)

    Seal Concrete Floor – Café

    NA

    NA

    SBB (Lot 8)

    Install Lights and Egress Lighting – INT-L1

    NA

    NA

    SBB (Lot 8)

    Install HVAC Grills & Diffusers – INT-L1

    NA

    NA

    SBB (Lot 8) 

    Final Overhead Inspections and Sign-off for Ceiling Tile – INT-AUD

    NA

    NA

    SBB (Lot 8)

    Install Tile – RR-L2

    NA

    NA

    SBB (Lot 8)

    Install Countertops – RR-L3

    NA

    NA

    SBB (Lot 8)

    Install Interior Glazing – INT-L3

    NA

    NA

    SBB (Lot 8)

    Install Acoustical Ceiling Tile – INT-L3

    NA

    NA

    SBB (Lot 8)

    Prime & 1st Coat of Paint, Walls & Ceilings – RR-L4

    NA

    NA

    SBB (Lot 8)

    Install Countertops – RR-L4

    NA

    NA

    Anderson Park

    Install Site Furnishings – SITE-AP

    Heavy Equipment

    Noise

    Anderson Park

    Install Irrigation – SITE-AP

    Heavy Equipment

    Noise

    SBB (Lot 8)

    Rough Grade / Cut Curbs – SITE-East & South

    Heavy Equipment

    Noise

     

    Week of June 10, 2024

    Construction Activities

     

    Location

    Activity

    Equipment Used

    Anticipated Disturbance

    SBB (Lot 8) 

    Install Permanent Roofing - Roof

    NA

    NA

    SBB (Lot 8)

    Boardroom Curtain Wall – EXT-SW

    NA

    NA

    SBB (Lot 8)

    Install Window Shades – EXT-NE

    NA

    NA

    SBB (Lot 8) 

    Demo Manlift Pad and Grade

    NA

    NA

    SBB (Lot 8)

    Curtain Wall frames and Glass at Manlift Leave out

    NA

    NA

    SBB (Lot 8)

    Install Countertops – RR

    NA

    NA

    SBB (Lot 8)

    Install Tile – RR

    NA

    NA

    SBB (Lot 8)

    Install café Equipment 

    NA

    NA

    SBB (Lot 8)

    Install Lights and Egress Lighting – INT-L1

    NA

    NA

    SBB (Lot 8) 

    Install HVAC Grills & Diffusers  – INT-L1

    NA

    NA

    SBB (Lot 8)

    Install Fire Sprinkler Drops / Heads  – INT-L1

    NA

    NA

    SBB (Lot 8)

    Install Fire Alarm Devices  – INT-L1

    NA

    NA

    SBB (Lot 8)

    Wood Ceiling Hangers / Grid Supports  – INT-L1

    NA

    NA

    SBB (Lot 8)

    Install Casework / Millwork (Wet) – INT-L1

    NA

    NA

    SBB (Lot 8)

    Install Acoustical Ceiling Tile  – AUD

    NA

    NA

    SBB (Lot 8)

    Remove Dancefloor - AUD

    NA

    NA

    SBB (Lot 8) 

    Install Plumbing Fixtures – RR-L2

    NA

    NA

    SBB (Lot 8)

    Install AV Devics – INT-L2

    NA

    NA

    SBB (Lot 8)

    Install Casework / Millwork (Remaining) – INT-L2

    NA

    NA

    SBB (Lot 8) 

    Install Casework / Millwork (Wet) – INT-L2

    NA

    NA

    SBB (Lot 8)

    Install Carpet & Base – INT-L2

    NA

    NA

    SBB (Lot 8) 

    Install Tile – RR-L3

    NA

    NA

    SBB (Lot 8)

    Install Linoleum - INT-L3

    NA

    NA

    SBB (Lot 8) 

    Install Lockers – INT-L3

    NA

    NA

    SBB (Lot 8)

    Insall Casework / Millwork (Wet) – INT – L3

    NA

    NA

    SBB (Lot 8) 

    Install Tile – RR-L4

    NA

    NA

    SBB (Lot 8)

    Install Telecom Devices – INT-L4

    NA

    NA

    SBB (Lot 8)

    Install Electrical Cover Plates – INT-L4

    NA

    NA

    SBB (Lot 8)

    Install Security Devices– INT-L4

    NA

    NA

    SBB (Lot 8)

    Install Interior Glazing– INT-L4

    NA

    NA

    SBB (Lot 8)

    Install Acoustical Ceiling Tile– INT-L4

    NA

    NA

    SBB (Lot 8)

    Install Casework / Millwork (Wet) – INT-L4

    NA

    NA

    Anderson Park

    Install Irrigation – SITE-AP

    Heavy Equipment

    Noise

    Anderson Park

    Rough Grade / Cut Curbs – SITE-East & South

    Heavy Equipment

    Noise

    SBB Site (Lot 8)

    F/R/P Site Walls – SITE-N

    Heavy Equipment

    Noise

    SBB Site (Lot 8)

    Install Site Lighting Underground – SITE-E

    Heavy Equipment

    Noise

    SBB Site (Lot 8)

    F/R/P Curb & Gutter – SITE-S

    Heavy Equipment

    Noise

     

    Week of June 17, 2024

    Construction Activities 

     

    Location

    Activity

    Equipment Used

    Anticipated Disturbance

    SBB (Lot 8) 

    Install Parapet Cap - RF

    NA

    NA

    SBB (Lot 8)

    Deck Edge Metal Panels at Windows – EXT-SW

    NA

    NA

    SBB (Lot 8)

    Install Window Shades – EXT-NE

    NA

    NA

    SBB (Lot 8) 

    Deck Edge Metal Panels at Windows – EXT-NE

    NA

    NA

    SBB (Lot 8)

    Curtain Wall - Frames & Glass – Manlift Leavout

    NA

    NA

    SBB (Lot 8)

    Install Window Shades – Manlift Leavout

    NA

    NA

    SBB (Lot 8)

    Install Tile – RR-L1

    NA

    NA

    SBB (Lot 8)

    Install Cafe Equipment 

    NA

    NA

    SBB (Lot 8)

    Install Lights and Egress Lighting – INT-L1

    NA

    NA

    SBB (Lot 8) 

    Install HVAC Grills & Diffusers – INT-L1

    NA

    NA

    SBB (Lot 8)

    Install Casework / Millwork (Wet) – INT-L1

    NA

    NA

    SBB (Lot 8)

    Final Overhead Inspections and Sign-off for Ceiling Tile – INT-L1

    NA

    NA

    SBB (Lot 8)

    Prime & Paint Walls – INT-AUD

    NA

    NA

    SBB (Lot 8)

    Toilet Partitions and Accessories – RR-L2

    NA

    NA

    SBB (Lot 8)

    Install Casework / Millwork (Remaining) – INT-L2

    NA

    NA

    SBB (Lot 8)

    Install Carpet & Base – INT-L2

    NA

    NA

    SBB (Lot 8) 

    Install Doors & Hardware – INT-L2

    NA

    NA

    SBB (Lot 8)

    Install Tile – RR-L3

    NA

    NA

    SBB (Lot 8)

    Install Plumbing Fixtures – RR-L3

    NA

    NA

    SBB (Lot 8)

    Install Linoleum Flooring – INT-L3

    NA

    NA

    SBB (Lot 8)

    Install Doors & Hardware – INT-L3

    NA

    NA

    SBB (Lot 8)

    Install AV Devices – INT-L3

    NA

    NA

    SBB (Lot 8)

    Install Tile – RR-L4

    NA

    NA

    SBB (Lot 8)

    Install Acoustical Ceiling Tile – INT-L4

    NA

    NA

    SBB (Lot 8)

    Install Casework / Millwork (Wet) – INT-L4

    NA

    NA

    SBB (Lot 8)

    Install Doors & Hardware – INT-L4

    NA

    NA

    Anderson Park

    Install landscaping – SITE-AP

    Heavy Equipment

    Noise

    SBB Site (Lot 8)

    F/R/P Site Walls – SITE-N

    Heavy Equipment

    Noise

    SBB Site (Lot 8)

    F/R/P Curbs – SITE-E

    Heavy Equipment

    Noise

    SBB Site (Lot 8)

    F/R/P Seat Wall – SITE-E

    Heavy Equipment

    Noise

    SBB Site (Lot 8)

    Backfill & LID Planter Install – SITE-S

    Heavy Equipment

    Noise

     

    Current and Upcoming Anticipated Closures

    The following shutdown(s)/ closures are anticipated as indicated below. Updates to this schedule will be released weekly in the Project Construction Advisories until the work is complete.  Please contact John Franklin with any specific questions or concerns at john.franklin@ucr.edu.

     

    Description

    Location

    Duration & Date

    Impacted Buildings/ Facilities

    Lot 8

    Lot 8

    Permanently 

    Lot 8

    Lot 43

    Lot 43

    Indefinitely 

    Lot 43

    South Campus Drive

    South Campus Drive

    6/17 – 7/19

    South Campus Drive Road Closure 

    Anderson Park

    Anderson Park

    Indefinitely

    Anderson Park

  • 950592 UCR SBB - Construction Alert #81

    Current Week

    Construction Activities

     

    Location

    Activity

    Equipment Used

    Anticipated Disturbance

    SBB (Lot 8) 

    Precast Panels – EXT-L1

    NA

    NA

    SBB (Lot 8)

    Curtain Wall - Frames & Glass CW25-26, 28-31 (L3/L4) – EXT-NE

    NA

    NA

    SBB (Lot 8)

    Set & Grout Thin Brick – Manlift Leaveout

    NA

    NA

    SBB (Lot 8) 

    Prime & 1st Coat of Paint, Walls & Ceilings – RR-L1

    NA

    NA

    SBB (Lot 8)

    Install Acoustical Grid – INT-L1

    NA

    NA

    SBB (Lot 8)

    Prime & Paint Hardlids at Fixture Leaveout

    NA

    NA

    SBB (Lot 8)

    Install Fire Sprinkler Drops / Heads

    NA

    NA

    SBB (Lot 8)

    Install Fire Alarm Devices

    NA

    NA

    SBB (Lot 8)

    Install Lights and Egress Lighting

    NA

    NA

    SBB (Lot 8) 

    Install HVAC Grills & Diffusers

    NA

    NA

    SBB (Lot 8)

    Install Countertops – RR-L2

    NA

    NA

    SBB (Lot 8)

    Install Tile – RR-L2

    NA

    NA

    SBB (Lot 8)

    Prime & 1st Coat of Paint, Walls & Ceilings – RR-L3

    NA

    NA

    SBB (Lot 8)

    Install Telecom Devices – INT-L3

    NA

    NA

    SBB (Lot 8)

    Install Electrical Cover Plates – INT-L3

    NA

    NA

    SBB (Lot 8)

    Install Security Devices – INT-L3

    NA

    NA

    SBB (Lot 8)

    Install Interior Glazing – INT-L3

    NA

    NA

    SBB (Lot 8) 

    Install Acoustical Ceiling Tile – INT-L3

    NA

    NA

    SBB (Lot 8)

    Prime & Paint Hardlids at Fixture Leaveout – INT-L4

    NA

    NA

    SBB (Lot 8)

    Prime & 1st Coat of Paint, Walls & Ceilings – RR-L4

    NA

    NA

    Anderson Park

    Field Measure and Procure Handrail / Guardrail – SITE-AP

    NA

    NA

    Anderson Park

    Fine Grade Hardscape / Stairs – SITE-AP

    Heavy Equipment

    Noise

     

    Week of June 3, 2024

    Construction Activities

     

    Location

    Activity

    Equipment Used

    Anticipated Disturbance

    SBB (Lot 8) 

    Install Permanent Roofing – Low Roof

    NA

    NA

    SBB (Lot 8)

    Curtain Wall – Frames and Glass

    NA

    NA

    SBB (Lot 8)

    Precast Panels – EXT-L1

    NA

    NA

    SBB (Lot 8) 

    Set and Grout Thin Brick – Manlift Leavout

    NA

    NA

    SBB (Lot 8)

    Caulking – Manlift Leavout

    NA

    NA

    SBB (Lot 8)

    Remove Scaffold – Manlift Leavout

    NA

    NA

    SBB (Lot 8)

    Seal Concrete Floor – Café

    NA

    NA

    SBB (Lot 8)

    Install Lights and Egress Lighting – INT-L1

    NA

    NA

    SBB (Lot 8)

    Install HVAC Grills & Diffusers – INT-L1

    NA

    NA

    SBB (Lot 8) 

    Final Overhead Inspections and Sign-off for Ceiling Tile – INT-AUD

    NA

    NA

    SBB (Lot 8)

    Install Tile – RR-L2

    NA

    NA

    SBB (Lot 8)

    Install Countertops – RR-L3

    NA

    NA

    SBB (Lot 8)

    Install Interior Glazing – INT-L3

    NA

    NA

    SBB (Lot 8)

    Install Acoustical Ceiling Tile – INT-L3

    NA

    NA

    SBB (Lot 8)

    Prime & 1st Coat of Paint, Walls & Ceilings – RR-L4

    NA

    NA

    SBB (Lot 8)

    Install Countertops – RR-L4

    NA

    NA

    Anderson Park

    Install Site Furnishings – SITE-AP

    Heavy Equipment

    Noise

    Anderson Park

    Install Irrigation – SITE-AP

    Heavy Equipment

    Noise

    SBB (Lot 8)

    Rough Grade / Cut Curbs – SITE-East & South

    Heavy Equipment

    Noise

     

    Week of June 10, 2024

    Construction Activities 

     

    Location

    Activity

    Equipment Used

    Anticipated Disturbance

    SBB (Lot 8) 

    Install Permanent Roofing - Roof

    NA

    NA

    SBB (Lot 8)

    Boardroom Curtain Wall – EXT-SW

    NA

    NA

    SBB (Lot 8)

    Install Window Shades – EXT-NE

    NA

    NA

    SBB (Lot 8) 

    Demo Manlift Pad and Grade

    NA

    NA

    SBB (Lot 8)

    Curtain Wall frames and Glass at Manlift Leave out

    NA

    NA

    SBB (Lot 8)

    Install Countertops – RR

    NA

    NA

    SBB (Lot 8)

    Install Tile – RR

    NA

    NA

    SBB (Lot 8)

    Install café Equipment 

    NA

    NA

    SBB (Lot 8)

    Install Lights and Egress Lighting – INT-L1

    NA

    NA

    SBB (Lot 8) 

    Install HVAC Grills & Diffusers  – INT-L1

    NA

    NA

    SBB (Lot 8)

    Install Fire Sprinkler Drops / Heads  – INT-L1

    NA

    NA

    SBB (Lot 8)

    Install Fire Alarm Devices  – INT-L1

    NA

    NA

    SBB (Lot 8)

    Wood Ceiling Hangers / Grid Supports  – INT-L1

    NA

    NA

    SBB (Lot 8)

    Install Casework / Millwork (Wet) – INT-L1

    NA

    NA

    SBB (Lot 8)

    Install Acoustical Ceiling Tile  – AUD

    NA

    NA

    SBB (Lot 8)

    Remove Dancefloor - AUD

    NA

    NA

    SBB (Lot 8) 

    Install Plumbing Fixtures – RR-L2

    NA

    NA

    SBB (Lot 8)

    Install AV Devics – INT-L2

    NA

    NA

    SBB (Lot 8)

    Install Casework / Millwork (Remaining) – INT-L2

    NA

    NA

    SBB (Lot 8) 

    Install Casework / Millwork (Wet) – INT-L2

    NA

    NA

    SBB (Lot 8)

    Install Carpet & Base – INT-L2

    NA

    NA

    SBB (Lot 8) 

    Install Tile – RR-L3

    NA

    NA

    SBB (Lot 8)

    Install Linoleum - INT-L3

    NA

    NA

    SBB (Lot 8) 

    Install Lockers – INT-L3

    NA

    NA

    SBB (Lot 8)

    Insall Casework / Millwork (Wet) – INT – L3

    NA

    NA

    SBB (Lot 8) 

    Install Tile – RR-L4

    NA

    NA

    SBB (Lot 8)

    Install Telecom Devices – INT-L4

    NA

    NA

    SBB (Lot 8)

    Install Electrical Cover Plates – INT-L4

    NA

    NA

    SBB (Lot 8)

    Install Security Devices– INT-L4

    NA

    NA

    SBB (Lot 8)

    Install Interior Glazing– INT-L4

    NA

    NA

    SBB (Lot 8)

    Install Acoustical Ceiling Tile– INT-L4

    NA

    NA

    SBB (Lot 8)

    Install Casework / Millwork (Wet) – INT-L4

    NA

    NA

    Anderson Park

    Install Irrigation – SITE-AP

    Heavy Equipment

    Noise

    Anderson Park

    Rough Grade / Cut Curbs – SITE-East & South

    Heavy Equipment

    Noise

    SBB Site (Lot 8)

    F/R/P Site Walls – SITE-N

    Heavy Equipment

    Noise

    SBB Site (Lot 8)

    Install Site Lighting Underground – SITE-E

    Heavy Equipment

    Noise

    SBB Site (Lot 8)

    F/R/P Curb & Gutter – SITE-S

    Heavy Equipment

    Noise

     

    Current and Upcoming Anticipated Closures

    The following shutdown(s)/ closures are anticipated as indicated below. Updates to this schedule will be released weekly in the Project Construction Advisories until the work is complete.  Please contact John Franklin with any specific questions or concerns at john.franklin@ucr.edu.

     

    Description

    Location

    Duration & Date

    Impacted Buildings/ Facilities

    Lot 8

    Lot 8

    Permanently 

    Lot 8

    Lot 43

    Lot 43

    Indefinitely 

    Lot 43

    Anderson Park

    Anderson Park

    Indefinitely

    Anderson Park

     

  • 950592 UCR SBB - Construction Alert #80

    Current Week

    Construction Activities

     

    Location

    Activity

    Equipment Used

    Anticipated Disturbance

    SBB (Lot 8) 

    Install Parapet Cap - Roof

    NA

    NA

    SBB (Lot 8)

    Finish Coat Plaster – EXT-L1

    NA

    NA

    SBB (Lot 8)

    Remove Scaffold – EXT-L1

    NA

    NA

    SBB (Lot 8) 

    Remove Scaffold – EXT-NE

    NA

    NA

    SBB (Lot 8)

    Set & Grout Thin Brick – Manlift Leaveout

    NA

    NA

    SBB (Lot 8)

    Prime & 1st Coat of Paint, Walls, Hard lids & Exposed Ceilings – INT-L1

    NA

    NA

    SBB (Lot 8)

    Install Acoustical Grid – INT-AUD

    NA

    NA

    SBB (Lot 8)

    Wood Ceiling Hangers / Grid Supports – INT-L2

    NA

    NA

    SBB (Lot 8)

    Install Security Devices – INT-L2

    NA

    NA

    SBB (Lot 8)

    Prime & Paint Hardlids at Fixture Leaveout – INT-L3

    NA

    NA

    SBB (Lot 8)

    Final Overhead Inspections and Sign-off for Ceiling Tile – INT-L3

    NA

    NA

    SBB (Lot 8) 

    Tape Walls & Ceilings – RR-L4

    NA

    NA

    SBB (Lot 8)

    Install Lights and Egress Lighting – INT-L4

    NA

    NA

    Anderson Park

    F/R/P Hardscape – SITE-AP

    Heavy Equipment

    Noise

    Anderson Park

    Install Irrigation Sleeves – SITE-AP

    Heavy Equipment

    Noise

    Anderson Park

    Install Site Lighting Underground – SITE-AP

    Heavy Equipment

    Noise

     

    Week of May 27, 2024

    Construction Activities

     

    Location

    Activity

    Equipment Used

    Anticipated Disturbance

    SBB (Lot 8) 

    Precast Panels – EXT-L1

    NA

    NA

    SBB (Lot 8)

    Curtain Wall - Frames & Glass CW25-26, 28-31 (L3/L4) – EXT-NE

    NA

    NA

    SBB (Lot 8)

    Set & Grout Thin Brick – Manlift Leaveout

    NA

    NA

    SBB (Lot 8) 

    Prime & 1st Coat of Paint, Walls & Ceilings – RR-L1

    NA

    NA

    SBB (Lot 8)

    Install Acoustical Grid – INT-L1

    NA

    NA

    SBB (Lot 8)

    Prime & Paint Hardlids at Fixture Leaveout

    NA

    NA

    SBB (Lot 8)

    Install Fire Sprinkler Drops / Heads

    NA

    NA

    SBB (Lot 8)

    Install Fire Alarm Devices

    NA

    NA

    SBB (Lot 8)

    Install Lights and Egress Lighting

    NA

    NA

    SBB (Lot 8) 

    Install HVAC Grills & Diffusers

    NA

    NA

    SBB (Lot 8)

    Install Countertops – RR-L2

    NA

    NA

    SBB (Lot 8)

    Install Tile – RR-L2

    NA

    NA

    SBB (Lot 8)

    Prime & 1st Coat of Paint, Walls & Ceilings – RR-L3

    NA

    NA

    SBB (Lot 8)

    Install Telecom Devices – INT-L3

    NA

    NA

    SBB (Lot 8)

    Install Electrical Cover Plates – INT-L3

    NA

    NA

    SBB (Lot 8)

    Install Security Devices – INT-L3

    NA

    NA

    SBB (Lot 8)

    Install Interior Glazing – INT-L3

    NA

    NA

    SBB (Lot 8) 

    Install Acoustical Ceiling Tile – INT-L3

    NA

    NA

    SBB (Lot 8)

    Prime & Paint Hardlids at Fixture Leaveout – INT-L4

    NA

    NA

    SBB (Lot 8)

    Prime & 1st Coat of Paint, Walls & Ceilings – RR-L4

    NA

    NA

    Anderson Park

    Field Measure and Procure Handrail / Guardrail – SITE-AP

    NA

    NA

    Anderson Park

    Fine Grade Hardscape / Stairs – SITE-AP

    Heavy Equipment

    Noise

     

    Week of June 3, 2024

    Construction Activities 

     

    Location

    Activity

    Equipment Used

    Anticipated Disturbance

    SBB (Lot 8) 

    Install Permanent Roofing – Low Roof

    NA

    NA

    SBB (Lot 8)

    Curtain Wall – Frames and Glass

    NA

    NA

    SBB (Lot 8)

    Precast Panels – EXT-L1

    NA

    NA

    SBB (Lot 8) 

    Set and Grout Thin Brick – Manlift Leavout

    NA

    NA

    SBB (Lot 8)

    Caulking – Manlift Leavout

    NA

    NA

    SBB (Lot 8)

    Remove Scaffold – Manlift Leavout

    NA

    NA

    SBB (Lot 8)

    Seal Concrete Floor – Café

    NA

    NA

    SBB (Lot 8)

    Install Lights and Egress Lighting – INT-L1

    NA

    NA

    SBB (Lot 8)

    Install HVAC Grills & Diffusers – INT-L1

    NA

    NA

    SBB (Lot 8) 

    Final Overhead Inspections and Sign-off for Ceiling Tile – INT-AUD

    NA

    NA

    SBB (Lot 8)

    Install Tile – RR-L2

    NA

    NA

    SBB (Lot 8)

    Install Countertops – RR-L3

    NA

    NA

    SBB (Lot 8)

    Install Interior Glazing – INT-L3

    NA

    NA

    SBB (Lot 8)

    Install Acoustical Ceiling Tile – INT-L3

    NA

    NA

    SBB (Lot 8)

    Prime & 1st Coat of Paint, Walls & Ceilings – RR-L4

    NA

    NA

    SBB (Lot 8)

    Install Countertops – RR-L4

    NA

    NA

    Anderson Park

    Install Site Furnishings – SITE-AP

    Heavy Equipment

    Noise

    Anderson Park

    Install Irrigation – SITE-AP

    Heavy Equipment

    Noise

    SBB (Lot 8)

    Rough Grade / Cut Curbs – SITE-East & South

    Heavy Equipment

    Noise

     

    Current and Upcoming Anticipated Closures

    The following shutdown(s)/ closures are anticipated as indicated below. Updates to this schedule will be released weekly in the Project Construction Advisories until the work is complete.  Please contact John Franklin with any specific questions or concerns at john.franklin@ucr.edu.

     

    Description

    Location

    Duration & Date

    Impacted Buildings/ Facilities

    Lot 8

    Lot 8

    Permanently 

    Lot 8

    Lot 43

    Lot 43

    Indefinitely 

    Lot 43

    Anderson Park

    Anderson Park

    Indefinitely

    Anderson Park

  • 950592 UCR SBB - Construction Alert #79

    Current Week

    Construction Activities

     

    Location

    Activity

    Equipment Used

    Anticipated Disturbance

    SBB (Lot 8) 

    Install Roofing System - North of E Line

    NA

    NA

    SBB (Lot 8)

    Metal Panels at Stairs - EXT-SW

    NA

    NA

    SBB (Lot 8)

    Remove Scaffold - EXT-SW

    NA

    NA

    SBB (Lot 8) 

    Curtain Wall - Frames & Glass CW8-11, 12-15, 1-3 (L2/L1) - EXT-SW

    NA

    NA

    SBB (Lot 8)

    Scratch Coat Plaster – EXT-L1

    NA

    NA

    SBB (Lot 8)

    Brown Coat Plaster – EXT-L1

    NA

    NA

    SBB (Lot 8)

    Set & Grout Thin Brick – EXT-NE

    NA

    NA

    SBB (Lot 8)

    Caulking – EXT-NE

    NA

    NA

    SBB (Lot 8)

    Metal Panels at Stairs – EXT-NE

    NA

    NA

    SBB (Lot 8)

    Cement Board – Manlift Leavout

    NA

    NA

    SBB (Lot 8)

    Secondary Air Barrier – Manlift Leavout

    NA

    NA

    SBB (Lot 8) 

    Punched Openings – Manlift Leavout

    NA

    NA

    SBB (Lot 8)

    Tape Walls Soffits & Hard lids – INT-L1

    NA

    NA

    SBB (Lot 8) 

    Tape Walls & Ceilings – RR-L1

    NA

    NA

    SBB (Lot 8)

    Hang, Tape & Finish Drywall at Hardlid Fixture Leaveouts – INT-AUD

    NA

    NA

    SBB (Lot 8)

    Prime & Paint Hardlids at Fixture Leaveout – INT-L2

    NA

    NA

    SBB (Lot 8)

    Tape Walls & Ceilings – RR-L2

    NA

    NA

    SBB (Lot 8)

    Prime & 1st Coat of Paint, Walls & Ceilings – RR-L2

    NA

    NA

    SBB (Lot 8)

    Erect Dancefloor – INT-L2

    NA

    NA

    SBB (Lot 8)

    Overhead MEPF – INT-L2

    NA

    NA

    SBB (Lot 8)

    Final Overhead Inspections and Sign-off for Ceiling Tile – INT-L2

    NA

    NA

    SBB (Lot 8)

    Install Telecom Devices – INT-L2

    NA

    NA

    SBB (Lot 8) 

    Install Electrical Cover Plates – INT-L2

    NA

    NA

    SBB (Lot 8)

    Install Interior Glazing – INT-L2

    NA

    NA

    SBB (Lot 8) 

    Install Acoustical Ceiling Tile – INT-L2

    NA

    NA

    SBB (Lot 8)

    Hang, Tape & Finish Drywall at Hardlid Fixture Leaveouts – INT-L3

    NA

    NA

    SBB (Lot 8)

    Hang Drywall & Inspect – RR-L3

    NA

    NA

    SBB (Lot 8)

    Tape Walls & Ceilings – RR-L3

    NA

    NA

    SBB (Lot 8)

    Install Lights and Egress Lighting– INT-L3

    NA

    NA

    SBB (Lot 8)

    Install HVAC Grills & Diffusers– INT-L3

    NA

    NA

    SBB (Lot 8)

    Install Fire Sprinkler Drops / Heads– INT-L3

    NA

    NA

    SBB (Lot 8)

    Install Fire Alarm Devices – INT-L3

    NA

    NA

    SBB (Lot 8)

    Pull Electrical– INT-L4

    NA

    NA

    SBB (Lot 8)

    Hang, Tape & Finish Drywall at Hardlid Fixture Leaveouts– INT-L4

    NA

    NA

    SBB (Lot 8)

    Hang Drywall & Inspect – RR-L4

    NA

    NA

    SBB (Lot 8) 

    Prime & 1st Coat of Paint, Walls, Hard lids & Exposed Ceilings – INT-L4

    NA

    NA

    SBB (Lot 8)

    Install Acoustical Grid – INT-L4

    NA

    NA

    Anderson Park

    Fine Grade – SITE-AP

    Heavy Equipment

    Noise

    Anderson Park

    Rough Grade / Cut Curbs – SITE-N

    Heavy Equipment

    Noise

     

    Week of May 20, 2024

    Construction Activities

     

    Location

    Activity

    Equipment Used

    Anticipated Disturbance

    SBB (Lot 8) 

    Install Parapet Cap - Roof

    NA

    NA

    SBB (Lot 8)

    Finish Coat Plaster – EXT-L1

    NA

    NA

    SBB (Lot 8)

    Remove Scaffold – EXT-L1

    NA

    NA

    SBB (Lot 8) 

    Remove Scaffold – EXT-NE

    NA

    NA

    SBB (Lot 8)

    Set & Grout Thin Brick – Manlift Leaveout

    NA

    NA

    SBB (Lot 8)

    Prime & 1st Coat of Paint, Walls, Hard lids & Exposed Ceilings – INT-L1

    NA

    NA

    SBB (Lot 8)

    Install Acoustical Grid – INT-AUD

    NA

    NA

    SBB (Lot 8)

    Wood Ceiling Hangers / Grid Supports – INT-L2

    NA

    NA

    SBB (Lot 8)

    Install Security Devices – INT-L2

    NA

    NA

    SBB (Lot 8)

    Prime & Paint Hardlids at Fixture Leaveout – INT-L3

    NA

    NA

    SBB (Lot 8)

    Final Overhead Inspections and Sign-off for Ceiling Tile – INT-L3

    NA

    NA

    SBB (Lot 8) 

    Tape Walls & Ceilings – RR-L4

    NA

    NA

    SBB (Lot 8)

    Install Lights and Egress Lighting – INT-L4

    NA

    NA

    Anderson Park

    F/R/P Hardscape – SITE-AP

    Heavy Equipment

    Noise

    Anderson Park

    Install Irrigation Sleeves – SITE-AP

    Heavy Equipment

    Noise

    Anderson Park

    Install Site Lighting Underground – SITE-AP

    Heavy Equipment

    Noise

     

    Week of May 27, 2024

    Construction Activities 

     

    Location

    Activity

    Equipment Used

    Anticipated Disturbance

    SBB (Lot 8) 

    Precast Panels – EXT-L1

    NA

    NA

    SBB (Lot 8)

    Curtain Wall - Frames & Glass CW25-26, 28-31 (L3/L4) – EXT-NE

    NA

    NA

    SBB (Lot 8)

    Set & Grout Thin Brick – Manlift Leaveout

    NA

    NA

    SBB (Lot 8) 

    Prime & 1st Coat of Paint, Walls & Ceilings – RR-L1

    NA

    NA

    SBB (Lot 8)

    Install Acoustical Grid – INT-L1

    NA

    NA

    SBB (Lot 8)

    Prime & Paint Hardlids at Fixture Leaveout

    NA

    NA

    SBB (Lot 8)

    Install Fire Sprinkler Drops / Heads

    NA

    NA

    SBB (Lot 8)

    Install Fire Alarm Devices

    NA

    NA

    SBB (Lot 8)

    Install Lights and Egress Lighting

    NA

    NA

    SBB (Lot 8) 

    Install HVAC Grills & Diffusers

    NA

    NA

    SBB (Lot 8)

    Install Countertops – RR-L2

    NA

    NA

    SBB (Lot 8)

    Install Tile – RR-L2

    NA

    NA

    SBB (Lot 8)

    Prime & 1st Coat of Paint, Walls & Ceilings – RR-L3

    NA

    NA

    SBB (Lot 8)

    Install Telecom Devices – INT-L3

    NA

    NA

    SBB (Lot 8)

    Install Electrical Cover Plates – INT-L3

    NA

    NA

    SBB (Lot 8)

    Install Security Devices – INT-L3

    NA

    NA

    SBB (Lot 8)

    Install Interior Glazing – INT-L3

    NA

    NA

    SBB (Lot 8) 

    Install Acoustical Ceiling Tile – INT-L3

    NA

    NA

    SBB (Lot 8)

    Prime & Paint Hardlids at Fixture Leaveout – INT-L4

    NA

    NA

    SBB (Lot 8)

    Prime & 1st Coat of Paint, Walls & Ceilings – RR-L4

    NA

    NA

    Anderson Park

    Field Measure and Procure Handrail / Guardrail – SITE-AP

    Heavy Equipment

    Noise

    Anderson Park

    Fine Grade Hardscape / Stairs – SITE-AP

    Heavy Equipment

    Noise

     

    Current and Upcoming Anticipated Closures

    The following shutdown(s)/ closures are anticipated as indicated below. Updates to this schedule will be released weekly in the Project Construction Advisories until the work is complete.  Please contact John Franklin with any specific questions or concerns at john.franklin@ucr.edu.

     

    Description

    Location

    Duration & Date

    Impacted Buildings/ Facilities

    Lot 8

    Lot 8

    Permanently 

    Lot 8

    Lot 43

    Lot 43

    Indefinitely 

    Lot 43

    Anderson Park

    Anderson Park

    Indefinitely

    Anderson Park

  • 950592 UCR SBB - Construction Alert #78

    Current Week

    Construction Activities

     

    Location

    Activity

    Equipment Used

    Anticipated Disturbance

    SBB (Lot 8) 

    Set & Grout Thin Brick – EXT-SW

    NA

    NA

    SBB (Lot 8)

    Curtain Wall - Frames & Glass – EXT-SW

    NA

    NA

    SBB (Lot 8)

    Lath & Trims – EXT-L1

    NA

    NA

    SBB (Lot 8) 

    Curtain Wall - Frames & Glass – EXT-NE

    NA

    NA

    SBB (Lot 8)

    Set & Grout Thin Brick – EXT-NE

    NA

    NA

    SBB (Lot 8)

    Install Communications Racks/Equipment – ELEC-L1

    NA

    NA

    SBB (Lot 8)

    Tape Walls Soffits & Hard lids – INT-L1

    NA

    NA

    SBB (Lot 8)

    Hang Drywall & Inspect – RR-L1

    NA

    NA

    SBB (Lot 8)

    Tape Walls – INT-AUD

    NA

    NA

    SBB (Lot 8)

    Install Lights and Egress Lighting – INT-L2

    NA

    NA

    SBB (Lot 8)

    Install HVAC Grills & Diffusers – INT-L2

    NA

    NA

    SBB (Lot 8) 

    Prime & Paint Hardlids at Fixture Leave out – INT-L3

    NA

    NA

    SBB (Lot 8)

    Hang Drywall & Inspect – RR-L3

    NA

    NA

    SBB (Lot 8) 

    Tape Walls Soffits & Hard lids – INT-L4

    NA

    NA

    SBB (Lot 8)

    Schedule State Elevator Inspection – ELEV

    NA

    NA

    Anderson Park

    F/R/P Site Walls - Loading Dock – SITE AP

    Heavy Equipment

    Noise

     

    Week of May 13, 2024

    Construction Activities

     

    Location

    Activity

    Equipment Used

    Anticipated Disturbance

    SBB (Lot 8) 

    Caulking – EXT-SW

    NA

    NA

    SBB (Lot 8)

    Curtain Wall - Frames & Glass – EXT-SW

    NA

    NA

    SBB (Lot 8)

    Set & Grout Thin Brick – EXT-NE

    NA

    NA

    SBB (Lot 8) 

    Tape Walls & Ceilings – RR-L1

    NA

    NA

    SBB (Lot 8)

    Prime & Paint Hardlids at Fixture Leaveout – INT-L2

    NA

    NA

    SBB (Lot 8)

    Install Interior Glazing – INT-L2

    NA

    NA

    SBB (Lot 8)

    Prime & Paint Hardlids at Fixture Leaveout – INT-L3

    NA

    NA

    SBB (Lot 8)

    Hang Drywall & Inspect – RR-L3

    NA

    NA

    SBB (Lot 8)

    Install Lights and Egress Lighting – INT-L3

    NA

    NA

    SBB (Lot 8)

    Install HVAC Grills & Diffusers – INT-L3

    NA

    NA

    SBB (Lot 8)

    Install Fire Sprinkler Drops / Heads – INT-L3

    NA

    NA

    SBB (Lot 8) 

    Install Fire Alarm Devices – INT-L3

    NA

    NA

    SBB (Lot 8)

    Prime & 1st Coat of Paint, Walls, Hard lids & Exposed Ceilings– INT-L4

    NA

    NA

    Anderson Park

    F/R/P Hardscape

    Heavy Equipment

    Noise

    Anderson Park

    F/R/P Site Walls - Amphitheater

    Heavy Equipment

    Noise

     

    Week of May 20, 2024

    Construction Activities 

     

    Location

    Activity

    Equipment Used

    Anticipated Disturbance

    SBB (Lot 8) 

    Caulking – EXT-SW

    NA

    NA

    SBB (Lot 8)

    Curtain Wall - Frames & Glass – EXT-SW

    NA

    NA

    SBB (Lot 8)

    Set & Grout Thin Brick – EXT-NE

    NA

    NA

    SBB (Lot 8) 

    Install Communications Racks/Equipment – ELEC-L1

    NA

    NA

    SBB (Lot 8)

    Install Interior Glazing – INT-L2

    NA

    NA

    SBB (Lot 8)

    Install Lights and Egress Lighting – INT-L3

    NA

    NA

    SBB (Lot 8)

    Install HVAC Grills & Diffusers – INT-L3

    NA

    NA

    SBB (Lot 8)

    Schedule State Elevator Inspection - ELEV

    NA

    NA

    Anderson Park

    F/R/P Hardscape

    Heavy Equipment

    Noise

    Anderson Park

    F/R/P Site Walls - Amphitheater

    Heavy Equipment

    Noise

     

    Current and Upcoming Anticipated Closures

    The following shutdown(s)/ closures are anticipated as indicated below. Updates to this schedule will be released weekly in the Project Construction Advisories until the work is complete.  Please contact John Franklin with any specific questions or concerns at john.franklin@ucr.edu.

     

    Description

    Location

    Duration & Date

    Impacted Buildings/ Facilities

    Lot 8

    Lot 8

    Permanently 

    Lot 8

    Lot 43

    Lot 43

    Indefinitely 

    Lot 43

    Anderson Park

    Anderson Park

    Indefinitely

    Anderson Park

  • 950592 UCR SBB - Construction Alert #77

    Current Week

    Construction Activities

     

    Location

    Activity

    Equipment Used

    Anticipated Disturbance

    SBB (Lot 8) 

    Caulking – EXT-L1

    NA

    NA

    SBB (Lot 8)

    Remove Scaffold – EXT-L1 

    NA

    NA

    SBB (Lot 8)

    Metal Panels – North of F Line EXT-NE

    NA

    NA

    SBB (Lot 8) 

    Caulking – EXT-SW

    NA

    NA

    SBB (Lot 8)

    Exterior Framing – Manlift Layout

    NA

    NA

    SBB (Lot 8)

    Rigid Insulation and Air Water Barrier – Manlift Layout

    NA

    NA

    SBB (Lot 8)

    Tape Walls Soffits & Hard lids – INT-L1

    NA

    NA

    SBB (Lot 8)

    Hang Drywall & Inspect – RR-L1

    NA

    NA

    SBB (Lot 8)

    Tape Walls & Ceilings – RR-L1

    NA

    NA

    SBB (Lot 8)

    Install Roll Up Door - CAFE

    NA

    NA

    SBB (Lot 8)

    Prime & 1st Coat of Paint, Walls, Hard lids & Exposed Ceilings – INT-L1

    NA

    NA

    SBB (Lot 8) 

    Install Acoustical Grid – INT-AUD

    NA

    NA

    SBB (Lot 8)

    Install Fire Sprinkler Drops / Heads – INT-AUD

    NA

    NA

    SBB (Lot 8) 

    Install Fire Alarm Devices – INT-AUD

    NA

    NA

    SBB (Lot 8)

    Install Lights and Egress Lighting – INT-AUD

    NA

    NA

    SBB (Lot 8)

    Install HVAC Grills & Diffusers – INT-AUD

    NA

    NA

    SBB (Lot 8) 

    Hang Drywall & Inspect – RR-L2

    NA

    NA

    SBB (Lot 8)

    Tape Walls & Ceilings – RR-L2

    NA

    NA

    SBB (Lot 8)

    Install HVAC Grills & Diffusers – INT-L2

    NA

    NA

    SBB (Lot 8)

    Install Fire Sprinkler Drops / Heads – INT-L2

    NA

    NA

    SBB (Lot 8)

    Install Fire Alarm Devices – INT-L2

    NA

    NA

    SBB (Lot 8)

    Install Lights and Egress Lighting – INT-L2

    NA

    NA

    SBB (Lot 8)

    Tape Walls & Ceilings – RR-L3

    NA

    NA

    SBB (Lot 8)

    Install Acoustical Grid – INT-L3

    NA

    NA

    SBB (Lot 8)

    Install Cable Tray – INT-L4

    NA

    NA

    SBB (Lot 8)

    Tape Walls Soffits & Hard lids – INT-L4

    NA

    NA

    SBB (Lot 8) 

    Pull Low Voltage Cable – INT-L4

    NA

    NA

    SBB (Lot 8)

    Tap Walls and Ceilings – RR-L4

    NA

    NA

    Anderson Park

    F/R/P Hardscape – Site-AP

    Heavy Equipment

    Noise

    SBB (Lot 8)

    Install Irrigation Sleeves – Site-N

    NA

    NA

    SBB (Lot 8)

    Install Site Lighting Underground – Site-N

    NA

    NA

    SBB (Lot 8)

    Tie-in Chilled Water to Campus Loop

    NA

    NA

    SBB (Lot 8) 

    Startup/Test Refrigerant Alarm System

    NA

    NA

     

    Week of May 6, 2024

    Construction Activities

     

    Location

    Activity

    Equipment Used

    Anticipated Disturbance

    SBB (Lot 8) 

    Set & Grout Thin Brick – EXT-SW

    NA

    NA

    SBB (Lot 8)

    Curtain Wall - Frames & Glass – EXT-SW

    NA

    NA

    SBB (Lot 8)

    Lath & Trims – EXT-L1

    NA

    NA

    SBB (Lot 8) 

    Curtain Wall - Frames & Glass – EXT-NE

    NA

    NA

    SBB (Lot 8)

    Set & Grout Thin Brick – EXT-NE

    NA

    NA

    SBB (Lot 8)

    Install Communications Racks/Equipment – ELEC-L1

    NA

    NA

    SBB (Lot 8)

    Tape Walls Soffits & Hard lids – INT-L1

    NA

    NA

    SBB (Lot 8)

    Hang Drywall & Inspect – RR-L1

    NA

    NA

    SBB (Lot 8)

    Tape Walls – INT-AUD

    NA

    NA

    SBB (Lot 8)

    Install Lights and Egress Lighting – INT-L2

    NA

    NA

    SBB (Lot 8)

    Install HVAC Grills & Diffusers – INT-L2

    NA

    NA

    SBB (Lot 8) 

    Prime & Paint Hardlids at Fixture Leave out – INT-L3

    NA

    NA

    SBB (Lot 8)

    Hang Drywall & Inspect – RR-L3

    NA

    NA

    SBB (Lot 8) 

    Tape Walls Soffits & Hard lids – INT-L4

    NA

    NA

    SBB (Lot 8)

    Schedule State Elevator Inspection – ELEV

    NA

    NA

    Anderson Park

    F/R/P Site Walls - Loading Dock – SITE AP

    Heavy Equipment

    Noise

     

    Week of May 13, 2024

    Construction Activities 

     

    Location

    Activity

    Equipment Used

    Anticipated Disturbance

    SBB (Lot 8) 

    Caulking – EXT-SW

    NA

    NA

    SBB (Lot 8)

    Curtain Wall - Frames & Glass – EXT-SW

    NA

    NA

    SBB (Lot 8)

    Set & Grout Thin Brick – EXT-NE

    NA

    NA

    SBB (Lot 8) 

    Tape Walls & Ceilings – RR-L1

    NA

    NA

    SBB (Lot 8)

    Prime & Paint Hardlids at Fixture Leaveout – INT-L2

    NA

    NA

    SBB (Lot 8)

    Install Interior Glazing – INT-L2

    NA

    NA

    SBB (Lot 8)

    Prime & Paint Hardlids at Fixture Leaveout – INT-L3

    NA

    NA

    SBB (Lot 8)

    Hang Drywall & Inspect – RR-L3

    NA

    NA

    SBB (Lot 8)

    Install Lights and Egress Lighting – INT-L3

    NA

    NA

    SBB (Lot 8)

    Install HVAC Grills & Diffusers – INT-L3

    NA

    NA

    SBB (Lot 8)

    Install Fire Sprinkler Drops / Heads – INT-L3

    NA

    NA

    SBB (Lot 8) 

    Install Fire Alarm Devices – INT-L3

    NA

    NA

    SBB (Lot 8)

    Prime & 1st Coat of Paint, Walls, Hard lids & Exposed Ceilings– INT-L4

    NA

    NA

    Anderson Park

    F/R/P Hardscape

    Heavy Equipment

    Noise

    Anderson Park

    F/R/P Site Walls - Amphitheater

    Heavy Equipment

    Noise

     

    Current and Upcoming Anticipated Closures

    The following shutdown(s)/ closures are anticipated as indicated below. Updates to this schedule will be released weekly in the Project Construction Advisories until the work is complete.  Please contact John Franklin with any specific questions or concerns at john.franklin@ucr.edu.

     

    Description

    Location

    Duration & Date

    Impacted Buildings/ Facilities

    Lot 8

    Lot 8

    Permanently 

    Lot 8

    Lot 43

    Lot 43

    Indefinitely 

    Lot 43

    Anderson Park

    Anderson Park

    Indefinitely

    Anderson Park

  • 950592 UCR SBB - Construction Alert #76

    Current Week

    Construction Activities

     

    Location

    Activity

    Equipment Used

    Anticipated Disturbance

    SBB (Lot 8) 

     

    Metal Panels – EXT-L1

    NA

    NA

    SBB (Lot 8) 

    Punched Openings – Glass – EXT-NE

    NA

    NA

    SBB (Lot 8) 

    Curtain Wall – Glass – EXT-NE

    NA

    NA

    SBB (Lot 8)

    Grout Thin Brick – EXT-NE

    NA

    NA

    SBB (Lot 8)

    Tape Walls Soffits & Hard lids – INT-L1

    NA

    NA

    SBB (Lot 8) 

    Install Roll Up Door - Cafe

    NA

    NA

    SBB (Lot 8)

    Install Acoustical Grid – INT-AUD

    NA

    NA

    SBB (Lot 8)

    Install Backing – RR-L2

    NA

    NA

    SBB (Lot 8)

    Install Backing – RR-L3

    NA

    NA

    SBB (Lot 8)

    Install Backing – RR-L4

    NA

    NA

    SBB (Lot 8)

    Install Acoustical Grid – INT-L2

    NA

    NA

    SBB (Lot 8)

    Tape Walls Soffits & Hard lids – INT-L3

    NA

    NA

    SBB (Lot 8)

    Install Ductwork Insulation – INT-L4

    NA

    NA

    SBB (Lot 8) 

    Hang 2nd Side Drywall & Inspect – INT-L4

    NA

    NA

    SBB (Lot 8)

    Remove Protection & Install Finishes - ELEV

    NA

    NA

    Anderson Park

    Backfill Planters – SITE-AP

    Heavy Equipment

    Noise

    Anderson Park

    F/R/P Seat Benches

    Heavy Equipment

    Noise

     

    Week of April 29, 2024

    Construction Activities

     

    Location

    Activity

    Equipment Used

    Anticipated Disturbance

    SBB (Lot 8) 

    Caulking – EXT-L1

    NA

    NA

    SBB (Lot 8)

    Remove Scaffold – EXT-L1 

    NA

    NA

    SBB (Lot 8)

    Metal Panels – North of F Line EXT-NE

    NA

    NA

    SBB (Lot 8) 

    Caulking – EXT-SW

    NA

    NA

    SBB (Lot 8)

    Exterior Framing – Manlift Layout

    NA

    NA

    SBB (Lot 8)

    Rigid Insulation and Air Water Barrier – Manlift Layout

    NA

    NA

    SBB (Lot 8)

    Tape Walls Soffits & Hard lids – INT-L1

    NA

    NA

    SBB (Lot 8)

    Hang Drywall & Inspect – RR-L1

    NA

    NA

    SBB (Lot 8)

    Tape Walls & Ceilings – RR-L1

    NA

    NA

    SBB (Lot 8)

    Install Roll Up Door - CAFE

    NA

    NA

    SBB (Lot 8)

    Prime & 1st Coat of Paint, Walls, Hard lids & Exposed Ceilings – INT-L1

    NA

    NA

    SBB (Lot 8) 

    Install Acoustical Grid – INT-AUD

    NA

    NA

    SBB (Lot 8)

    Install Fire Sprinkler Drops / Heads – INT-AUD

    NA

    NA

    SBB (Lot 8) 

    Install Fire Alarm Devices – INT-AUD

    NA

    NA

    SBB (Lot 8)

    Install Lights and Egress Lighting – INT-AUD

    NA

    NA

    SBB (Lot 8)

    Install HVAC Grills & Diffusers – INT-AUD

    NA

    NA

    SBB (Lot 8) 

    Hang Drywall & Inspect – RR-L2

    NA

    NA

    SBB (Lot 8)

    Tape Walls & Ceilings – RR-L2

    NA

    NA

    SBB (Lot 8)

    Install HVAC Grills & Diffusers – INT-L2

    NA

    NA

    SBB (Lot 8)

    Install Fire Sprinkler Drops / Heads – INT-L2

    NA

    NA

    SBB (Lot 8)

    Install Fire Alarm Devices – INT-L2

    NA

    NA

    SBB (Lot 8)

    Install Lights and Egress Lighting – INT-L2

    NA

    NA

    SBB (Lot 8)

    Tape Walls & Ceilings – RR-L3

    NA

    NA

    SBB (Lot 8)

    Install Acoustical Grid – INT-L3

    NA

    NA

    SBB (Lot 8)

    Install Cable Tray – INT-L4

    NA

    NA

    SBB (Lot 8)

    Tape Walls Soffits & Hard lids – INT-L4

    NA

    NA

    SBB (Lot 8) 

    Pull Low Voltage Cable – INT-L4

    NA

    NA

    SBB (Lot 8)

    Tap Walls and Ceilings – RR-L4

    NA

    NA

    Anderson Park

    F/R/P Hardscape – Site-AP

    Heavy Equipment

    Noise

    SBB (Lot 8)

    Install Irrigation Sleeves – Site-N

    NA

    NA

    SBB (Lot 8)

    Install Site Lighting Underground – Site-N

    NA

    NA

    SBB (Lot 8)

    Tie-in Chilled Water to Campus Loop

    NA

    NA

    SBB (Lot 8) 

    Startup/Test Refrigerant Alarm System

    NA

    NA

     

    Week of May 6, 2024

    Construction Activities 

     

    Location

    Activity

    Equipment Used

    Anticipated Disturbance

    SBB (Lot 8) 

    Set & Grout Thin Brick – EXT-SW

    NA

    NA

    SBB (Lot 8)

    Curtain Wall - Frames & Glass – EXT-SW

    NA

    NA

    SBB (Lot 8)

    Lath & Trims – EXT-L1

    NA

    NA

    SBB (Lot 8) 

    Curtain Wall - Frames & Glass – EXT-NE

    NA

    NA

    SBB (Lot 8)

    Set & Grout Thin Brick – EXT-NE

    NA

    NA

    SBB (Lot 8)

    Install Communications Racks/Equipment – ELEC-L1

    NA

    NA

    SBB (Lot 8)

    Tape Walls Soffits & Hard lids – INT-L1

    NA

    NA

    SBB (Lot 8)

    Hang Drywall & Inspect – RR-L1

    NA

    NA

    SBB (Lot 8)

    Tape Walls – INT-AUD

    NA

    NA

    SBB (Lot 8)

    Install Lights and Egress Lighting – INT-L2

    NA

    NA

    SBB (Lot 8)

    Install HVAC Grills & Diffusers – INT-L2

    NA

    NA

    SBB (Lot 8) 

    Prime & Paint Hardlids at Fixture Leave out – INT-L3

    NA

    NA

    SBB (Lot 8)

    Hang Drywall & Inspect – RR-L3

    NA

    NA

    SBB (Lot 8) 

    Tape Walls Soffits & Hard lids – INT-L4

    NA

    NA

    SBB (Lot 8)

    Schedule State Elevator Inspection – ELEV

    NA

    NA

    Anderson Park

    F/R/P Site Walls - Loading Dock – SITE AP

    Heavy Equipment

    Noise

     

    Current and Upcoming Anticipated Closures

    The following shutdown(s)/ closures are anticipated as indicated below. Updates to this schedule will be released weekly in the Project Construction Advisories until the work is complete.  Please contact John Franklin with any specific questions or concerns at john.franklin@ucr.edu.

     

    Description

    Location

    Duration & Date

    Impacted Buildings/ Facilities

    Lot 8

    Lot 8

    Permanently 

    Lot 8

    Lot 43

    Lot 43

    Indefinitely 

    Lot 43

    Anderson Park

    Anderson Park

    Indefinitely

    Anderson Park

     

  • 950592 UCR SBB - Construction Alert #75

    Current Week

    Construction Activities

     

    Location

    Activity

    Equipment Used

    Anticipated Disturbance

    SBB (Lot 8) 

    Install Roofing System - North of E Line

    NA

    NA

    SBB (Lot 8) 

    Caulking – EXT-SW

    NA

    NA

    SBB (Lot 8) 

    Set & Grout Thin Brick – EXT-SW

    NA

    NA

    SBB (Lot 8)

    Punched Openings - Frames & Glass – EXT-SW

    NA

    NA

    SBB (Lot 8)

    Curtain Wall - Frames & Glass – EXT-SW

    NA

    NA

    SBB (Lot 8) 

    Punched Openings - Frames & Glass – EXT-NE

    NA

    NA

    SBB (Lot 8)

    Curtain Wall - Frames & Glass – EXT-NE

    NA

    NA

    SBB (Lot 8)

    Set & Grout Thin Brick – EXT-NE

    NA

    NA

    SBB (Lot 8)

    Plumbing Piping, Hook-up & Insulation – MECH-L1

    NA

    NA

    SBB (Lot 8)

    Set Distribution Board HDP-1A – MECH-L1

    NA

    NA

    SBB (Lot 8)

    Pull Low Voltage Cable – INT-L1

    NA

    NA

    SBB (Lot 8)

    Pull Electrical – INT-L1

    NA

    NA

    SBB (Lot 8)

    Install In-Wall & Hard lid Electrical – RR-L1

    NA

    NA

    SBB (Lot 8) 

    Tape Walls – INT-AUD

    NA

    NA

    SBB (Lot 8)

    Install Conduit to Switchgear – ELEC-L1

    NA

    NA

    SBB (Lot 8)

    Install Feeder Cable / Home Runs – ELEC-AUD

    NA

    NA

    SBB (Lot 8)

    Fab/Deliver Ceiling Light Fixtures – RR-L2

    NA

    NA

    SBB (Lot 8)

    Prime & 1st Coat of Paint, Walls, Hard lids & Exposed Ceilings – INT-L2

    NA

    NA

    SBB (Lot 8)

    Install Operable Partition Track – INT-L2

    NA

    NA

    SBB (Lot 8)

    Install Acoustical Grid – INT-L2

    NA

    NA

    SBB (Lot 8)

    Install In-Wall & Hard lid Electrical – RR-L3

    NA

    NA

    SBB (Lot 8)

    Install O/H Supply & Return Ductwork Branch & Seismic – INT-L4

    NA

    NA

    SBB (Lot 8)

    Set Remaining Equipment / Install Feeder Cable / Home Runs – ELEC-L4

    NA

    NA

    SBB (Lot 8)

    Hang 2nd Side Drywall & Inspect – INT-L4

    NA

    NA

    SBB (Lot 8)

    Install In-Wall & Hard lid Electrical – RR-L4

    NA

    NA

    SBB (Lot 8)

    Set, Hook-up & Terminate MTS - ELEC

    NA

    NA

    Anderson Park

    Backfill Planters – SITE AP

    Heavy Equipment

    Noise

     

    Week of April 22, 2024

    Construction Activities 

     

    Location

    Activity

    Equipment Used

    Anticipated Disturbance

    SBB (Lot 8) 

     

    Metal Panels – EXT-L1

    NA

    NA

    SBB (Lot 8) 

    Punched Openings – Glass – EXT-NE

    NA

    NA

    SBB (Lot 8) 

    Curtain Wall – Glass – EXT-NE

    NA

    NA

    SBB (Lot 8)

    Grout Thin Brick – EXT-NE

    NA

    NA

    SBB (Lot 8)

    Tape Walls Soffits & Hard lids – INT-L1

    NA

    NA

    SBB (Lot 8) 

    Install Roll Up Door - Cafe

    NA

    NA

    SBB (Lot 8)

    Install Acoustical Grid – INT-AUD

    NA

    NA

    SBB (Lot 8)

    Install Backing – RR-L2

    NA

    NA

    SBB (Lot 8)

    Install Backing – RR-L3

    NA

    NA

    SBB (Lot 8)

    Install Backing – RR-L4

    NA

    NA

    SBB (Lot 8)

    Install Acoustical Grid – INT-L2

    NA

    NA

    SBB (Lot 8)

    Tape Walls Soffits & Hard lids – INT-L3

    NA

    NA

    SBB (Lot 8)

    Install Ductwork Insulation – INT-L4

    NA

    NA

    SBB (Lot 8) 

    Hang 2nd Side Drywall & Inspect – INT-L4

    NA

    NA

    SBB (Lot 8)

    Remove Protection & Install Finishes - ELEV

    NA

    NA

    Anderson Park

    Backfill Planters – SITE-AP

    Heavy Equipment

    Noise

    Anderson Park

    F/R/P Seat Benches

    Heavy Equipment

    Noise

     

    Week of April 29, 2024

    Construction Activities 

     

    Location

    Activity

    Equipment Used

    Anticipated Disturbance

    SBB (Lot 8) 

    Caulking – EXT-L1

    NA

    NA

    SBB (Lot 8)

    Remove Scaffold – EXT-L1 

    NA

    NA

    SBB (Lot 8)

    Metal Panels – North of F Line EXT-NE

    NA

    NA

    SBB (Lot 8) 

    Caulking – EXT-SW

    NA

    NA

    SBB (Lot 8)

    Exterior Framing – Manlift Leavout

    NA

    NA

    SBB (Lot 8)

    Rigid Insulation and Air Water Barrier – Manlift Leavout

    NA

    NA

    SBB (Lot 8)

    Tape Walls Soffits & Hard lids – INT-L1

    NA

    NA

    SBB (Lot 8)

    Hang Drywall & Inspect – RR-L1

    NA

    NA

    SBB (Lot 8)

    Tape Walls & Ceilings – RR-L1

    NA

    NA

    SBB (Lot 8)

    Install Roll Up Door - CAFE

    NA

    NA

    SBB (Lot 8)

    Prime & 1st Coat of Paint, Walls, Hard lids & Exposed Ceilings – INT-L1

    NA

    NA

    SBB (Lot 8) 

    Install Acoustical Grid – INT-AUD

    NA

    NA

    SBB (Lot 8)

    Install Fire Sprinkler Drops / Heads – INT-AUD

    NA

    NA

    SBB (Lot 8) 

    Install Fire Alarm Devices – INT-AUD

    NA

    NA

    SBB (Lot 8)

    Install Lights and Egress Lighting – INT-AUD

    NA

    NA

    SBB (Lot 8)

    Install HVAC Grills & Diffusers – INT-AUD

    NA

    NA

    SBB (Lot 8) 

    Hang Drywall & Inspect – RR-L2

    NA

    NA

    SBB (Lot 8)

    Tape Walls & Ceilings – RR-L2

    NA

    NA

    SBB (Lot 8)

    Install HVAC Grills & Diffusers – INT-L2

    NA

    NA

    SBB (Lot 8)

    Install Fire Sprinkler Drops / Heads – INT-L2

    NA

    NA

    SBB (Lot 8)

    Install Fire Alarm Devices – INT-L2

    NA

    NA

    SBB (Lot 8)

    Install Lights and Egress Lighting – INT-L2

    NA

    NA

    SBB (Lot 8)

    Tape Walls & Ceilings – RR-L3

    NA

    NA

    SBB (Lot 8)

    Install Acoustical Grid – INT-L3

    NA

    NA

    SBB (Lot 8)

    Install Cable Tray – INT-L4

    NA

    NA

    SBB (Lot 8)

    Tape Walls Soffits & Hard lids – INT-L4

    NA

    NA

    SBB (Lot 8) 

    Pull Low Voltage Cable – INT-L4

    NA

    NA

    SBB (Lot 8)

    Tap Walls and Ceilings – RR-L4

    NA

    NA

    Anderson Park

    F/R/P Hardscape – Site-AP

    Heavy Equipment

    Noise

    SBB (Lot 8)

    Install Irrigation Sleeves – Site-N

    NA

    NA

    SBB (Lot 8)

    Install Site Lighting Underground – Site-N

    NA

    NA

    SBB (Lot 8)

    Tie-in Chilled Water to Campus Loop

    NA

    NA

    SBB (Lot 8) 

    Startup/Test Refrigerant Alarm System

    NA

    NA

     

    Current and Upcoming Anticipated Closures

    The following shutdown(s)/ closures are anticipated as indicated below. Updates to this schedule will be released weekly in the Project Construction Advisories until the work is complete.  Please contact John Franklin with any specific questions or concerns at john.franklin@ucr.edu.

     

    Description

    Location

    Duration & Date

    Impacted Buildings/ Facilities

    Lot 8

    Lot 8

    Permanently 

    Lot 8

    Lot 43

    Lot 43

    Indefinitely 

    Lot 43

    Anderson Park

    Anderson Park

    Indefinitely

    Anderson Park

  • 950592 UCR SBB - Construction Alert #74

    Current Week

    Construction Activities

     

    Location

    Activity

    Equipment Used

    Anticipated Disturbance

    SBB (Lot 8) 

    Install Roofing System - South of E Line

    NA

    NA

    SBB (Lot 8) 

    Curtain Wall – Frames – EXT-L1

    NA

    NA

    SBB (Lot 8) 

    Set Thin Brick – EXT-L1

    NA

    NA

    SBB (Lot 8)

    Punched Openings - Glass – EXT-SW

    NA

    NA

    SBB (Lot 8)

    Curtain Wall - Glass – EXT-SW

    NA

    NA

    SBB (Lot 8) 

    Grout Thin Brick – EXT-SW

    NA

    NA

    SBB (Lot 8)

    Install Hardlid Electrical – INT-L1

    NA

    NA

    SBB (Lot 8)

    Install In-Wall Plumbing – INT-L1

    NA

    NA

    SBB (Lot 8)

    Install Cable Tray – INT-L1

    NA

    NA

    SBB (Lot 8)

    O/H MEP Rough-in - Cafe

    NA

    NA

    SBB (Lot 8)

    Tape Walls – INT-AUD

    NA

    NA

    SBB (Lot 8)

    Hang 1st Side Drywall – INT-L3

    NA

    NA

    SBB (Lot 8)

    Install Cable Tray – INT-L3

    NA

    NA

    SBB (Lot 8) 

    Install Insulation & Inspect – INT-L3

    NA

    NA

    SBB (Lot 8)

    Fire Tape – INT-L3

    NA

    NA

    SBB (Lot 8)

    Install O/H Supply & Return Ductwork Branch & Seismic – INT-L4

    NA

    NA

    SBB (Lot 8)

    Frame Ceiling – RR-L4

    NA

    NA

    SBB (Lot 8)

    Hang, Tape and Finish Elevator Fronts - ELEV

    NA

    NA

    Anderson Park

    F/R/P Site Walls – SITE-AP

    Heavy Equipment

    Noise

     

    Week of April 15, 2024

    Construction Activities 

     

    Location

    Activity

    Equipment Used

    Anticipated Disturbance

    SBB (Lot 8) 

    Install Roofing System - North of E Line

    NA

    NA

    SBB (Lot 8) 

    Caulking – EXT-SW

    NA

    NA

    SBB (Lot 8) 

    Set & Grout Thin Brick – EXT-SW

    NA

    NA

    SBB (Lot 8)

    Punched Openings - Frames & Glass – EXT-SW

    NA

    NA

    SBB (Lot 8)

    Curtain Wall - Frames & Glass – EXT-SW

    NA

    NA

    SBB (Lot 8) 

    Punched Openings - Frames & Glass – EXT-NE

    NA

    NA

    SBB (Lot 8)

    Curtain Wall - Frames & Glass – EXT-NE

    NA

    NA

    SBB (Lot 8)

    Set & Grout Thin Brick – EXT-NE

    NA

    NA

    SBB (Lot 8)

    Plumbing Piping, Hook-up & Insulation – MECH-L1

    NA

    NA

    SBB (Lot 8)

    Set Distribution Board HDP-1A – MECH-L1

    NA

    NA

    SBB (Lot 8)

    Pull Low Voltage Cable – INT-L1

    NA

    NA

    SBB (Lot 8)

    Pull Electrical – INT-L1

    NA

    NA

    SBB (Lot 8)

    Install In-Wall & Hard lid Electrical – RR-L1

    NA

    NA

    SBB (Lot 8) 

    Tape Walls – INT-AUD

    NA

    NA

    SBB (Lot 8)

    Install Conduit to Switchgear – ELEC-L1

    NA

    NA

    SBB (Lot 8)

    Install Feeder Cable / Home Runs – ELEC-AUD

    NA

    NA

    SBB (Lot 8)

    Fab/Deliver Ceiling Light Fixtures – RR-L2

    NA

    NA

    SBB (Lot 8)

    Prime & 1st Coat of Paint, Walls, Hard lids & Exposed Ceilings – INT-L2

    NA

    NA

    SBB (Lot 8)

    Install Operable Partition Track – INT-L2

    NA

    NA

    SBB (Lot 8)

    Install Acoustical Grid – INT-L2

    NA

    NA

    SBB (Lot 8)

    Install In-Wall & Hard lid Electrical – RR-L3

    NA

    NA

    SBB (Lot 8)

    Install O/H Supply & Return Ductwork Branch & Seismic – INT-L4

    NA

    NA

    SBB (Lot 8)

    Set Remaining Equipment / Install Feeder Cable / Home Runs – ELEC-L4

    NA

    NA

    SBB (Lot 8)

    Hang 2nd Side Drywall & Inspect – INT-L4

    NA

    NA

    SBB (Lot 8)

    Install In-Wall & Hard lid Electrical – RR-L4

    NA

    NA

    SBB (Lot 8)

    Set, Hook-up & Terminate MTS - ELEC

    NA

    NA

    Anderson Park

    Backfill Planters – SITE AP

    Heavy Equipment

    Noise

     

    Week of April 22, 2024

    Construction Activities 

     

    Location

    Activity

    Equipment Used

    Anticipated Disturbance

    SBB (Lot 8) 

    Metal Panels – EXT-L1

    NA

    NA

    SBB (Lot 8) 

    Punched Openings – Glass – EXT-NE

    NA

    NA

    SBB (Lot 8) 

    Curtain Wall – Glass – EXT-NE

    NA

    NA

    SBB (Lot 8)

    Grout Thin Brick – EXT-NE

    NA

    NA

    SBB (Lot 8)

    Tape Walls Soffits & Hard lids – INT-L1

    NA

    NA

    SBB (Lot 8) 

    Install Roll Up Door - Cafe

    NA

    NA

    SBB (Lot 8)

    Install Acoustical Grid – INT-AUD

    NA

    NA

    SBB (Lot 8)

    Install Backing – RR-L2

    NA

    NA

    SBB (Lot 8)

    Install Backing – RR-L3

    NA

    NA

    SBB (Lot 8)

    Install Backing – RR-L4

    NA

    NA

    SBB (Lot 8)

    Install Acoustical Grid – INT-L2

    NA

    NA

    SBB (Lot 8)

    Tape Walls Soffits & Hard lids – INT-L3

    NA

    NA

    SBB (Lot 8)

    Install Ductwork Insulation – INT-L4

    NA

    NA

    SBB (Lot 8) 

    Hang 2nd Side Drywall & Inspect – INT-L4

    NA

    NA

    SBB (Lot 8)

    Remove Protection & Install Finishes - ELEV

    NA

    NA

    Anderson Park

    Backfill Planters – SITE-AP

    Heavy Equipment

    Noise

    Anderson Park

    F/R/P Seat Benches

    Heavy Equipment

    Noise

     

    Current and Upcoming Anticipated Closures

    The following shutdown(s)/ closures are anticipated as indicated below. Updates to this schedule will be released weekly in the Project Construction Advisories until the work is complete.  Please contact John Franklin with any specific questions or concerns at john.franklin@ucr.edu.

     

    Description

    Location

    Duration & Date

    Impacted Buildings/ Facilities

    Lot 8

    Lot 8

    Permanently 

    Lot 8

    Lot 43

    Lot 43

    Indefinitely 

    Lot 43

    Anderson Park

    Anderson Park

    Indefinitely

    Anderson Park

     

  • 950592 UCR SBB - Construction Alert #73

    Current Week

    Construction Activities

     

    Location

    Activity

    Equipment Used

    Anticipated Disturbance

    SBB (Lot 8) 

    Install Roofing System - South of E Line

    NA

    NA

    SBB (Lot 8) 

    Curtain Wall – Frames – EXT-L1

    NA

    NA

    SBB (Lot 8) 

    Set Thin Brick – EXT-L1

    NA

    NA

    SBB (Lot 8)

    Set Thin Brick – EXT-SW

    NA

    NA

    SBB (Lot 8)

    Punched Openings - Frames – EXT-SW

    NA

    NA

    SBB (Lot 8) 

    Curtain Wall - Frames – EXT-SW

    NA

    NA

    SBB (Lot 8)

    F/R/P Stair Treads/Landings – EXT-SW

    NA

    NA

    SBB (Lot 8)

    Cement Board – EXT-NE

    NA

    NA

    SBB (Lot 8)

    Secondary Air Barrier – EXT-NE

    NA

    NA

    SBB (Lot 8)

    Install Feeder Cable / Home Runs – ELEC-L1

    NA

    NA

    SBB (Lot 8)

    Controls Hook-up Equipment (Incl. Refrigerant Alarm) – MECH-L1

    NA

    NA

    SBB (Lot 8)

    Plumbing Piping, Hook-up & Insulation – MECH-L1

    NA

    NA

    SBB (Lot 8)

    Set Distribution Board HDP-1A – MECH-L1

    NA

    NA

    SBB (Lot 8) 

    Install Feeder Cable from MSB – MECH-L1

    NA

    NA

    SBB (Lot 8)

    Electrical Hook-up Equipment – MECH-L1

    NA

    NA

    SBB (Lot 8)

    Install In-Wall & Branch Electrical – INT-L1

    NA

    NA

    SBB (Lot 8)

    Install In-Wall Low Voltage – INT-L1

    NA

    NA

    SBB (Lot 8)

    Top Down Drywall / Fire Tape / TOW - Cafe

    NA

    NA

    SBB (Lot 8)

    Fire Tape – INT-AUD

    NA

    NA

    SBB (Lot 8)

    Hang 2nd Side Drywall & Inspect – INT-AUD

    NA

    NA

    SBB (Lot 8)

    Install Ductwork Insulation – INT-AUD

    NA

    NA

    SBB (Lot 8)

    Pull Low Voltage Cable – INT-L2

    NA

    NA

    SBB (Lot 8)

    Install Corner Bead – INT-L2

    NA

    NA

    SBB (Lot 8)

    Pull Electrical – INT-L3

    NA

    NA

    SBB (Lot 8)

    Install O/H Mechanical Equipment & Ductwork Mains & Seismic – INT-L4

    NA

    NA

    SBB (Lot 8)

    Pull Electrical – INT-L4 

    NA

    NA

    SBB (Lot 8)

    Fire Tape – RR-L4

    NA

    NA

    SBB (Lot 8)

    Fire Caulk Head of Wall – RR-L4

    NA

    NA

    SBB (Lot 8)

    Frame Ceiling – RR-L4

    NA

    NA

    SBB (Lot 8)

    Frame Elevator Fronts - ELEV

    NA

    NA

    SBB (Lot 8)

    Install Hoistway Wiring - ELEV

    NA

    NA

    Anderson Park

    F/R/P Site Walls – SITE-AP

    Heavy Equipment 

    Noise

    Anderson Park

    F/R/P Seat Benches – SITE-EAST

    Heavy Equipment

    Noise

     

    Week of April 8, 2024

    Construction Activities 

     

    Location

    Activity

    Equipment Used

    Anticipated Disturbance

    SBB (Lot 8) 

    Install Roofing System - South of E Line

    NA

    NA

    SBB (Lot 8) 

    Curtain Wall – Frames – EXT-L1

    NA

    NA

    SBB (Lot 8) 

    Set Thin Brick – EXT-L1

    NA

    NA

    SBB (Lot 8)

    Punched Openings - Glass – EXT-SW

    NA

    NA

    SBB (Lot 8)

    Curtain Wall - Glass – EXT-SW

    NA

    NA

    SBB (Lot 8) 

    Grout Thin Brick – EXT-SW

    NA

    NA

    SBB (Lot 8)

    Install Hardlid Electrical – INT-L1

    NA

    NA

    SBB (Lot 8)

    Install In-Wall Plumbing – INT-L1

    NA

    NA

    SBB (Lot 8)

    Install Cable Tray – INT-L1

    NA

    NA

    SBB (Lot 8)

    O/H MEP Rough-in - Cafe

    NA

    NA

    SBB (Lot 8)

    Tape Walls – INT-AUD

    NA

    NA

    SBB (Lot 8)

    Hang 1st Side Drywall – INT-L3

    NA

    NA

    SBB (Lot 8)

    Install Cable Tray – INT-L3

    NA

    NA

    SBB (Lot 8) 

    Install Insulation & Inspect – INT-L3

    NA

    NA

    SBB (Lot 8)

    Fire Tape – INT-L3

    NA

    NA

    SBB (Lot 8)

    Install O/H Supply & Return Ductwork Branch & Seismic – INT-L4

    NA

    NA

    SBB (Lot 8)

    Frame Ceiling – RR-L4

    NA

    NA

    SBB (Lot 8)

    Hang, Tape and Finish Elevator Fronts - ELEV

    NA

    NA

    Anderson Park

    F/R/P Site Walls – SITE-AP

    Heavy Equipment

    Noise

     

    Week of April 15, 2024

    Construction Activities 

     

    Location

    Activity

    Equipment Used

    Anticipated Disturbance

    SBB (Lot 8) 

    Install Roofing System - North of E Line

    NA

    NA

    SBB (Lot 8) 

    Caulking – EXT-SW

    NA

    NA

    SBB (Lot 8) 

    Set & Grout Thin Brick – EXT-SW

    NA

    NA

    SBB (Lot 8)

    Punched Openings - Frames & Glass – EXT-SW

    NA

    NA

    SBB (Lot 8)

    Curtain Wall - Frames & Glass – EXT-SW

    NA

    NA

    SBB (Lot 8) 

    Punched Openings - Frames & Glass – EXT-NE

    NA

    NA

    SBB (Lot 8)

    Curtain Wall - Frames & Glass – EXT-NE

    NA

    NA

    SBB (Lot 8)

    Set & Grout Thin Brick – EXT-NE

    NA

    NA

    SBB (Lot 8)

    Plumbing Piping, Hook-up & Insulation – MECH-L1

    NA

    NA

    SBB (Lot 8)

    Set Distribution Board HDP-1A – MECH-L1

    NA

    NA

    SBB (Lot 8)

    Pull Low Voltage Cable – INT-L1

    NA

    NA

    SBB (Lot 8)

    Pull Electrical – INT-L1

    NA

    NA

    SBB (Lot 8)

    Install In-Wall & Hard lid Electrical – RR-L1

    NA

    NA

    SBB (Lot 8) 

    Tape Walls – INT-AUD

    NA

    NA

    SBB (Lot 8)

    Install Conduit to Switchgear – ELEC-L1

    NA

    NA

    SBB (Lot 8)

    Install Feeder Cable / Home Runs – ELEC-AUD

    NA

    NA

    SBB (Lot 8)

    Fab/Deliver Ceiling Light Fixtures – RR-L2

    NA

    NA

    SBB (Lot 8)

    Prime & 1st Coat of Paint, Walls, Hard lids & Exposed Ceilings – INT-L2

    NA

    NA

    SBB (Lot 8)

    Install Operable Partition Track – INT-L2

    NA

    NA

    SBB (Lot 8)

    Install Acoustical Grid – INT-L2

    NA

    NA

    SBB (Lot 8)

    Install In-Wall & Hard lid Electrical – RR-L3

    NA

    NA

    SBB (Lot 8)

    Install O/H Supply & Return Ductwork Branch & Seismic – INT-L4

    NA

    NA

    SBB (Lot 8)

    Set Remaining Equipment / Install Feeder Cable / Home Runs – ELEC-L4

    NA

    NA

    SBB (Lot 8)

    Hang 2nd Side Drywall & Inspect – INT-L4

    NA

    NA

    SBB (Lot 8)

    Install In-Wall & Hard lid Electrical – RR-L4

    NA

    NA

    SBB (Lot 8)

    Set, Hook-up & Terminate MTS - ELEC

    NA

    NA

    Anderson Park

    Backfill Planters – SITE AP

    Heavy Equipment

    Noise

     

    Current and Upcoming Anticipated Closures

    The following shutdown(s)/ closures are anticipated as indicated below. Updates to this schedule will be released weekly in the Project Construction Advisories until the work is complete.  Please contact John Franklin with any specific questions or concerns at john.franklin@ucr.edu.

     

    Description

    Location

    Duration & Date

    Impacted Buildings/ Facilities

    Lot 8

    Lot 8

    Permanently 

    Lot 8

    Lot 43

    Lot 43

    Indefinitely 

    Lot 43

    Anderson Park

    Anderson Park

    Indefinitely

    Anderson Park

  • 950592 UCR SBB - Construction Alert #72

    Current Week

    Construction Activities

     

    Location

    Activity

    Equipment Used

    Anticipated Disturbance

    SBB (Lot 8) 

    Controls Hook-up Equipment - RF

    NA

    NA

    SBB (Lot 8) 

    Secondary Air Barrier – EXT-L1

    NA

    NA

    SBB (Lot 8) 

    Secondary Air Barrier – EXT-SW

    NA

    NA

    SBB (Lot 8)

    Set Thin Brick – EXT-SW

    NA

    NA

    SBB (Lot 8)

    Punched Openings - Frames – EXT-SW

    NA

    NA

    SBB (Lot 8) 

    Curtain Wall - Frames – EXT-SW

    NA

    NA

    SBB (Lot 8)

    F/R/P Stair Treads/Landings – EXT-SW

    NA

    NA

    SBB (Lot 8)

    Drainage Layer – EXT-NE

    NA

    NA

    SBB (Lot 8)

    Install Electrical Gear ELEC-L1

    NA

    NA

    SBB (Lot 8)

    Controls Hook-up Equipment (Incl. Refrigerant Alarm) – MECH-L1

    NA

    NA

    SBB (Lot 8)

    Plumbing Piping, Hook-up & Insulation – MECH-L1

    NA

    NA

    SBB (Lot 8)

    Frame Remaining Walls, Soffits & Hard lids – INT-L1

    NA

    NA

    SBB (Lot 8)

    In-Wall MEP Rough-in - Cafe

    NA

    NA

    SBB (Lot 8) 

    Hang Drywall – INT-AUD

    NA

    NA

    SBB (Lot 8)

    Pull Low Voltage Cable – INT-AUD

    NA

    NA

    SBB (Lot 8)

    Pressure Test Ductwork – INT-AUD

    NA

    NA

    SBB (Lot 8)

    Install Ductwork Insulation – INT-AUD

    NA

    NA

    SBB (Lot 8)

    Install Feeder Cable / Home Runs – ELEC-AUD

    NA

    NA

    SBB (Lot 8)

    Install Switchgear MSB – ELEC-L1

    NA

    NA

    SBB (Lot 8)

    Hang 2nd Side Drywall & Inspect – INT-L2

    NA

    NA

    SBB (Lot 8)

    Pull Low Voltage Cable – INT-L2

    NA

    NA

    SBB (Lot 8)

    Install Ductwork Insulation – INT-L3

    NA

    NA

    SBB (Lot 8)

    Pressure Test Ductwork – INT-L3

    NA

    NA

    SBB (Lot 8)

    Install Feeder Cable / Home Runs – ELEC-L3

    NA

    NA

    SBB (Lot 8)

    Install In-Wall & Branch Electrical – INT-L3

    NA

    NA

    SBB (Lot 8)

    Install In-Wall Low Voltage – INT-L3

    NA

    NA

    SBB (Lot 8)

    Install Hardlid Electrical – INT-L3

    NA

    NA

    SBB (Lot 8)

    Install In-Wall Plumbing – INT-L3

    NA

    NA

    SBB (Lot 8)

    Fire Tape – INT-L4

    NA

    NA

    SBB (Lot 8)

    Fire Caulk Head of Wall – INT-L4

    NA

    NA

    SBB (Lot 8)

    Install Feeder Cable / Home Run  – INT-L4

    NA

    NA

    SBB (Lot 8)

    Hang Top Down Drywall – RR-L4

    NA

    NA

    SBB (Lot 8)

    Complete Install Guide Rails - ELEV

    NA

    NA

    SBB (Lot 8)

    Install Entrances and Doors - ELEV

    NA

    NA

    SBB (Lot 8)

    Install Site Lighting Underground – SITE-AP

    NA

    NA

    SBB (Lot 8)

    F/R/P Site Walls – SITE-AP

    NA

    NA

     

    Week of April 1, 2024

    Construction Activities 

     

    Location

    Activity

    Equipment Used

    Anticipated Disturbance

    SBB (Lot 8) 

    Install Roofing System - South of E Line

    NA

    NA

    SBB (Lot 8) 

    Curtain Wall – Frames – EXT-L1

    NA

    NA

    SBB (Lot 8) 

    Set Thin Brick – EXT-L1

    NA

    NA

    SBB (Lot 8)

    Set Thin Brick – EXT-SW

    NA

    NA

    SBB (Lot 8)

    Punched Openings - Frames – EXT-SW

    NA

    NA

    SBB (Lot 8) 

    Curtain Wall - Frames – EXT-SW

    NA

    NA

    SBB (Lot 8)

    F/R/P Stair Treads/Landings – EXT-SW

    NA

    NA

    SBB (Lot 8)

    Cement Board – EXT-NE

    NA

    NA

    SBB (Lot 8)

    Secondary Air Barrier – EXT-NE

    NA

    NA

    SBB (Lot 8)

    Install Feeder Cable / Home Runs – ELEC-L1

    NA

    NA

    SBB (Lot 8)

    Controls Hook-up Equipment (Incl. Refrigerant Alarm) – MECH-L1

    NA

    NA

    SBB (Lot 8)

    Plumbing Piping, Hook-up & Insulation – MECH-L1

    NA

    NA

    SBB (Lot 8)

    Set Distribution Board HDP-1A – MECH-L1

    NA

    NA

    SBB (Lot 8) 

    Install Feeder Cable from MSB – MECH-L1

    NA

    NA

    SBB (Lot 8)

    Electrical Hook-up Equipment – MECH-L1

    NA

    NA

    SBB (Lot 8)

    Install In-Wall & Branch Electrical – INT-L1

    NA

    NA

    SBB (Lot 8)

    Install In-Wall Low Voltage – INT-L1

    NA

    NA

    SBB (Lot 8)

    Top Down Drywall / Fire Tape / TOW - Cafe

    NA

    NA

    SBB (Lot 8)

    Fire Tape – INT-AUD

    NA

    NA

    SBB (Lot 8) 

    Hang 2nd Side Drywall & Inspect – INT-AUD

    NA

    NA

    SBB (Lot 8)

    Install Ductwork Insulation – INT-AUD

    NA

    NA

    SBB (Lot 8)

    Pull Low Voltage Cable – INT-L2

    NA

    NA

    SBB (Lot 8)

    Install Corner Bead – INT-L2

    NA

    NA

    SBB (Lot 8)

    Pull Electrical – INT-L3

    NA

    NA

    SBB (Lot 8)

    Install O/H Mechanical Equipment & Ductwork Mains & Seismic – INT-L4

    NA

    NA

    SBB (Lot 8) 

    Pull Electrical – INT-L4    

    NA

    NA

    SBB (Lot 8)

    Fire Tape – RR-L4

    NA

    NA

    SBB (Lot 8)

    Fire Caulk Head of Wall – RR-L4

    NA

    NA

    SBB (Lot 8)

    Frame Ceiling – RR-L4

    NA

    NA

    SBB (Lot 8)

    Frame Elevator Fronts - ELEV

    NA

    NA

    SBB (Lot 8)

    Install Hoistway Wiring - ELEV

    NA

    NA

    SBB (Lot 8)

    F/R/P Site Walls – SITE-AP

    NA

    NA

    SBB (Lot 8)

    F/R/P Seat Benches – SITE-EAST

    NA

    NA

     

    Week of April 8, 2024

    Construction Activities 

     

    Location

    Activity

    Equipment Used

    Anticipated Disturbance

    SBB (Lot 8) 

    Install Roofing System - South of E Line

    NA

    NA

    SBB (Lot 8) 

    Curtain Wall – Frames – EXT-L1

    NA

    NA

    SBB (Lot 8) 

    Set Thin Brick – EXT-L1

    NA

    NA

    SBB (Lot 8)

    Punched Openings - Glass – EXT-SW

    NA

    NA

    SBB (Lot 8)

    Curtain Wall - Glass – EXT-SW

    NA

    NA

    SBB (Lot 8) 

    Grout Thin Brick – EXT-SW

    NA

    NA

    SBB (Lot 8)

    Install Hardlid Electrical – INT-L1

    NA

    NA

    SBB (Lot 8)

    Install In-Wall Plumbing – INT-L1

    NA

    NA

    SBB (Lot 8)

    Install Cable Tray – INT-L1

    NA

    NA

    SBB (Lot 8)

    O/H MEP Rough-in - Cafe

    NA

    NA

    SBB (Lot 8)

    Tape Walls – INT-AUD

    NA

    NA

    SBB (Lot 8)

    Hang 1st Side Drywall – INT-L3

    NA

    NA

    SBB (Lot 8)

    Install Cable Tray – INT-L3

    NA

    NA

    SBB (Lot 8) 

    Install Insulation & Inspect – INT-L3

    NA

    NA

    SBB (Lot 8)

    Fire Tape – INT-L3

    NA

    NA

    SBB (Lot 8)

    Install O/H Supply & Return Ductwork Branch & Seismic – INT-L4

    NA

    NA

    SBB (Lot 8)

    Frame Ceiling – RR-L4

    NA

    NA

    SBB (Lot 8)

    Hang, Tape and Finish Elevator Fronts - ELEV

    NA

    NA

    SBB (Lot 8)

    F/R/P Site Walls – SITE-AP

    NA

    NA

     

    Current and Upcoming Anticipated Closures

    The following shutdown(s)/ closures are anticipated as indicated below. Updates to this schedule will be released weekly in the Project Construction Advisories until the work is complete.  Please contact John Franklin with any specific questions or concerns at john.franklin@ucr.edu.

     

    Description

    Location

    Duration & Date

    Impacted Buildings/ Facilities

    Lot 8

    Lot 8

    Permanently 

    Lot 8

    Lot 43

    Lot 43

    Indefinitely 

    Lot 43

    Anderson Park

    Anderson Park

    Indefinitely

    Anderson Park

  • 950592 UCR SBB - Construction Alert #71

    Current Week

    Construction Activities

     

    Location

    Activity

    Equipment Used

    Anticipated Disturbance

    SBB (Lot 8) 

    Install PV Panel System - North of E Line

    NA

    NA

    SBB (Lot 8) 

    Cement Board – EXT-L1

    NA

    NA

    SBB (Lot 8) 

    Secondary Air Barrier– EXT-L1

    NA

    NA

    SBB (Lot 8)

    Drainage Layer– EXT-NE

    NA

    NA

    SBB (Lot 8)

    Cement Board– EXT-NE

    NA

    NA

    SBB (Lot 8) 

    Secondary Air Barrier– EXT-SW

    NA

    NA

    SBB (Lot 8)

    Erect Stairs– EXT-SW

    NA

    NA

    SBB (Lot 8)

    Install Communications Racks/Equipment -ELEC-L1

    NA

    NA

    SBB (Lot 8)

    Controls Hook-up Equipment (Incl. Refrigerant Alarm) – MECH-L1

    NA

    NA

    SBB (Lot 8)

    Plumbing Piping, Hook-up & Insulation– MECH-L1

    NA

    NA

    SBB (Lot 8)

    Frame Remaining Walls, Soffits & Hard lids – INT-L1

    NA

    NA

    SBB (Lot 8)

    Install O/H Supply & Return Ductwork Branch & Seismic – INT-AUD

    NA

    NA

    SBB (Lot 8)

    Pull Electrical – INT-AUD

    NA

    NA

    SBB (Lot 8) 

    Pull Low Voltage Cable – INT-AUD

    NA

    NA

    SBB (Lot 8)

    Install Conduit – ELEC-AUD

    NA

    NA

    SBB (Lot 8)

    Install Conduit – ELEC-L2

    NA

    NA

    SBB (Lot 8)

    Hang 2nd Side Drywall & Inspect - INT-L2

    NA

    NA

    SBB (Lot 8)

    Pull Low Voltage Cable- INT-L2

    NA

    NA

    SBB (Lot 8)

    Install Backing – RR-L2

    NA

    NA

    SBB (Lot 8)

    Install Insulation and Inspect – RR-L2

    NA

    NA

    SBB (Lot 8)

    Hang Drywall & Inspect– RR-L2

    NA

    NA

    SBB (Lot 8)

    Install Conduit – ELEC-L3

    NA

    NA

    SBB (Lot 8)

    Install Hardlid Electrical – INT-L3

    NA

    NA

    SBB (Lot 8)

    Install In-Wall Plumbing – INT-L3

    NA

    NA

    SBB (Lot 8)

    Install In-Wall & Hard lid Electrical– RR-L3

    NA

    NA

    SBB (Lot 8)

    Install Backing– RR-L3

    NA

    NA

    SBB (Lot 8)

    Install O/H Mechanical Equipment & Ductwork Mains & Seismic – INT-L4

    NA

    NA

    SBB (Lot 8)

    Install Conduit – ELEC-L4

    NA

    NA

    SBB (Lot 8)

    Install In-Wall & Branch Electrical – INT-L4

    NA

    NA

    SBB (Lot 8)

    Install In-Wall Low Voltage – INT-L4

    NA

    NA

    SBB (Lot 8)

    Install Hardlid Electrical – INT-L4

    NA

    NA

    SBB (Lot 8)

    Machine Room Wiring, Start-up, Running Platform - ELEV

    NA

    NA

    SBB (Lot 8)

    F/R/P Site Walls – SITE-AP

    NA

    NA

    SBB (Lot 8)

    Install Site Lighting Underground – SITE-AP

    NA

    NA

     

    Week of March 25, 2024

    Construction Activities 

     

    Location

    Activity

    Equipment Used

    Anticipated Disturbance

    SBB (Lot 8) 

    Curtain Wall – Frames – EXT-L1

    NA

    NA

    SBB (Lot 8) 

    Set Thin Brick – EXT-L1

    NA

    NA

    SBB (Lot 8) 

    Cement Board – EXT-NE

    NA

    NA

    SBB (Lot 8)

    Secondary Air Barrier – EXT-NE

    NA

    NA

    SBB (Lot 8)

    Set Thin Brick – EXT-SW

    NA

    NA

    SBB (Lot 8) 

    Punched Openings – Frames – EXT-SW

    NA

    NA

    SBB (Lot 8)

    Curtain Wall – Frames – EXT-SW

    NA

    NA

    SBB (Lot 8)

    Install In-Wall & Branch Electrical - INT-L1

    NA

    NA

    SBB (Lot 8)

    Install In-Wall Low Voltage - INT-L1

    NA

    NA

    SBB (Lot 8)

    Hang Drywall – INT-AUD

    NA

    NA

    SBB (Lot 8)

    Pressure Test Ductwork – INT-AUD

    NA

    NA

    SBB (Lot 8)

    Install Ductwork Insulation – INT-AUD

    NA

    NA

    SBB (Lot 8)

    Install Feeder Cable / Home Runs – ELEC-AUD

    NA

    NA

    SBB (Lot 8) 

    Install Switchgear MSB – ELEC-L1

    NA

    NA

    SBB (Lot 8)

    Install Feeder Cable / Home Runs – ELEC-L2

    NA

    NA

    SBB (Lot 8)

    Tape Walls Soffits & Hard lids – RR-L2

    NA

    NA

    SBB (Lot 8)

    Install Feeder Cable / Home Runs – ELEC-L3

    NA

    NA

    SBB (Lot 8)

    Hang 1st Side Drywall – INT-L3

    NA

    NA

    SBB (Lot 8)

    Install Cable Tray– INT-L3

    NA

    NA

    SBB (Lot 8) 

    Pull Electrical– INT-L3

    NA

    NA

    SBB (Lot 8)

    Install Insulation & Inspect– INT-L3

    NA

    NA

    SBB (Lot 8)

    Fire Tape– INT-L3

    NA

    NA

    SBB (Lot 8)

    Install Insulation & Inspect – RR-L3

    NA

    NA

    SBB (Lot 8)

    Hang Drywall & Inspect – RR-L3

    NA

    NA

    SBB (Lot 8)

    Install O/H Mechanical Equipment & Ductwork Mains & Seismic – INT-L4

    NA

    NA

    SBB (Lot 8) 

    Install O/H Supply & Return Ductwork Branch & Seismic – INT-L4

    NA

    NA

    SBB (Lot 8)

    Pull Electrical – INT-L4

    NA

    NA

    SBB (Lot 8)

    Hang Top Down Drywall – RR-L4

    NA

    NA

    SBB (Lot 8)

    Fire Tape – RR-L4

    NA

    NA

    SBB (Lot 8)

    Fire Caulk Head of Wall – RR-L4

    NA

    NA

    SBB (Lot 8)

    Complete Install Guide Rails - ELEV

    NA

    NA

     

    Week of April 1, 2024

    Construction Activities 

     

    Location

    Activity

    Equipment Used

    Anticipated Disturbance

    SBB (Lot 8) 

    Install Roofing System - South of E Line

    NA

    NA

    SBB (Lot 8) 

    Curtain Wall – Frames – EXT-L1

    NA

    NA

    SBB (Lot 8) 

    Set Thin Brick – EXT-L1

    NA

    NA

    SBB (Lot 8)

    Punched Openings – Frames – EXT-NE

    NA

    NA

    SBB (Lot 8)

    Curtain Wall – Frames – EXT-NE

    NA

    NA

    SBB (Lot 8) 

    Set Thin Brick – EXT-NE

    NA

    NA

    SBB (Lot 8)

    Set Thin Brick – EXT-SW

    NA

    NA

    SBB (Lot 8)

    Punched Openings – Frames – EXT-SW

    NA

    NA

    SBB (Lot 8)

    Curtain Wall – Frames – EXT-SW

    NA

    NA

    SBB (Lot 8)

    F/R/P Stair Treads/Landings – EXT-SW

    NA

    NA

    SBB (Lot 8)

    Install Feeder Cable / Home Runs – ELEC-L1

    NA

    NA

    SBB (Lot 8)

    Set Distribution Board HDP-1A - MECH-L1

    NA

    NA

    SBB (Lot 8)

    Install Feeder Cable from MSB - MECH-L1

    NA

    NA

    SBB (Lot 8) 

    Install In-Wall & Branch Electrical – INT-L1

    NA

    NA

    SBB (Lot 8)

    Install In-Wall Low Voltage – INT-L1

    NA

    NA

    SBB (Lot 8)

    Install Hardlid Electrical – INT-L1

    NA

    NA

    SBB (Lot 8)

    Install In-Wall Plumbing – INT-L1

    NA

    NA

    SBB (Lot 8)

    Install Cable Tray – INT-L1

    NA

    NA

    SBB (Lot 8)

    Frame Ceiling – RR-L1

    NA

    NA

    SBB (Lot 8)

    Fire Tape - INT-AUD

    NA

    NA

    SBB (Lot 8)

    Hang 2nd Side Drywall & Inspect - INT-AUD

    NA

    NA

    SBB (Lot 8)

    Install Ductwork Insulation – INT-AUD

    NA

    NA

    SBB (Lot 8)

    Install Conduit to Switchgear – ELEC-L1

    NA

    NA

    SBB (Lot 8)

    Tape Walls Soffits & Hard lids – INT-L2

    NA

    NA

    SBB (Lot 8)

    Hang 1st Side Drywall – INT-L3

    NA

    NA

    SBB (Lot 8)

    Pull Low Voltage Cable – INT-L3

    NA

    NA

    SBB (Lot 8)

    Pull Electrical – INT-L3

    NA

    NA

    SBB (Lot 8)

    Install Insulation & Inspect – INT-L3

    NA

    NA

    SBB (Lot 8)

    Install O/H Mechanical Equipment & Ductwork Mains & Seismic – INT-L4

    NA

    NA

    SBB (Lot 8)

    Install O/H Supply & Return Ductwork Branch & Seismic – INT-L4

    NA

    NA

    SBB (Lot 8)

    Pull Electrical – INT-L4

    NA

    NA

    SBB (Lot 8)

    Fire Tape – RR-L4

    NA

    NA

    SBB (Lot 8)

    Fire Caulk Head of Wall – RR-L4

    NA

    NA

    SBB (Lot 8)

    Frame Ceiling – RR-L4

    NA

    NA

    SBB (Lot 8)

    Install Entrances and Doors - ELEV

    NA

    NA

    SBB (Lot 8)

    Frame Elevator Fronts - ELEV

    NA

    NA

    SBB (Lot 8)

    Install Hoistway Wiring - ELEV

    NA

    NA

     

    Current and Upcoming Anticipated Closures

    The following shutdown(s)/ closures are anticipated as indicated below. Updates to this schedule will be released weekly in the Project Construction Advisories until the work is complete.  Please contact John Franklin with any specific questions or concerns at john.franklin@ucr.edu.

     

    Description

    Location

    Duration & Date

    Impacted Buildings/ Facilities

    Lot 8

    Lot 8

    Permanently 

    Lot 8

    Lot 43

    Lot 43

    Indefinitely 

    Lot 43

    Anderson Park

    Anderson Park

    Indefinitely

    Anderson Park

  • 950592 UCR SBB - Construction Alert #70

    Current Week

    Construction Activities

     

    Location

    Activity

    Equipment Used

    Anticipated Disturbance

    SBB (Lot 8)

    Controls Hook-up Equipment

    NA

    NA

    SBB (Lot 8)

    Coordinate Drainage Layer Install – EXT-L1

    NA

    NA

    SBB (Lot 8)

    Drainage Layer – EXT-L1

    NA

    NA

    SBB (Lot 8)

    Flashings / Window Surrounds – EXT-NE

    NA

    NA

    SBB (Lot 8)

    Erect Steel Structure for Stairs - EXT-SW

    NA

    NA

    SBB (Lot 8)

    Drainage Layer - EXT-SW

    NA

    NA

    SBB (Lot 8)

    Install Conduit – ELEC-L1

    NA

    NA

    SBB (Lot 8)

    HVAC Ductwork, Hook-up & Insulation – MECH-L1

    NA

    NA

    SBB (Lot 8)

    HVAC Piping, Hook-up & Insulation – MECH-L1

    NA

    NA

    SBB (Lot 8)

    Set Plumbing Equipment – MECH-L1

    NA

    NA

    SBB (Lot 8)

    Install Operable Partition Track -INT-L1

    NA

    NA

    SBB (Lot 8)

    Install In-Wall & Branch Electrical – INT-AUD

    NA

    NA

    SBB (Lot 8)

    Install In-Wall Low Voltage – INT-AUD

    NA

    NA

    SBB (Lot 8)

    Frame Soffit – INT-AUD

    NA

    NA

    SBB (Lot 8)

    Install O/H Supply & Return Ductwork Branch & Seismic – INT-AUD

    NA

    NA

    SBB (Lot 8)

    Hang 1st Side Drywall – INT-L2

    NA

    NA

    SBB (Lot 8)

    Pull Electrical– INT-L2

    NA

    NA

    SBB (Lot 8)

    Install Insulation & Inspect– INT-L2

    NA

    NA

    SBB (Lot 8)

    Install Cable Tray– INT-L2

    NA

    NA

    SBB (Lot 8)

    Install In-Wall & Hard lid Electrical – RR-L2

    NA

    NA

    SBB (Lot 8)

    Install Ductwork Insulation – INT-L3

    NA

    NA

    SBB (Lot 8)

    Pressure Test Ductwork – INT-L3

    NA

    NA

    SBB (Lot 8)

    Install Conduit – ELEC-L3

    NA

    NA

    SBB (Lot 8)

    Install In-Wall & Branch Electrical – INT-L3

    NA

    NA

    SBB (Lot 8)

    Install In-Wall Low Voltage – INT-L3

    NA

    NA

    SBB (Lot 8)

    Frame Ceiling – RR-L3

    NA

    NA

    SBB (Lot 8)

    Hang 1st Side Top Down Drywall – INT-L4

    NA

    NA

    SBB (Lot 8)

    Install Insulation & Inspect – INT-L4

    NA

    NA

    SBB (Lot 8)

    Hang 2nd Side Top Down Drywall & Inspect – INT-L4

    NA

    NA

    SBB (Lot 8)

    Insulate Test Hot/Cold Supply & Return Mech Lines – INT-L4

    NA

    NA

    SBB (Lot 8)

    Install Mechanical / FSD's – ELEC-L4

    NA

    NA

    SBB (Lot 8)

    Frame Remaining Walls, Soffits & Hard lids – INT-L4

    NA

    NA

    SBB (Lot 8)

    Install In-Wall Plumbing

    NA

    NA

    SBB (Lot 8)

    Install In-Wall & Branch Electrical

    NA

    NA

    SBB (Lot 8)

    Install In-Wall Low Voltage

    NA

    NA

    SBB (Lot 8)

    Install Hardlid Electrical

    NA

    NA

    SBB (Lot 8)

    Install Irrigation Sleeves – SITE-AP

    NA

    NA

    SBB (Lot 8)

    Install Site Lighting Underground – SITE-AP

    NA

    NA

     

    Week of March 18, 2024

    Construction Activities 

     

    Location

    Activity

    Equipment Used

    Anticipated Disturbance

    SBB (Lot 8)

    Install PV Panel System - North of E Line

    NA

    NA

    SBB (Lot 8)

    Cement Board – EXT-L1

    NA

    NA

    SBB (Lot 8)

    Secondary Air Barrier– EXT-L1

    NA

    NA

    SBB (Lot 8)

    Drainage Layer– EXT-NE

    NA

    NA

    SBB (Lot 8)

    Cement Board– EXT-NE

    NA

    NA

    SBB (Lot 8)

    Secondary Air Barrier– EXT-SW

    NA

    NA

    SBB (Lot 8)

    Erect Stairs– EXT-SW

    NA

    NA

    SBB (Lot 8)

    Install Communications Racks/Equipment -ELEC-L1

    NA

    NA

    SBB (Lot 8)

    Controls Hook-up Equipment (Incl. Refrigerant Alarm) – MECH-L1

    NA

    NA

    SBB (Lot 8)

    Plumbing Piping, Hook-up & Insulation– MECH-L1

    NA

    NA

    SBB (Lot 8)

    Frame Remaining Walls, Soffits & Hard lids – INT-L1

    NA

    NA

    SBB (Lot 8)

    Install O/H Supply & Return Ductwork Branch & Seismic – INT-AUD

    NA

    NA

    SBB (Lot 8)

    Pull Electrical – INT-AUD

    NA

    NA

    SBB (Lot 8)

    Pull Low Voltage Cable – INT-AUD

    NA

    NA

    SBB (Lot 8)

    Install Conduit – ELEC-AUD

    NA

    NA

    SBB (Lot 8)

    Install Conduit – ELEC-L2

    NA

    NA

    SBB (Lot 8)

    Hang 2nd Side Drywall & Inspect - INT-L2

    NA

    NA

    SBB (Lot 8)

    Pull Low Voltage Cable- INT-L2

    NA

    NA

    SBB (Lot 8)

    Install Backing – RR-L2

    NA

    NA

    SBB (Lot 8)

    Install Insulation and Inspect – RR-L2

    NA

    NA

    SBB (Lot 8)

    Hang Drywall & Inspect– RR-L2

    NA

    NA

    SBB (Lot 8)

    Install Conduit – ELEC-L3

    NA

    NA

    SBB (Lot 8)

    Install Hardlid Electrical – INT-L3

    NA

    NA

    SBB (Lot 8)

    Install In-Wall Plumbing – INT-L3

    NA

    NA

    SBB (Lot 8)

    Install In-Wall & Hard lid Electrical– RR-L3

    NA

    NA

    SBB (Lot 8)

    Install Backing– RR-L3

    NA

    NA

    SBB (Lot 8)

    Install O/H Mechanical Equipment & Ductwork Mains & Seismic – INT-L4

    NA

    NA

    SBB (Lot 8)

    Install Conduit – ELEC-L4

    NA

    NA

    SBB (Lot 8)

    Install In-Wall & Branch Electrical – INT-L4

    NA

    NA

    SBB (Lot 8)

    Install In-Wall Low Voltage – INT-L4

    NA

    NA

    SBB (Lot 8)

    Install Hardlid Electrical – INT-L4

    NA

    NA

    SBB (Lot 8)

    Machine Room Wiring, Start-up, Running Platform - ELEV

    NA

    NA

    SBB (Lot 8)

    F/R/P Site Walls – SITE-AP

    NA

    NA

    SBB (Lot 8)

    Install Site Lighting Underground – SITE-AP

    NA

    NA

     

    Week of March 25, 2024

    Construction Activities 

     

    Location

    Activity

    Equipment Used

    Anticipated Disturbance

    SBB (Lot 8)

    Curtain Wall – Frames – EXT-L1

    NA

    NA

    SBB (Lot 8)

    Set Thin Brick – EXT-L1

    NA

    NA

    SBB (Lot 8)

    Cement Board – EXT-NE

    NA

    NA

    SBB (Lot 8)

    Secondary Air Barrier – EXT-NE

    NA

    NA

    SBB (Lot 8)

    Set Thin Brick – EXT-SW

    NA

    NA

    SBB (Lot 8)

    Punched Openings – Frames – EXT-SW

    NA

    NA

    SBB (Lot 8)

    Curtain Wall – Frames – EXT-SW

    NA

    NA

    SBB (Lot 8)

    Install In-Wall & Branch Electrical - INT-L1

    NA

    NA

    SBB (Lot 8)

    Install In-Wall Low Voltage - INT-L1

    NA

    NA

    SBB (Lot 8)

    Hang Drywall – INT-AUD

    NA

    NA

    SBB (Lot 8)

    Pressure Test Ductwork – INT-AUD

    NA

    NA

    SBB (Lot 8)

    Install Ductwork Insulation – INT-AUD

    NA

    NA

    SBB (Lot 8)

    Install Feeder Cable / Home Runs – ELEC-AUD

    NA

    NA

    SBB (Lot 8)

    Install Switchgear MSB – ELEC-L1

    NA

    NA

    SBB (Lot 8)

    Install Feeder Cable / Home Runs – ELEC-L2

    NA

    NA

    SBB (Lot 8)

    Tape Walls Soffits & Hard lids – RR-L2

    NA

    NA

    SBB (Lot 8)

    Install Feeder Cable / Home Runs – ELEC-L3

    NA

    NA

    SBB (Lot 8)

    Hang 1st Side Drywall – INT-L3

    NA

    NA

    SBB (Lot 8)

    Install Cable Tray– INT-L3

    NA

    NA

    SBB (Lot 8)

    Pull Electrical– INT-L3

    NA

    NA

    SBB (Lot 8)

    Install Insulation & Inspect– INT-L3

    NA

    NA

    SBB (Lot 8)

    Fire Tape– INT-L3

    NA

    NA

    SBB (Lot 8)

    Install Insulation & Inspect – RR-L3

    NA

    NA

    SBB (Lot 8)

    Hang Drywall & Inspect – RR-L3

    NA

    NA

    SBB (Lot 8)

    Install O/H Mechanical Equipment & Ductwork Mains & Seismic – INT-L4

    NA

    NA

    SBB (Lot 8)

    Install O/H Supply & Return Ductwork Branch & Seismic – INT-L4

    NA

    NA

    SBB (Lot 8)

    Pull Electrical – INT-L4

    NA

    NA

    SBB (Lot 8)

    Hang Top Down Drywall – RR-L4

    NA

    NA

    SBB (Lot 8)

    Fire Tape – RR-L4

    NA

    NA

    SBB (Lot 8)

    Fire Caulk Head of Wall – RR-L4

    NA

    NA

    SBB (Lot 8)

    Complete Install Guide Rails - ELEV

    NA

    NA

     

    Current and Upcoming Anticipated Closures

    The following shutdown(s)/ closures are anticipated as indicated below. Updates to this schedule will be released weekly in the Project Construction Advisories until the work is complete.  Please contact John Franklin with any specific questions or concerns at john.franklin@ucr.edu.

     

    Description

    Location

    Duration & Date

    Impacted Buildings/ Facilities

    Lot 8

    Lot 8

    Permanently

    Lot 8

    Lot 43

    Lot 43

    Indefinitely

    Lot 43

    Anderson Park

    Anderson Park

    Indefinitely

    Anderson Park

  • 950592 UCR SBB - Construction Alert #69

    Current Week

    Construction Activities

     

    Location

    Activity

    Equipment Used

    Anticipated Disturbance

    SBB (Lot 8)

    HVAC Ductwork, Hook-up & Insulation

    NA

    NA

    SBB (Lot 8)

    Stuff & Spray Deck Edge

    NA

    NA

    SBB (Lot 8)

    Install PV Panel System - South of E Line

    NA

    NA

    SBB (Lot 8)

    Curtain Wall – Frames – EXT-L1

    NA

    NA

    SBB (Lot 8)

    Set Thin Brick – EXT-L1

    NA

    NA

    SBB (Lot 8)

    Curtain Wall – Frames – EXT-NE

    NA

    NA

    SBB (Lot 8)

    Punched Openings – Glass – EXT-NE

    NA

    NA

    SBB (Lot 8)

    Secondary Air Barrier – EXT-SW

    NA

    NA

    SBB (Lot 8)

    F/R/P Stair Treads/Landings – EXT-SW

    NA

    NA

    SBB (Lot 8)

    HVAC Piping, Hook-up & Insulation – MECH-L1

    NA

    NA

    SBB (Lot 8)

    Plumbing Piping, Hook-up & Insulation – MECH-L1

    NA

    NA

    SBB (Lot 8)

    Pull Low Voltage Cable – INT-L1

    NA

    NA

    SBB (Lot 8)

    Pull Electrical – INT-L1

    NA

    NA

    SBB (Lot 8)

    Install O/H Mechanical Equipment & Ductwork Mains & Seismic – INT-AUD

    NA

    NA

    SBB (Lot 8)

    Install Conduit – ELEC-AUD

    NA

    NA

    SBB (Lot 8)

    Install O/H Electrical Home Runs – INT-L2

    NA

    NA

    SBB (Lot 8)

    Insulate Test Hot/Cold Supply & Return Mech Lines – INT-L2

    NA

    NA

    SBB (Lot 8)

    Install Conduit – ELEC-L2

    NA

    NA

    SBB (Lot 8)

    Install O/H Hot/Cold Supply & Return Branch Mech Lines & Seismic – INT-L3

    NA

    NA

    SBB (Lot 8)

    Install O/H Electrical Home Runs – INT-L3

    NA

    NA

    SBB (Lot 8)

    Install Ductwork Insulation – INT-L3

    NA

    NA

    SBB (Lot 8)

    Install O/H Supply & Return Ductwork Branch & Seismic – INT-L4

    NA

    NA

    SBB (Lot 8)

    Install Lights and Receptacles - ELEV

    NA

    NA

    SBB (Lot 8)

    F/R/P Site Walls – Anderson Park

    NA

    NA

     

    Week of March 11, 2024

    Construction Activities 

     

    Location

    Activity

    Equipment Used

    Anticipated Disturbance

    SBB (Lot 8)

    Install PV Panel System - South of E Line

    NA

    NA

    SBB (Lot 8)

    Curtain Wall – Frames – EXT-L1

    NA

    NA

    SBB (Lot 8)

    Set Thin Brick – EXT-L1

    NA

    NA

    SBB (Lot 8)

    Punched Openings – Glass – EXT-NE

    NA

    NA

    SBB (Lot 8)

    Set Thin Brick – EXT-NE

    NA

    NA

    SBB (Lot 8)

    Punched Openings – Frames - EXT-SW

    NA

    NA

    SBB (Lot 8)

    F/R/P Stair Treads/Landings - EXT-SW

    NA

    NA

    SBB (Lot 8)

    Set Thin Brick - EXT-SW

    NA

    NA

    SBB (Lot 8)

    Hang 1st Side Drywall – INT-L1

    NA

    NA

    SBB (Lot 8)

    Pull Low Voltage Cable – INT-L1

    NA

    NA

    SBB (Lot 8)

    Pull Electrical – INT-L1

    NA

    NA

    SBB (Lot 8)

    Install Fire Sprinkler Mains, Branches & Seismic – INT-AUD

    NA

    NA

    SBB (Lot 8)

    Install O/H Waste & Vent – INT-AUD

    NA

    NA

    SBB (Lot 8)

    Install Conduit – ELEC-AUD

    NA

    NA

    SBB (Lot 8)

    Frame Remaining Walls, Soffits & Hard lids – INT-L2

    NA

    NA

    SBB (Lot 8)

    Install O/H Hot/Cold Supply & Return Branch Mech Lines & Seismic – INT-L3

    NA

    NA

    SBB (Lot 8)

    Install O/H Electrical Home Runs – INT-L3

    NA

    NA

    SBB (Lot 8)

    Install O/H Supply & Return Ductwork Branch & Seismic – INT-L4              

    NA

    NA

    SBB (Lot 8)

    Set, Hook-up & Terminate MTS – Electrical

    NA

    NA

     

    Week of March 18, 2024

    Construction Activities 

     

    Location

    Activity

    Equipment Used

    Anticipated Disturbance

    SBB (Lot 8)

    Install PV Panel System - North of E Line

    NA

    NA

    SBB (Lot 8)

    Cement Board – EXT-L1

    NA

    NA

    SBB (Lot 8)

    Secondary Air Barrier– EXT-L1

    NA

    NA

    SBB (Lot 8)

    Drainage Layer– EXT-NE

    NA

    NA

    SBB (Lot 8)

    Cement Board– EXT-NE

    NA

    NA

    SBB (Lot 8)

    Secondary Air Barrier– EXT-SW

    NA

    NA

    SBB (Lot 8)

    Erect Stairs– EXT-SW

    NA

    NA

    SBB (Lot 8)

    Install Communications Racks/Equipment -ELEC-L1

    NA

    NA

    SBB (Lot 8)

    Controls Hook-up Equipment (Incl. Refrigerant Alarm) – MECH-L1

    NA

    NA

    SBB (Lot 8)

    Plumbing Piping, Hook-up & Insulation– MECH-L1

    NA

    NA

    SBB (Lot 8)

    Frame Remaining Walls, Soffits & Hard lids – INT-L1

    NA

    NA

    SBB (Lot 8)

    Install O/H Supply & Return Ductwork Branch & Seismic – INT-AUD

    NA

    NA

    SBB (Lot 8)

    Pull Electrical – INT-AUD

    NA

    NA

    SBB (Lot 8)

    Pull Low Voltage Cable – INT-AUD

    NA

    NA

    SBB (Lot 8)

    Install Conduit – ELEC-AUD

    NA

    NA

    SBB (Lot 8)

    Install Conduit – ELEC-L2

    NA

    NA

    SBB (Lot 8)

    Hang 2nd Side Drywall & Inspect - INT-L2

    NA

    NA

    SBB (Lot 8)

    Pull Low Voltage Cable- INT-L2

    NA

    NA

    SBB (Lot 8)

    Install Backing – RR-L2

    NA

    NA

    SBB (Lot 8)

    Install Insulation and Inspect – RR-L2

    NA

    NA

    SBB (Lot 8)

    Hang Drywall & Inspect– RR-L2

    NA

    NA

    SBB (Lot 8)

    Install Conduit – ELEC-L3

    NA

    NA

    SBB (Lot 8)

    Install Hardlid Electrical – INT-L3

    NA

    NA

    SBB (Lot 8)

    Install In-Wall Plumbing – INT-L3

    NA

    NA

    SBB (Lot 8)

    Install In-Wall & Hard lid Electrical– RR-L3

    NA

    NA

    SBB (Lot 8)

    Install Backing– RR-L3

    NA

    NA

    SBB (Lot 8)

    Install O/H Mechanical Equipment & Ductwork Mains & Seismic – INT-L4

    NA

    NA

    SBB (Lot 8)

    Install Conduit – ELEC-L4

    NA

    NA

    SBB (Lot 8)

    Install In-Wall & Branch Electrical – INT-L4

    NA

    NA

    SBB (Lot 8)

    Install In-Wall Low Voltage – INT-L4

    NA

    NA

    SBB (Lot 8)

    Install Hardlid Electrical – INT-L4

    NA

    NA

    SBB (Lot 8)

    Machine Room Wiring, Start-up, Running Platform - ELEV

    NA

    NA

    SBB (Lot 8)

    F/R/P Site Walls – SITE-AP

    NA

    NA

    SBB (Lot 8)

    Install Site Lighting Underground – SITE-AP

    NA

    NA

     

    Current and Upcoming Anticipated Closures

    The following shutdown(s)/ closures are anticipated as indicated below. Updates to this schedule will be released weekly in the Project Construction Advisories until the work is complete.  Please contact John Franklin with any specific questions or concerns at john.franklin@ucr.edu.

     

    Description

    Location

    Duration & Date

    Impacted Buildings/ Facilities

    Lot 8

    Lot 8

    Permanently

    Lot 8

    Lot 43

    Lot 43

    Indefinitely

    Lot 43

    Anderson Park

    Anderson Park

    Indefinitely

    Anderson Park

  • 950592 UCR SBB - Construction Alert #68

    Current Week

    Construction Activities

     

    Location

    Activity

    Equipment Used

    Anticipated Disturbance

    SBB (Lot 8)

    Electrical Hook-up Equipment

    NA

    NA

    SBB (Lot 8)

    Install PV Panel Secondary Framing - North of E Line

    Crane

    Noise Due to Equipment

    SBB (Lot 8)

    HVAC Piping, Hook-up & Insulation

    NA

    NA

    SBB (Lot 8)

    Flashings / Window Surrounds – EXT-L1

    NA

    NA

    SBB (Lot 8)

    Drainage Layer – EXT-L1

    NA

    NA

    SBB (Lot 8)

    Cement Board – EXT-L1

    NA

    NA

    SBB (Lot 8)

    Rigid Insulation & Air Water Barrier – EXT-NE

    NA

    NA

    SBB (Lot 8)

    Field Measure for Curtain Wall – EXT-NE

    NA

    NA

    SBB (Lot 8)

    Flashings / Window Surrounds – EXT-SW

    NA

    NA

    SBB (Lot 8)

    Drainage Layer – EXT-SW

    NA

    NA

    SBB (Lot 8)

    Install O/H Electrical Home Runs – INT-L1

    NA

    NA

    SBB (Lot 8)

    Install Ductwork Insulation – INT-L1

    NA

    NA

    SBB (Lot 8)

    HVAC Ductwork, Hook-up & Insulation – MECH-L1

    NA

    NA

    SBB (Lot 8)

    Controls Hook-up Equipment – MECH-L1

    NA

    NA

    SBB (Lot 8)

    HVAC Piping, Hook-up & Insulation – MECH-L1

    NA

    NA

    SBB (Lot 8)

    Plumbing Piping, Hook-up & Insulation – MECH-L1

    NA

    NA

    SBB (Lot 8)

    Install Hot/Cold Domestic Water Lines & Seismic – MECH-L1

    NA

    NA

    SBB (Lot 8)

    Tape Walls – MECH-L1

    NA

    NA

    SBB (Lot 8)

    Install O/H Supply & Return Ductwork Branch & Seismic – INT-L2

    NA

    NA

    SBB (Lot 8)

    Install Hot/Cold Domestic Water Lines & Seismic – INT-L3

    NA

    NA

    SBB (Lot 8)

    Install O/H Waste & Vent – INT-L3

    NA

    NA

    SBB (Lot 8)

    Install O/H Mechanical Equipment & Ductwork Mains & Seismic – INT-L3

    NA

    NA

    SBB (Lot 8)

    Tape Walls – ELEC-L3

    NA

    NA

     

    Week of March 4, 2024

    Construction Activities 

     

    Location

    Activity

    Equipment Used

    Anticipated Disturbance

    SBB (Lot 8)

    HVAC Ductwork, Hook-up & Insulation

    NA

    NA

    SBB (Lot 8)

    Stuff & Spray Deck Edge

    NA

    NA

    SBB (Lot 8)

    Install PV Panel System - South of E Line

    Crane

    Noise Due to Equipment

    SBB (Lot 8)

    Curtain Wall – Frames – EXT-L1

    NA

    NA

    SBB (Lot 8)

    Set Thin Brick – EXT-L1

    NA

    NA

    SBB (Lot 8)

    Curtain Wall – Frames – EXT-NE

    NA

    NA

    SBB (Lot 8)

    Punched Openings – Glass – EXT-NE

    NA

    NA

    SBB (Lot 8)

    Secondary Air Barrier – EXT-SW

    NA

    NA

    SBB (Lot 8)

    F/R/P Stair Treads/Landings – EXT-SW

    NA

    NA

    SBB (Lot 8)

    HVAC Piping, Hook-up & Insulation – MECH-L1

    NA

    NA

    SBB (Lot 8)

    Plumbing Piping, Hook-up & Insulation – MECH-L1

    NA

    NA

    SBB (Lot 8)

    Pull Low Voltage Cable – INT-L1

    NA

    NA

    SBB (Lot 8)

    Pull Electrical – INT-L1

    NA

    NA

    SBB (Lot 8)

    Install O/H Mechanical Equipment & Ductwork Mains & Seismic – INT-AUD

    NA

    NA

    SBB (Lot 8)

    Install Conduit – ELEC-AUD

    NA

    NA

    SBB (Lot 8)

    Install O/H Electrical Home Runs – INT-L2

    NA

    NA

    SBB (Lot 8)

    Insulate Test Hot/Cold Supply & Return Mech Lines – INT-L2

    NA

    NA

    SBB (Lot 8)

    Install Conduit – ELEC-L2

    NA

    NA

    SBB (Lot 8)

    Install O/H Hot/Cold Supply & Return Branch Mech Lines & Seismic – INT-L3

    NA

    NA

    SBB (Lot 8)

    Install O/H Electrical Home Runs – INT-L3

    NA

    NA

    SBB (Lot 8)

    Install Ductwork Insulation – INT-L3

    NA

    NA

    SBB (Lot 8)

    Install O/H Supply & Return Ductwork Branch & Seismic – INT-L4

    NA

    NA

    SBB (Lot 8)

    Install Lights and Receptacles - ELEV

    NA

    NA

    SBB (Lot 8)

    F/R/P Site Walls – Anderson Park

    NA

    NA

     

    Week of March 11, 2024

    Construction Activities 

     

    Location

    Activity

    Equipment Used

    Anticipated Disturbance

    SBB (Lot 8)

    Install PV Panel System - South of E Line

    Crane

    Noise Due to Equipment

    SBB (Lot 8)

    Curtain Wall – Frames – EXT-L1

    NA

    NA

    SBB (Lot 8)

    Set Thin Brick – EXT-L1

    NA

    NA

    SBB (Lot 8)

    Punched Openings – Glass – EXT-NE

    NA

    NA

    SBB (Lot 8)

    Set Thin Brick – EXT-NE

    NA

    NA

    SBB (Lot 8)

    Punched Openings – Frames - EXT-SW

    NA

    NA

    SBB (Lot 8)

    F/R/P Stair Treads/Landings - EXT-SW

    NA

    NA

    SBB (Lot 8)

    Set Thin Brick - EXT-SW

    NA

    NA

    SBB (Lot 8)

    Hang 1st Side Drywall – INT-L1

    NA

    NA

    SBB (Lot 8)

    Pull Low Voltage Cable – INT-L1

    NA

    NA

    SBB (Lot 8)

    Pull Electrical – INT-L1

    NA

    NA

    SBB (Lot 8)

    Install Fire Sprinkler Mains, Branches & Seismic – INT-AUD

    NA

    NA

    SBB (Lot 8)

    Install O/H Waste & Vent – INT-AUD

    NA

    NA

    SBB (Lot 8)

    Install Conduit – ELEC-AUD

    NA

    NA

    SBB (Lot 8)

    Frame Remaining Walls, Soffits & Hard lids – INT-L2

    NA

    NA

    SBB (Lot 8)

    Install O/H Hot/Cold Supply & Return Branch Mech Lines & Seismic – INT-L3

    NA

    NA

    SBB (Lot 8)

    Install O/H Electrical Home Runs – INT-L3

    NA

    NA

    SBB (Lot 8)

    Install O/H Supply & Return Ductwork Branch & Seismic – INT-L4          

    NA

    NA

    SBB (Lot 8)

    Set, Hook-up & Terminate MTS – Electrical

    NA

    NA

     

     

    Current and Upcoming Anticipated Closures

    The following shutdown(s)/ closures are anticipated as indicated below. Updates to this schedule will be released weekly in the Project Construction Advisories until the work is complete.  Please contact John Franklin with any specific questions or concerns at john.franklin@ucr.edu.

     

    Description

    Location

    Duration & Date

    Impacted Buildings/ Facilities

    Lot 8

    Lot 8

    Permanently

    Lot 8

    Lot 43

    Lot 43

    Indefinitely

    Lot 43

    Anderson Park

    Anderson Park

    Indefinitely

    Anderson Park

  • 950592 UCR SBB - Construction Alert #67

    Current Week

    Construction Activities

     

    Location

    Activity

    Equipment Used

    Anticipated Disturbance

    SBB (Lot 8)

    Exterior Framing – East Elevation

    NA

    NA

    SBB (Lot 8)

    F/R/P Stair Treads/Landings – EXT-NE

    NA

    NA

    SBB (Lot 8)

    Exterior Framing - North Elevation – EXT-NE

    NA

    NA

    SBB (Lot 8)

    Rigid Insulation & Air Water Barrier – EXT-NE

    NA

    NA

    SBB (Lot 8)

    Field Measure for Curtain Wall – EXT-NE

    NA

    NA

    SBB (Lot 8)

    Flashings / Window Surrounds – EXT-NE

    NA

    NA

    SBB (Lot 8)

    Erect Steel Structure for Stairs – EXT-SW

    NA

    NA

    SBB (Lot 8)

    Rigid Insulation & Air Water Barrier– EXT-SW

    NA

    NA

    SBB (Lot 8)

    Exterior Framing - South Elevation– EXT-SW

    NA

    NA

    SBB (Lot 8)

    Field Measure for Curtain Wall– EXT-SW

    NA

    NA

    SBB (Lot 8)

    Flashings / Window Surrounds– EXT-SW

    NA

    NA

    SBB (Lot 8)

    Drainage Layer– EXT-SW

    NA

    NA

    SBB (Lot 8)

    Cement Board– EXT-SW

    NA

    NA

    SBB (Lot 8)

    Secondary Air Barrier– EXT-SW

    NA

    NA

    SBB (Lot 8)

    Erect Stairs– EXT-SW

    NA

    NA

    SBB (Lot 8)

    Install Ductwork Insulation– INT-L1

    NA

    NA

    SBB (Lot 8)

    Pressure Test Hot/Cold Supply & Return Mech Lines– INT-L1

    NA

    NA

    SBB (Lot 8)

    Insulate Test Hot/Cold Supply & Return Mech Lines– INT-L1

    NA

    NA

    SBB (Lot 8)

    HVAC Ductwork, Hook-up & Insulation – MECH-L1

    NA

    NA

    SBB (Lot 8)

    Controls Hook-up Equipment (Incl. Refrigerant Alarm) – MECH-L1

    NA

    NA

    SBB (Lot 8)

    HVAC Piping, Hook-up & Insulation – MECH-L1

    NA

    NA

    SBB (Lot 8)

    Plumbing Piping, Hook-up & Insulation – MECH-L1

    NA

    NA

    SBB (Lot 8)

    Set Distribution Board HDP-1A – MECH-L1

    NA

    NA

    SBB (Lot 8)

    Hang Drywall – INT-AUD

    NA

    NA

    SBB (Lot 8)

    Tape Walls – ELEC-AUD

    NA

    NA

    SBB (Lot 8)

    Fire Caulk Head of Wall – ELEC-AUD

    NA

    NA

    SBB (Lot 8)

    Prime & 1st Coat of Paint, Walls & Exposed Ceilings – ELEC-AUD

    NA

    NA

    SBB (Lot 8)

    Install Hot/Cold Supply & Return Mech Lines & Seismic – INT-L2

    NA

    NA

    SBB (Lot 8)

    Pressure Test Ductwork– INT-L2

    NA

    NA

    SBB (Lot 8)

    Install O/H Electrical Home Runs – INT-L2

    NA

    NA

    SBB (Lot 8)

    Tape Walls – ELEC-L3

    NA

    NA

    SBB (Lot 8)

    Fire Caulk Head of Wall– ELEC-L3

    NA

    NA

    SBB (Lot 8)

    Fire Tape – INT-L4

    NA

    NA

    SBB (Lot 8)

    Fire Caulk Head of Wall – INT-L4

    NA

    NA

    SBB (Lot 8)

    Install O/H Waste and Vent – INT-L4

    NA

    NA

    SBB (Lot 8)

    Install Insulation and Inspect – ELEC-L4

    NA

    NA

    SBB (Lot 8)

    Hang Drywall and Inspect – ELEC-L4

    NA

    NA

    SBB (Lot 8)

    Tape Walls – ELEC-L4

    NA

    NA

     

    Week of February 26, 2024

    Construction Activities 

     

    Location

    Activity

    Equipment Used

    Anticipated Disturbance

    SBB (Lot 8)

    Electrical Hook-up Equipment

    NA

    NA

    SBB (Lot 8)

    Install PV Panel Secondary Framing - North of E Line

    Crane

    Noise Due to Equipment

    SBB (Lot 8)

    HVAC Piping, Hook-up & Insulation

    NA

    NA

    SBB (Lot 8)

    Flashings / Window Surrounds – EXT-L1

    NA

    NA

    SBB (Lot 8)

    Drainage Layer – EXT-L1

    NA

    NA

    SBB (Lot 8)

    Cement Board – EXT-L1

    NA

    NA

    SBB (Lot 8)

    Rigid Insulation & Air Water Barrier – EXT-NE

    NA

    NA

    SBB (Lot 8)

    Field Measure for Curtain Wall – EXT-NE

    NA

    NA

    SBB (Lot 8)

    Flashings / Window Surrounds – EXT-SW

    NA

    NA

    SBB (Lot 8)

    Drainage Layer – EXT-SW

    NA

    NA

    SBB (Lot 8)

    Install O/H Electrical Home Runs – INT-L1

    NA

    NA

    SBB (Lot 8)

    Install Ductwork Insulation – INT-L1

    NA

    NA

    SBB (Lot 8)

    HVAC Ductwork, Hook-up & Insulation – MECH-L1

    NA

    NA

    SBB (Lot 8)

    Controls Hook-up Equipment – MECH-L1

    NA

    NA

    SBB (Lot 8)

    HVAC Piping, Hook-up & Insulation – MECH-L1

    NA

    NA

    SBB (Lot 8)

    Plumbing Piping, Hook-up & Insulation – MECH-L1

    NA

    NA

    SBB (Lot 8)

    Install Hot/Cold Domestic Water Lines & Seismic – MECH-L1

    NA

    NA

    SBB (Lot 8)

    Tape Walls – MECH-L1

    NA

    NA

    SBB (Lot 8)

    Install O/H Supply & Return Ductwork Branch & Seismic – INT-L2

    NA

    NA

    SBB (Lot 8)

    Install Hot/Cold Domestic Water Lines & Seismic – INT-L3

    NA

    NA

    SBB (Lot 8)

    Install O/H Waste & Vent – INT-L3

    NA

    NA

    SBB (Lot 8)

    Install O/H Mechanical Equipment & Ductwork Mains & Seismic – INT-L3

    NA

    NA

    SBB (Lot 8)

    Tape Walls – ELEC-L3

    NA

    NA

     

    Week of March 4, 2024

    Construction Activities 

     

    Location

    Activity

    Equipment Used

    Anticipated Disturbance

    SBB (Lot 8)

    HVAC Ductwork, Hook-up & Insulation

    NA

    NA

    SBB (Lot 8)

    Stuff & Spray Deck Edge

    NA

    NA

    SBB (Lot 8)

    Install PV Panel System - South of E Line

    NA

    NA

    SBB (Lot 8)

    Curtain Wall – Frames – EXT-L1

    NA

    NA

    SBB (Lot 8)

    Set Thin Brick – EXT-L1

    NA

    NA

    SBB (Lot 8)

    Curtain Wall – Frames – EXT-NE

    NA

    NA

    SBB (Lot 8)

    Punched Openings – Glass – EXT-NE

    NA

    NA

    SBB (Lot 8)

    Secondary Air Barrier – EXT-SW

    NA

    NA

    SBB (Lot 8)

    F/R/P Stair Treads/Landings – EXT-SW

    NA

    NA

    SBB (Lot 8)

    HVAC Piping, Hook-up & Insulation – MECH-L1

    NA

    NA

    SBB (Lot 8)

    Plumbing Piping, Hook-up & Insulation – MECH-L1

    NA

    NA

    SBB (Lot 8)

    Pull Low Voltage Cable – INT-L1

    NA

    NA

    SBB (Lot 8)

    Pull Electrical – INT-L1

    NA

    NA

    SBB (Lot 8)

    Install O/H Mechanical Equipment & Ductwork Mains & Seismic – INT-AUD

    NA

    NA

    SBB (Lot 8)

    Install Conduit – ELEC-AUD

    NA

    NA

    SBB (Lot 8)

    Install O/H Electrical Home Runs – INT-L2

    NA

    NA

    SBB (Lot 8)

    Insulate Test Hot/Cold Supply & Return Mech Lines – INT-L2

    NA

    NA

    SBB (Lot 8)

    Install Conduit – ELEC-L2

    NA

    NA

    SBB (Lot 8)

    Install O/H Hot/Cold Supply & Return Branch Mech Lines & Seismic – INT-L3

    NA

    NA

    SBB (Lot 8)

    Install O/H Electrical Home Runs – INT-L3

    NA

    NA

    SBB (Lot 8)

    Install Ductwork Insulation – INT-L3

    NA

    NA

    SBB (Lot 8)

    Install O/H Supply & Return Ductwork Branch & Seismic – INT-L4

    NA

    NA

    SBB (Lot 8)

    Install Lights and Receptacles - ELEV

    NA

    NA

    SBB (Lot 8)

    F/R/P Site Walls – Anderson Park

    NA

    NA

     

     

    Current and Upcoming Anticipated Closures

    The following shutdown(s)/ closures are anticipated as indicated below. Updates to this schedule will be released weekly in the Project Construction Advisories until the work is complete.  Please contact John Franklin with any specific questions or concerns at john.franklin@ucr.edu.

     

    Description

    Location

    Duration & Date

    Impacted Buildings/ Facilities

    Lot 8

    Lot 8

    Permanently

    Lot 8

    Lot 43

    Lot 43

    Indefinitely

    Lot 43

    Anderson Park

    Anderson Park

    Indefinitely

    Anderson Park

  • 950592 UCR SBB - Construction Alert #66

    Current Week

    Construction Activities

     

    Location

    Activity

    Equipment Used

    Anticipated Disturbance

    SBB (Lot 8)

    Install PV Panel Secondary Framing - South of E Line

    Crane

    Noise Due to Equipment

    SBB (Lot 8)

    Set Mechanical Equipment - Roof

    Crane

    Noise Due to Equipment

    SBB (Lot 8)

    Flashings / Window Surrounds – EXT-L1

    NA

    NA

    SBB (Lot 8)

    Drainage Layer – EXT-L1

    NA

    NA

    SBB (Lot 8)

    Cement Board – EXT-L1

    NA

    NA

    SBB (Lot 8)

    Exterior Framing – East Elevation

    NA

    NA

    SBB (Lot 8)

    F/R/P Stair Treads/Landings – EXT-NE

    NA

    NA

    SBB (Lot 8)

    Exterior Framing - North Elevation – EXT-NE

    NA

    NA

    SBB (Lot 8)

    Rigid Insulation & Air Water Barrier – EXT-NE

    NA

    NA

    SBB (Lot 8)

    Field Measure for Curtain Wall – EXT-NE

    NA

    NA

    SBB (Lot 8)

    Flashings / Window Surrounds – EXT-NE

    NA

    NA

    SBB (Lot 8)

    Erect Steel Structure for Stairs – EXT-SW

    NA

    NA

    SBB (Lot 8)

    Rigid Insulation & Air Water Barrier– EXT-SW

    NA

    NA

    SBB (Lot 8)

    Exterior Framing - South Elevation– EXT-SW

    NA

    NA

    SBB (Lot 8)

    Field Measure for Curtain Wall– EXT-SW

    NA

    NA

    SBB (Lot 8)

    Flashings / Window Surrounds– EXT-SW

    NA

    NA

    SBB (Lot 8)

    Drainage Layer– EXT-SW

    NA

    NA

    SBB (Lot 8)

    Cement Board– EXT-SW

    NA

    NA

    SBB (Lot 8)

    Secondary Air Barrier– EXT-SW

    NA

    NA

    SBB (Lot 8)

    Erect Stairs– EXT-SW

    NA

    NA

    SBB (Lot 8)

    Install O/H Hot/Cold Supply and Return Branch Mech Lines – INT-L1

    NA

    NA

    SBB (Lot 8)

    Install Ductwork Insulation– INT-L1

    NA

    NA

    SBB (Lot 8)

    Pressure Test Hot/Cold Supply & Return Mech Lines– INT-L1

    NA

    NA

    SBB (Lot 8)

    Insulate Test Hot/Cold Supply & Return Mech Lines– INT-L1

    NA

    NA

    SBB (Lot 8)

    HVAC Ductwork, Hook-up & Insulation – MECH-L1

    NA

    NA

    SBB (Lot 8)

    Controls Hook-up Equipment (Incl. Refrigerant Alarm) – MECH-L1

    NA

    NA

    SBB (Lot 8)

    HVAC Piping, Hook-up & Insulation – MECH-L1

    NA

    NA

    SBB (Lot 8)

    Plumbing Piping, Hook-up & Insulation – MECH-L1

    NA

    NA

    SBB (Lot 8)

    Set Distribution Board HDP-1A – MECH-L1

    NA

    NA

    SBB (Lot 8)

    Frame Remaining Walls, Soffits & Hard lids – INT-L1

    NA

    NA

    SBB (Lot 8)

    Install Insulation & Inspect - AUD

    NA

    NA

    SBB (Lot 8)

    Install Backing – ELEC-AUD

    NA

    NA

    SBB (Lot 8)

    Install Insulation & Inspect – ELEC-AUD

    NA

    NA

    SBB (Lot 8)

    Hang Drywall & Inspect – ELEC-AUD

    NA

    NA

    SBB (Lot 8)

    Install Hot/Cold Domestic Water Lines & Seismic – INT-L3

    NA

    NA

    SBB (Lot 8)

    Install O/H Waste & Vent – INT-L3

    NA

    NA

    SBB (Lot 8)

    Install O/H Mechanical Equipment & Ductwork Mains & Seismic – INT-L3

    NA

    NA

    SBB (Lot 8)

    Install Backing – ELEC-L3

    NA

    NA

    SBB (Lot 8)

    Install Insulation & Inspect – ELEC-L3

    NA

    NA

    SBB (Lot 8)

    Hang Drywall and Inspect – ELEC-L3

    NA

    NA

    SBB (Lot 8)

    Hang 1st Side Top Down Drywall – INT-L4

    NA

    NA

    SBB (Lot 8)

    Install Insulation and Inspect – INT-L4

    NA

    NA

    SBB (Lot 8)

    Hang 2nd Side Top Down Drywall & Inspect– INT-L4

    NA

    NA

    SBB (Lot 8)

    Install Mechanical / FSD's – ELEC-L4

    NA

    NA

    SBB (Lot 8)

    Install In-Wall Electrical – ELEC-L4

    NA

    NA

    SBB (Lot 8)

    Install Backing – ELEC-L4

    NA

    NA

     

    Week of February 19, 2024

    Construction Activities 

     

    Location

    Activity

    Equipment Used

    Anticipated Disturbance

    SBB (Lot 8)

    Exterior Framing – East Elevation

    NA

    NA

    SBB (Lot 8)

    F/R/P Stair Treads/Landings – EXT-NE

    NA

    NA

    SBB (Lot 8)

    Exterior Framing - North Elevation – EXT-NE

    NA

    NA

    SBB (Lot 8)

    Rigid Insulation & Air Water Barrier – EXT-NE

    NA

    NA

    SBB (Lot 8)

    Field Measure for Curtain Wall – EXT-NE

    NA

    NA

    SBB (Lot 8)

    Flashings / Window Surrounds – EXT-NE

    NA

    NA

    SBB (Lot 8)

    Erect Steel Structure for Stairs – EXT-SW

    NA

    NA

    SBB (Lot 8)

    Rigid Insulation & Air Water Barrier– EXT-SW

    NA

    NA

    SBB (Lot 8)

    Exterior Framing - South Elevation– EXT-SW

    NA

    NA

    SBB (Lot 8)

    Field Measure for Curtain Wall– EXT-SW

    NA

    NA

    SBB (Lot 8)

    Flashings / Window Surrounds– EXT-SW

    NA

    NA

    SBB (Lot 8)

    Drainage Layer– EXT-SW

    NA

    NA

    SBB (Lot 8)

    Cement Board– EXT-SW

    NA

    NA

    SBB (Lot 8)

    Secondary Air Barrier– EXT-SW

    NA

    NA

    SBB (Lot 8)

    Erect Stairs– EXT-SW

    NA

    NA

    SBB (Lot 8)

    Install Ductwork Insulation– INT-L1

    NA

    NA

    SBB (Lot 8)

    Pressure Test Hot/Cold Supply & Return Mech Lines– INT-L1

    NA

    NA

    SBB (Lot 8)

    Insulate Test Hot/Cold Supply & Return Mech Lines– INT-L1

    NA

    NA

    SBB (Lot 8)

    HVAC Ductwork, Hook-up & Insulation – MECH-L1

    NA

    NA

    SBB (Lot 8)

    Controls Hook-up Equipment (Incl. Refrigerant Alarm) – MECH-L1

    NA

    NA

    SBB (Lot 8)

    HVAC Piping, Hook-up & Insulation – MECH-L1

    NA

    NA

    SBB (Lot 8)

    Plumbing Piping, Hook-up & Insulation – MECH-L1

    NA

    NA

    SBB (Lot 8)

    Set Distribution Board HDP-1A – MECH-L1

    NA

    NA

    SBB (Lot 8)

    Hang Drywall – INT-AUD

    NA

    NA

    SBB (Lot 8)

    Tape Walls – ELEC-AUD

    NA

    NA

    SBB (Lot 8)

    Fire Caulk Head of Wall – ELEC-AUD

    NA

    NA

    SBB (Lot 8)

    Prime & 1st Coat of Paint, Walls & Exposed Ceilings – ELEC-AUD

    NA

    NA

    SBB (Lot 8)

    Install Hot/Cold Supply & Return Mech Lines & Seismic – INT-L2

    NA

    NA

    SBB (Lot 8)

    Pressure Test Ductwork– INT-L2

    NA

    NA

    SBB (Lot 8)

    Install O/H Electrical Home Runs – INT-L2

    NA

    NA

    SBB (Lot 8)

    Tape Walls – ELEC-L3

    NA

    NA

    SBB (Lot 8)

    Fire Caulk Head of Wall– ELEC-L3

    NA

    NA

    SBB (Lot 8)

    Fire Tape – INT-L4

    NA

    NA

    SBB (Lot 8)

    Fire Caulk Head of Wall – INT-L4

    NA

    NA

    SBB (Lot 8)

    Install O/H Waste and Vent – INT-L4

    NA

    NA

    SBB (Lot 8)

    Install Insulation and Inspect – ELEC-L4

    NA

    NA

    SBB (Lot 8)

    Hang Drywall and Inspect – ELEC-L4

    NA

    NA

    SBB (Lot 8)

    Tape Walls – ELEC-L4

    NA

    NA

     

    Week of February 26, 2024

    Construction Activities 

     

    Location

    Activity

    Equipment Used

    Anticipated Disturbance

    SBB (Lot 8)

    Electrical Hook-up Equipment

    NA

    NA

    SBB (Lot 8)

    Install PV Panel Secondary Framing - North of E Line

    NA

    NA

    SBB (Lot 8)

    HVAC Piping, Hook-up & Insulation

    NA

    NA

    SBB (Lot 8)

    Flashings / Window Surrounds – EXT-L1

    NA

    NA

    SBB (Lot 8)

    Drainage Layer – EXT-L1

    NA

    NA

    SBB (Lot 8)

    Cement Board – EXT-L1

    NA

    NA

    SBB (Lot 8)

    Rigid Insulation & Air Water Barrier – EXT-NE

    NA

    NA

    SBB (Lot 8)

    Field Measure for Curtain Wall – EXT-NE

    NA

    NA

    SBB (Lot 8)

    Flashings / Window Surrounds – EXT-SW

    NA

    NA

    SBB (Lot 8)

    Drainage Layer – EXT-SW

    NA

    NA

    SBB (Lot 8)

    Install O/H Electrical Home Runs – INT-L1

    NA

    NA

    SBB (Lot 8)

    Install Ductwork Insulation – INT-L1

    NA

    NA

    SBB (Lot 8)

    HVAC Ductwork, Hook-up & Insulation – MECH-L1

    NA

    NA

    SBB (Lot 8)

    Controls Hook-up Equipment – MECH-L1

    NA

    NA

    SBB (Lot 8)

    HVAC Piping, Hook-up & Insulation – MECH-L1

    NA

    NA

    SBB (Lot 8)

    Plumbing Piping, Hook-up & Insulation – MECH-L1

    NA

    NA

    SBB (Lot 8)

    Install Hot/Cold Domestic Water Lines & Seismic – MECH-L1

    NA

    NA

    SBB (Lot 8)

    Tape Walls – MECH-L1

    NA

    NA

    SBB (Lot 8)

    Install O/H Supply & Return Ductwork Branch & Seismic – INT-L2

    NA

    NA

    SBB (Lot 8)

    Install Hot/Cold Domestic Water Lines & Seismic – INT-L3

    NA

    NA

    SBB (Lot 8)

    Install O/H Waste & Vent – INT-L3

    NA

    NA

    SBB (Lot 8)

    Install O/H Mechanical Equipment & Ductwork Mains & Seismic – INT-L3

    NA

    NA

    SBB (Lot 8)

    Tape Walls – ELEC-L3

    NA

    NA

     

    Current and Upcoming Anticipated Closures

    The following shutdown(s)/ closures are anticipated as indicated below. Updates to this schedule will be released weekly in the Project Construction Advisories until the work is complete.  Please contact John Franklin with any specific questions or concerns at john.franklin@ucr.edu.

     

    Description

    Location

    Duration & Date

    Impacted Buildings/ Facilities

    Lot 8

    Lot 8

    Permanently

    Lot 8

    Lot 43

    Lot 43

    Indefinitely

    Lot 43

    Anderson Park

    Anderson Park

    Indefinitely

    Anderson Park

  • 950592 UCR SBB - Construction Alert #65

    Current Week

    Construction Activities

     

    Location

    Activity

    Equipment Used

    Anticipated Disturbance

    SBB (Lot 8)

    Install PV Panel Structural Steel

    Crane

    Noise Due to Equipment

    SBB (Lot 8)

    Erect Stairs – EXT-NE

    NA

    NA

    SBB (Lot 8)

    Install Metal Decking – EXT-SW

    NA

    NA

    SBB (Lot 8)

    Install O/H Supply and Return Ductwork – L1

    NA

    NA

    SBB (Lot 8)

    Install O/H Supply and Return Mech Lines –L1

    NA

    NA

    SBB (Lot 8)

    Pressure Test Ductwork – INT-L1

    NA

    NA

    SBB (Lot 8)

    Tape Walls – ELEC-L1

    NA

    NA

    SBB (Lot 8)

    Fire Caulk Head of Wall – ELEC-L1

    NA

    NA

    SBB (Lot 8)

    Install In-Wall Plumbing – AUD

    NA

    NA

    SBB (Lot 8)

    Install Storm, Overflow, Sewer Lines and Seismic – AUD

    NA

    NA

    SBB (Lot 8)

    Install Mechanical / FSD’s – ELEC-AUD

    NA

    NA

    SBB (Lot 8)

    Install In-Wall Electrical – ELEC-AUD

    NA

    NA

    SBB (Lot 8)

    Install O/H Waste and Vent – INT-L2

    NA

    NA

    SBB (Lot 8)

    Install O/H Supply and Return Ductwork – INT-L2

    NA

    NA

    SBB (Lot 8)

    Tape Walls – ELEC-L2

    NA

    NA

    SBB (Lot 8)

    Fire Caulk Head of Wall – ELEC-L2

    NA

    NA

    SBB (Lot 8)

    Install Early MEP to Support Top Down Drywall - INT-L3

    NA

    NA

    SBB (Lot 8)

    Hang 1st Side Top Down Drywall - INT-L3

    NA

    NA

    SBB (Lot 8)

    Install Insulation & Inspect - INT-L3

    NA

    NA

    SBB (Lot 8)

    Fire Tape - INT-L3

    NA

    NA

    SBB (Lot 8)

    Fire Caulk Head of Wall - INT-L3

    NA

    NA

    SBB (Lot 8)

    Install Mechanical / FSD's – ELEC-L3

    NA

    NA

    SBB (Lot 8)

    Install In-Wall Electrical – ELEC-L3

    NA

    NA

    SBB (Lot 8)

    Frame Interference Walls & Install Door Frames – INT-L4

    NA

    NA

    SBB (Lot 8)

    Install Early MEP to Support Top Down Drywall – INT-L4

    NA

    NA

     

    Week of February 12, 2024

    Construction Activities 

     

    Location

    Activity

    Equipment Used

    Anticipated Disturbance

    SBB (Lot 8)

    Install PV Panel Secondary Framing - South of E Line

    Crane

    Noise Due to Equipment

    SBB (Lot 8)

    Set Mechanical Equipment - Roof

    Crane

    Noise Due to Equipment

    SBB (Lot 8)

    Flashings / Window Surrounds – EXT-L1

    NA

    NA

    SBB (Lot 8)

    Drainage Layer – EXT-L1

    NA

    NA

    SBB (Lot 8)

    Cement Board – EXT-L1

    NA

    NA

    SBB (Lot 8)

    Exterior Framing – East Elevation

    NA

    NA

    SBB (Lot 8)

    F/R/P Stair Treads/Landings – EXT-NE

    NA

    NA

    SBB (Lot 8)

    Exterior Framing - North Elevation – EXT-NE

    NA

    NA

    SBB (Lot 8)

    Rigid Insulation & Air Water Barrier – EXT-NE

    NA

    NA

    SBB (Lot 8)

    Field Measure for Curtain Wall – EXT-NE

    NA

    NA

    SBB (Lot 8)

    Flashings / Window Surrounds – EXT-NE

    NA

    NA

    SBB (Lot 8)

    Erect Steel Structure for Stairs – EXT-SW

    NA

    NA

    SBB (Lot 8)

    Rigid Insulation & Air Water Barrier– EXT-SW

    NA

    NA

    SBB (Lot 8)

    Exterior Framing - South Elevation– EXT-SW

    NA

    NA

    SBB (Lot 8)

    Field Measure for Curtain Wall– EXT-SW

    NA

    NA

    SBB (Lot 8)

    Flashings / Window Surrounds– EXT-SW

    NA

    NA

    SBB (Lot 8)

    Drainage Layer– EXT-SW

    NA

    NA

    SBB (Lot 8)

    Cement Board– EXT-SW

    NA

    NA

    SBB (Lot 8)

    Secondary Air Barrier– EXT-SW

    NA

    NA

    SBB (Lot 8)

    Erect Stairs– EXT-SW

    NA

    NA

    SBB (Lot 8)

    Install O/H Hot/Cold Supply and Return Branch Mech Lines – INT-L1

    NA

    NA

    SBB (Lot 8)

    Install Ductwork Insulation– INT-L1

    NA

    NA

    SBB (Lot 8)

    Pressure Test Hot/Cold Supply & Return Mech Lines– INT-L1

    NA

    NA

    SBB (Lot 8)

    Insulate Test Hot/Cold Supply & Return Mech Lines– INT-L1

    NA

    NA

    SBB (Lot 8)

    HVAC Ductwork, Hook-up & Insulation – MECH-L1

    NA

    NA

    SBB (Lot 8)

    Controls Hook-up Equipment (Incl. Refrigerant Alarm) – MECH-L1

    NA

    NA

    SBB (Lot 8)

    HVAC Piping, Hook-up & Insulation – MECH-L1

    NA

    NA

    SBB (Lot 8)

    Plumbing Piping, Hook-up & Insulation – MECH-L1

    NA

    NA

    SBB (Lot 8)

    Set Distribution Board HDP-1A – MECH-L1

    NA

    NA

    SBB (Lot 8)

    Frame Remaining Walls, Soffits & Hard lids – INT-L1

    NA

    NA

    SBB (Lot 8)

    Install Insulation & Inspect - AUD

    NA

    NA

    SBB (Lot 8)

    Install Backing – ELEC-AUD

    NA

    NA

    SBB (Lot 8)

    Install Insulation & Inspect – ELEC-AUD

    NA

    NA

    SBB (Lot 8)

    Hang Drywall & Inspect – ELEC-AUD

    NA

    NA

    SBB (Lot 8)

    Install Hot/Cold Domestic Water Lines & Seismic – INT-L3

    NA

    NA

    SBB (Lot 8)

    Install O/H Waste & Vent – INT-L3

    NA

    NA

    SBB (Lot 8)

    Install O/H Mechanical Equipment & Ductwork Mains & Seismic – INT-L3

    NA

    NA

    SBB (Lot 8)

    Install Backing – ELEC-L3

    NA

    NA

    SBB (Lot 8)

    Install Insulation & Inspect – ELEC-L3

    NA

    NA

    SBB (Lot 8)

    Hang Drywall and Inspect – ELEC-L3

    NA

    NA

    SBB (Lot 8)

    Hang 1st Side Top Down Drywall – INT-L4

    NA

    NA

    SBB (Lot 8)

    Install Insulation and Inspect – INT-L4

    NA

    NA

    SBB (Lot 8)

    Hang 2nd Side Top Down Drywall & Inspect– INT-L4

    NA

    NA

    SBB (Lot 8)

    Install Mechanical / FSD's – ELEC-L4

    NA

    NA

    SBB (Lot 8)

    Install In-Wall Electrical – ELEC-L4

    NA

    NA

    SBB (Lot 8)

    Install Backing – ELEC-L4

    NA

    NA

     

    Week of February 19, 2024

    Construction Activities 

     

    Location

    Activity

    Equipment Used

    Anticipated Disturbance

    SBB (Lot 8)

    Exterior Framing – East Elevation

    NA

    NA

    SBB (Lot 8)

    F/R/P Stair Treads/Landings – EXT-NE

    NA

    NA

    SBB (Lot 8)

    Exterior Framing - North Elevation – EXT-NE

    NA

    NA

    SBB (Lot 8)

    Rigid Insulation & Air Water Barrier – EXT-NE

    NA

    NA

    SBB (Lot 8)

    Field Measure for Curtain Wall – EXT-NE

    NA

    NA

    SBB (Lot 8)

    Flashings / Window Surrounds – EXT-NE

    NA

    NA

    SBB (Lot 8)

    Erect Steel Structure for Stairs – EXT-SW

    NA

    NA

    SBB (Lot 8)

    Rigid Insulation & Air Water Barrier– EXT-SW

    NA

    NA

    SBB (Lot 8)

    Exterior Framing - South Elevation– EXT-SW

    NA

    NA

    SBB (Lot 8)

    Field Measure for Curtain Wall– EXT-SW

    NA

    NA

    SBB (Lot 8)

    Flashings / Window Surrounds– EXT-SW

    NA

    NA

    SBB (Lot 8)

    Drainage Layer– EXT-SW

    NA

    NA

    SBB (Lot 8)

    Cement Board– EXT-SW

    NA

    NA

    SBB (Lot 8)

    Secondary Air Barrier– EXT-SW

    NA

    NA

    SBB (Lot 8)

    Erect Stairs– EXT-SW

    NA

    NA

    SBB (Lot 8)

    Install Ductwork Insulation– INT-L1

    NA

    NA

    SBB (Lot 8)

    Pressure Test Hot/Cold Supply & Return Mech Lines– INT-L1

    NA

    NA

    SBB (Lot 8)

    Insulate Test Hot/Cold Supply & Return Mech Lines– INT-L1

    NA

    NA

    SBB (Lot 8)

    HVAC Ductwork, Hook-up & Insulation – MECH-L1

    NA

    NA

    SBB (Lot 8)

    Controls Hook-up Equipment (Incl. Refrigerant Alarm) – MECH-L1

    NA

    NA

    SBB (Lot 8)

    HVAC Piping, Hook-up & Insulation – MECH-L1

    NA

    NA

    SBB (Lot 8)

    Plumbing Piping, Hook-up & Insulation – MECH-L1

    NA

    NA

    SBB (Lot 8)

    Set Distribution Board HDP-1A – MECH-L1

    NA

    NA

    SBB (Lot 8)

    Hang Drywall – INT-AUD

    NA

    NA

    SBB (Lot 8)

    Tape Walls – ELEC-AUD

    NA

    NA

    SBB (Lot 8)

    Fire Caulk Head of Wall – ELEC-AUD

    NA

    NA

    SBB (Lot 8)

    Prime & 1st Coat of Paint, Walls & Exposed Ceilings – ELEC-AUD

    NA

    NA

    SBB (Lot 8)

    Install Hot/Cold Supply & Return Mech Lines & Seismic – INT-L2

    NA

    NA

    SBB (Lot 8)

    Pressure Test Ductwork– INT-L2

    NA

    NA

    SBB (Lot 8)

    Install O/H Electrical Home Runs – INT-L2

    NA

    NA

    SBB (Lot 8)

    Tape Walls – ELEC-L3

    NA

    NA

    SBB (Lot 8)

    Fire Caulk Head of Wall– ELEC-L3

    NA

    NA

    SBB (Lot 8)

    Fire Tape – INT-L4

    NA

    NA

    SBB (Lot 8)

    Fire Caulk Head of Wall – INT-L4

    NA

    NA

    SBB (Lot 8)

    Install O/H Waste and Vent – INT-L4

    NA

    NA

    SBB (Lot 8)

    Install Insulation and Inspect – ELEC-L4

    NA

    NA

    SBB (Lot 8)

    Hang Drywall and Inspect – ELEC-L4

    NA

    NA

    SBB (Lot 8)

    Tape Walls – ELEC-L4

    NA

    NA

     

    Current and Upcoming Anticipated Closures

    The following shutdown(s)/ closures are anticipated as indicated below. Updates to this schedule will be released weekly in the Project Construction Advisories until the work is complete.  Please contact John Franklin with any specific questions or concerns at john.franklin@ucr.edu.

     

    Description

    Location

    Duration & Date

    Impacted Buildings/ Facilities

    Lot 8

    Lot 8

    Permanently

    Lot 8

    Lot 43

    Lot 43

    Indefinitely

    Lot 43

    Anderson Park

    Anderson Park

    Indefinitely

    Anderson Park

  • 950592 UCR SBB - Construction Alert #64

    Current Week

    Construction Activities

     

    Location

    Activity

    Equipment Used

    Anticipated Disturbance

    SBB (Lot 8)

    INSTALL PV STRUCTURAL STEEL

    NA

    NA

    SBB (Lot 8)

    PROCURE EXTERIOR FLASHINGS

    NA

    NA

    SBB (Lot 8)

    WEATHER BARRIER – EXT-NE

    NA

    NA

    SBB (Lot 8)

    ERECT STAIR – EXT-NE

    NA

    NA

    SBB (Lot 8) Concrete

    EXTERIOR FRAMING – EXT-NE

    NA

    NA

    SBB (Lot 8)

    INSTALL METAL DECKING – EXT-SW

    NA

    NA

    SBB (Lot 8)

    INSTALL HOT/COLD DOMESTIC WATER LINES AND SEISMIC – INT-L1

    NA

    NA

    SBB (Lot 8)

    INSTALL O/H SUPPLY AND RETURN DUCTWORK BRANCH AND SEISMIC – INT-L1

    NA

    NA

    SBB (Lot 8)

    PRESSURE TEST DUCTOWRK – INT-L1

    NA

    NA

    SBB (Lot 8)

    INSTALL O/H ELECTRICAL HOME RUNS – INT-L1

    NA

    NA

    SBB (Lot 8)

    FIRE CAULKING HEAD OF WALL – ELEC-L1

    NA

    NA

    SBB (Lot 8)

    INSTALL IN-WALL AND BRANCH ELECTRICAL – AUDITORIUM

    NA

    NA

    SBB (Lot 8)

    INSTALL IN-WALL LOW VOLTAGE – AUDITORIUM

    NA

    NA

    SBB (Lot 8)

    INSTALL IN-WALL PLUMBING – AUDITORIUM

    NA

    NA

    SBB (Lot 8)

    INSTALL INSULATION AND INSPECT – AUDITORIUM

    NA

    NA

    SBB (Lot 8)

    INSTALL MECHANICAL / FSD’s – AUDITORIUM

    NA

    NA

    SBB (Lot 8)

    INSTALL O/H WASTE AND VENT – ELEC-L2

    NA

    NA

    SBB (Lot 8)

    HANG DRYWALL AND INSPECT – ELEC-L2

    NA

    NA

    SBB (Lot 8)

    INSTALL INSULATION AND INSPECT – ELECT-L2

    NA

    NA

    SBB (Lot 8)

    TAPE WALLS – ELECT-L2

    NA

    NA

    SBB (Lot 8)

    INSTALL EARLY MEP TO SUPPORT TOP DOWN DRYWALL – INT-L3

    NA

    NA

    SBB (Lot 8)

    HANG 1ST SIDE TOP-DOWN DRYWALL – INT-L3

    NA

    NA

    SBB (Lot 8)

    HANG 2ND SIDE TOP-DOWN DRYWALL AND INSPECT – INT-L3

    NA

    NA

    SBB (Lot 8)

    INSTALL INSULATION AND INSPECT – INT-L3

    NA

    NA

    SBB (Lot 8)

    FIRE TAPE – INT-L3

    NA

    NA

    SBB (Lot 8)

    FIRE CAULKING HEAD OF WALL – INT-L3

    NA

    NA

    SBB (Lot 8)

    INSTALL MECHANICAL / FSD’s – ELEC-L3

    NA

    NA

    SBB (Lot 8)

    INSTALL IN-WALL ELECTRICAL – ELEC-L3

    NA

    NA

    SBB (Lot 8)

    INSTALL BACKING – ELEC-L3

    NA

    NA

    SBB (Lot 8)

    INSTALL EARLY MEP TO SUPPORT TOP-DOWN DRYWALL – INT-L4

    NA

    NA

    SBB (Lot 8)

    HANG 1ST SIDE TOP-DOWN DRYWALL – INT-L4

    NA

    NA

    SBB (Lot 8)

    INSTALL INSULATION AND INSPECT – INT-L4

    NA

    NA

    SBB (Lot 8)

    F/R/P TRANSFORMER YARD SLAB

    Concrete Pump

    Noise due to equipment

     

    Week of February 5, 2024

    Construction Activities 

     

    Location

    Activity

    Equipment Used

    Anticipated Disturbance

    SBB (Lot 8)

    INSTALL ROOFING AT MECHANICAL EQUIPMETN PAD

    NA

    NA

    SBB (Lot 8)

    INSTALL PV PANEL SECONDARY FRAMING

    NA

    NA

    SBB (Lot 8)

    FLASHING / WINDOW SURROUNDS – EXT-L1

    NA

    NA

    SBB (Lot 8)

    DRAINING LAYER – EXT-L1

    NA

    NA

    SBB (Lot 8)

    PRECAST PANELS – EXT-L1

    NA

    NA

    SBB (Lot 8)

    F/R/P TAIR TREAD/LANDINGS – EXT-NE

    NA

    NA

    SBB (Lot 8)

    EXTERIOR FRAMING – NORTH ELEVATION

    NA

    NA

    SBB (Lot 8)

    RIGID INSULATION AND AIR WATER BARRIER – EXT-NE

    NA

    NA

    SBB (Lot 8)

    ERECT STEEL STRUCTURE FOR STAIRS – EXT-SW

    NA

    NA

    SBB (Lot 8)

    INSTALL O/H HOT/COLD SUPPLY AND RETURN BRANCH MECH LINES – INT-L1

    NA

    NA

    SBB (Lot 8)

    INSTALL DUCTWORK INSULATION – INT-L1

    NA

    NA

    SBB (Lot 8)

    PRESSURE TEST HOT/COLD SUPPLY AND RETURN MECH LINES – INT-L1

    NA

    NA

    SBB (Lot 8)

    PRIME AND 1ST COAT OF PAINT, WALLS, AND EXPOSED CEILINGS – ELEC-L1

    NA

    NA

    SBB (Lot 8)

    INSTALL ELECTRICAL GEAR – ELEC-L1

    NA

    NA

    SBB (Lot 8)

    HANG DRYWALL – AUDITORIUM

    NA

    NA

    SBB (Lot 8)

    INSTALL IN-WALL ELECTRICAL – ELEC-AUD

    NA

    NA

    SBB (Lot 8)

    INSTALL BACKING – ELEC-AUD

    NA

    NA

    SBB (Lot 8)

    INSTALL INSULATION AND INSEPCT – ELEC-AUD

    NA

    NA

    SBB (Lot 8)

    HANG DRYWALL AND INSPECT – ELEC-AUD

    NA

    NA

    SBB (Lot 8)

    INSTALL O/H SUPPLY AND RETURN DUCTOWRK BRANCH AND SEISMIC – INT-L2

    NA

    NA

    SBB (Lot 8)

    FIRE CAULKING HEAD OF WALL – ELEC-L2

    NA

    NA

    SBB (Lot 8)

    PRIME AND FIRST COAT OF PAINT WALLS AND EXPOSED CEILINGS – ELEC-L2

    NA

    NA

    SBB (Lot 8)

    INSTALL HOT/COLD DOMESTIC WATER LINES – INT-L3

    NA

    NA

    SBB (Lot 8)

    INSTALL O/H WASTE AND VENT – INT-L3

    NA

    NA

    SBB (Lot 8)

    INSTALL O/H MECH EQUIPMENT AND DUCTWORK MAINS AND SEISMIC – INT-L3

    NA

    NA

    SBB (Lot 8)

    INSTALL INSULATION AND INSPECT – ELEC-L3

    NA

    NA

    SBB (Lot 8)

    HANG DRYWALL AND INSPECT – ELEC-L3

    NA

    NA

    SBB (Lot 8)

    TAPE WALLS – ELEC-L3

    NA

    NA

    SBB (Lot 8)

    HANG 2ND SIDE TOP DOWN DRYWALL AND INSPECT – INT-L4

    NA

    NA

    SBB (Lot 8)

    FIRE TAPE – INT-L4

    NA

    NA

    SBB (Lot 8)

    FIRE CAULKING HEAD OF WALL – INT-L4

    NA

    NA

    SBB (Lot 8)

    INSTALL MECHANICAL / FSD’s – ELEC-L4

    NA

    NA

    SBB (Lot 8)

    ISTALL IN-WALL ELECTRICAL – ELEC-L4

    NA

    NA

    SBB (Lot 8)

    INSTALL BACKING – ELEC-L4

    NA

    NA

     

    Week of February 12, 2024

    Construction Activities 

     

    Location

    Activity

    Equipment Used

    Anticipated Disturbance

    SBB (Lot 8)

    SET MECHANICAL EQUIPMENT – ROOF

    NA

    NA

    SBB (Lot 8)

    ELECTRICAL HOOKUP EQUPMENT – ROOF

    NA

    NA

    SBB (Lot 8)

    INSTALL PV PANEL SECONDARY FRAMING – ROOF

    NA

    NA

    SBB (Lot 8)

    FLASHING / WINDOW SURROUNDS – EXT-L1

    NA

    NA

    SBB (Lot 8)

    DRAINAGE LAYER – EXT-L1

    NA

    NA

    SBB (Lot 8)

    CEMENT BOARD – EXT-L1

    NA

    NA

    SBB (Lot 8)

    ELECRCIAL ROUGH-IN SOFFITS – EXT-L1

    NA

    NA

    SBB (Lot 8)

    SOFFIT SHEATHING – EXT-L1

    NA

    NA

    SBB (Lot 8)

    F/R/P STAIR TREADS / LANDINGS

    NA

    NA

    SBB (Lot 8)

    EXTERIOR FRAMING – NORTH ELECATION – EXT-L1

    NA

    NA

    SBB (Lot 8)

    RIGID INSULATION AND AIR WATER BARRIER – EXT-NE

    NA

    NA

    SBB (Lot 8)

    FIELD MEASURE FOR CURTAIN WALL – EXT-NE

    NA

    NA

    SBB (Lot 8)

    ERRECT STEEL STRUCTURE FOR STAIRS

    NA

    NA

    SBB (Lot 8)

    RIGID INSULATION AND AIR WATER BARRIER – EXT-SW

    NA

    NA

    SBB (Lot 8)

    EXTERIOR FRAMING – SOUTH ELEVATION

    NA

    NA

    SBB (Lot 8)

    FIELD MEASURE FOR CURTAIN WALL

    NA

    NA

    SBB (Lot 8)

    FLASHINGS / WINDOW SURROUNDS – EXT-SW

    NA

    NA

    SBB (Lot 8)

    INSTALL O/H ELECTRICAL HOME RUNS – INT-L1

    NA

    NA

    SBB (Lot 8)

    INSTALL O/H HOT/COLD SUPPLY AND RETURN BRNCH MECH LINES – INT-L1

    NA

    NA

    SBB (Lot 8)

    INSTALL DUCTWORK INSULATION – INT-L1

    NA

    NA

    SBB (Lot 8)

    PRESSURE TEST HOT/COLD SUPPLY AND RETURN MECH LINES – INT-L1

    NA

    NA

    SBB (Lot 8)

    SET MECHANICAL AND PLUMBING EQUIPMENT – MECH-L1

    NA

    NA

    SBB (Lot 8)

    HVAC DUCTWORK, HOOKUP, AND INSULATION – MECH-L1

    NA

    NA

    SBB (Lot 8)

    CONTROLS HOOK-UP EQUIPMENT – MECH-L1

    NA

    NA

    SBB (Lot 8)

    HANG DRYWALL AND INSPECT – ELEC-L3

    NA

    NA

    SBB (Lot 8)

    TAPE WALLS – ELEC-L3

    NA

    NA

    SBB (Lot 8)

    HANG 1ST SIDE TOP DOWN DRYWALL – INT-L4

    NA

    NA

    SBB (Lot 8)

    INSTALL INSULATION AND INSPECT – INT-L4

    NA

    NA

    SBB (Lot 8)

    HANG 2ND SIDE TOP DOWN DRYWALL AND INSPECT – INT-L4

    NA

    NA

    SBB (Lot 8)

    FIRE TAPE – INT-L4

    NA

    NA

    SBB (Lot 8)

    FIRE CAULK HEAD OF WALL – INT-L4

    NA

    NA

    SBB (Lot 8)

    INSTALL IN-WALL ELECTRICAL – ELEC-L4

    NA

    NA

    SBB (Lot 8)

    INSTALL BACKING – ELEC-L4

    NA

    NA

    SBB (Lot 8)

    INSTALL COMMUNICATIONS DUCTBANK AND VAULT FROM MH-14 TO SBB POC

    NA

    NA

     

    Current and Upcoming Anticipated Closures

    The following shutdown(s)/ closures are anticipated as indicated below. Updates to this schedule will be released weekly in the Project Construction Advisories until the work is complete.  Please contact John Franklin with any specific questions or concerns at john.franklin@ucr.edu.

     

    Description

    Location

    Duration & Date

    Impacted Buildings/ Facilities

    Lot 8

    Lot 8

    Permanently

    Lot 8

    Lot 43

    Lot 43

    Indefinitely

    Lot 43

    Anderson Park

    Anderson Park

    Indefinitely

    Anderson Park

  • 950592 UCR SBB - Construction Alert #63

    Current Week

    Construction Activities

     

    Location

    Activity

    Equipment Used

    Anticipated Disturbance

    SBB (Lot 8) 

    INSTALL MECHANICAL DUCT / PIPE SUPPORTS - ROOF

    NA

    NA

    SBB (Lot 8) 

    RIGID INSULATION AND AIR WATER BARRIER – EXT-L1 

    NA

    NA

    SBB (Lot 8)

    FIELD MEASURE FOR CURTAIN WALL – EXT-L1

    NA

    NA

    SBB (Lot 8)

    SOFFIT SHEATHING – EXT-L1

    NA

    NA

    SBB (Lot 8) Concrete

    SET SCAFFOLDS FOR LEVEL TO ROOF – EXT-NE

    NA

    NA

    SBB (Lot 8)

    MISC IN-WALL STEEL FOR CANOPY – EXT-NE

    NA

    NA

    SBB (Lot 8)

    ERECT STEEL STRUCTURE FOR STAIRS – EXT-NE

    NA

    NA

    SBB (Lot 8)

    ERECT SCAFFOLD EAST ELEVATION – EXT-NE

    NA

    NA

    SBB (Lot 8)

    SET SCAFFOLD FOR LEVEL 3 TO ROOF

    NA

    NA

    SBB (Lot 8)

    INSTALL IN-WALL ELECTRICAL – ELEC-L1

    NA

    NA

    SBB (Lot 8)

    INSTALL INSULATION AND ISNEPCT – ELEC-L1

    NA

    NA

    SBB (Lot 8)

    HANG DRYWALL AND ISNTEPCT – ELEC-L1

    NA

    NA

    SBB (Lot 8)

    TAPE WALLS – ELEC-L1

    NA

    NA

    SBB (Lot 8)

    SET MECHANICAL AND PLUMBING EQUIPMENT – MECH-L1

    NA

    NA

    SBB (Lot 8)

    FRAME WALLS – AUDITORIUM

    NA

    NA

    SBB (Lot 8)

    TOP-DOWN DRYWALL AND HEAD OF WALL – AUDITORIUM

    NA

    NA

    SBB (Lot 8) 

    FIRE TAPE – INT-L2

    NA

    NA

    SBB (Lot 8)

    FIRE CAULK HEAD OF WALL – INT-L2

    NA

    NA

    SBB (Lot 8)

    INSTALL HOT/COLD DOMESTIC WATER LINES AND SEISMIC – INT-L2

    NA

    NA

    SBB (Lot 8)

    INSTALL O/H MECHANICAL EQUIPMENT AND DUCTWORK MAINS AND SEISMIC – INT-L2

    NA

    NA

    SBB (Lot 8)

    INSTALL MECHANICAL / FSDs – ELEC-L2

    NA

    NA

    SBB (Lot 8)

    INSTALL BACKING – ELEC-L2

    NA

    NA

    SBB (Lot 8)

    FRAME INTERFERENCE WALLS AND INSTALL DOOR FRAMES – INT-L3

    NA

    NA

    SBB (Lot 8)

    INSTALL FIRE SPRINKLER MAINS, BRANCHES, AND SEISIC – INT-L3

    NA

    NA

    SBB (Lot 8)

    INSTALL STORM, OVERFLOW, SEWER LINES, AND SEISMIC – INT-L3

    NA

    NA

    SBB (Lot 8)

    TRANSFORMER YARD FENCE FOOTING

    NA

    NA

     

    Week of January 29, 2024

    Construction Activities 

     

    Location

    Activity

    Equipment Used

    Anticipated Disturbance

    SBB (Lot 8) 

    INSTALL PV STRUCTURAL STEEL

    NA

    NA

    SBB (Lot 8) 

    PROCURE EXTERIOR FLASHINGS

    NA

    NA

    SBB (Lot 8) 

    WEATHER BARRIER – EXT-NE

    NA

    NA

    SBB (Lot 8)

    ERECT STAIR – EXT-NE

    NA

    NA

    SBB (Lot 8)

    EXTERIOR FRAMING – EXT-NE

    NA

    NA

    SBB (Lot 8) 

    INSTALL METAL DECKING – EXT-SW

    NA

    NA

    SBB (Lot 8)

    INSTALL HOT/COLD DOMESTIC WATER LINES AND SEISMIC – INT-L1

    NA

    NA

    SBB (Lot 8)

    INSTALL O/H SUPPLY AND RETURN DUCTWORK BRANCH AND SEISMIC – INT-L1

    NA

    NA

    SBB (Lot 8)

    PRESSURE TEST DUCTOWRK – INT-L1

    NA

    NA

    SBB (Lot 8)

    INSTALL O/H ELECTRICAL HOME RUNS – INT-L1

    NA

    NA

    SBB (Lot 8)

    FIRE CAULKING HEAD OF WALL – ELEC-L1

    NA

    NA

    SBB (Lot 8)

    INSTALL IN-WALL AND BRANCH ELECTRICAL – AUDITORIUM

    NA

    NA

    SBB (Lot 8)

    INSTALL IN-WALL LOW VOLTAGE – AUDITORIUM

    NA

    NA

    SBB (Lot 8) 

    INSTALL IN-WALL PLUMBING – AUDITORIUM

    NA

    NA

    SBB (Lot 8)

    INSTALL INSULATION AND INSPECT – AUDITORIUM

    NA

    NA

    SBB (Lot 8)

    INSTALL MECHANICAL / FSD’s – AUDITORIUM 

    NA

    NA

    SBB (Lot 8)

    INSTALL O/H WASTE AND VENT – ELEC-L2

    NA

    NA

    SBB (Lot 8)

    HANG DRYWALL AND INSPECT – ELEC-L2

    NA

    NA

    SBB (Lot 8)

    INSTALL INSULATION AND INSPECT – ELECT-L2

    NA

    NA

    SBB (Lot 8)

    TAPE WALLS – ELECT-L2

    NA

    NA

    SBB (Lot 8)

    INSTALL EARLY MEP TO SUPPORT TOP DOWN DRYWALL – INT-L3

    NA

    NA

    SBB (Lot 8)

    HANG 1ST SIDE TOP-DOWN DRYWALL – INT-L3

    NA

    NA

    SBB (Lot 8)

    HANG 2ND SIDE TOP-DOWN DRYWALL AND INSPECT – INT-L3

    NA

    NA

    SBB (Lot 8)

    INSTALL INSULATION AND INSPECT – INT-L3

    NA

    NA

    SBB (Lot 8)

    FIRE TAPE – INT-L3

    NA

    NA

    SBB (Lot 8)

    FIRE CAULKING HEAD OF WALL – INT-L3

    NA

    NA

    SBB (Lot 8)

    INSTALL MECHANICAL / FSD’s – ELEC-L3

    NA

    NA

    SBB (Lot 8)

    INSTALL IN-WALL ELECTRICAL – ELEC-L3

    NA

    NA

    SBB (Lot 8)

    INSTALL BACKING – ELEC-L3

    NA

    NA

    SBB (Lot 8)

    INSTALL EARLY MEP TO SUPPORT TOP-DOWN DRYWALL – INT-L4

    NA

    NA

    SBB (Lot 8)

    HANG 1ST SIDE TOP-DOWN DRYWALL – INT-L4

    NA

    NA

    SBB (Lot 8)

    INSTALL INSULATION AND INSPECT – INT-L4

    NA

    NA

    SBB (Lot 8)

    F/R/P TRANSFORMER YARD SLAB

    NA

    NA

     

    Week of February 5, 2024

    Construction Activities 

     

    Location

    Activity

    Equipment Used

    Anticipated Disturbance

    SBB (Lot 8) 

    INSTALL ROOFING AT MECHANICAL EQUIPMETN PAD 

    NA

    NA

    SBB (Lot 8) 

    INSTALL PV PANEL SECONDARY FRAMING

    NA

    NA

    SBB (Lot 8) 

    FLASHING / WINDOW SURROUNDS – EXT-L1

    NA

    NA

    SBB (Lot 8)

    DRAINING LAYER – EXT-L1

    NA

    NA

    SBB (Lot 8)

    PRECAST PANELS – EXT-L1

    NA

    NA

    SBB (Lot 8) 

    F/R/P TAIR TREAD/LANDINGS – EXT-NE

    NA

    NA

    SBB (Lot 8)

    EXTERIOR FRAMING – NORTH ELEVATION 

    NA

    NA

    SBB (Lot 8)

    RIGID INSULATION AND AIR WATER BARRIER – EXT-NE

    NA

    NA

    SBB (Lot 8)

    ERECT STEEL STRUCTURE FOR STAIRS – EXT-SW

    NA

    NA

    SBB (Lot 8)

    INSTALL O/H HOT/COLD SUPPLY AND RETURN BRANCH MECH LINES – INT-L1

    NA

    NA

    SBB (Lot 8)

    INSTALL DUCTWORK INSULATION – INT-L1

    NA

    NA

    SBB (Lot 8)

    PRESSURE TEST HOT/COLD SUPPLY AND RETURN MECH LINES – INT-L1

    NA

    NA

    SBB (Lot 8)

    PRIME AND 1ST COAT OF PAINT, WALLS, AND EXPOSED CEILINGS – ELEC-L1

    NA

    NA

    SBB (Lot 8) 

    INSTALL ELECTRICAL GEAR – ELEC-L1

    NA

    NA

    SBB (Lot 8)

    HANG DRYWALL – AUDITORIUM

    NA

    NA

    SBB (Lot 8)

    INSTALL IN-WALL ELECTRICAL – ELEC-AUD

    NA

    NA

    SBB (Lot 8)

    INSTALL BACKING – ELEC-AUD

    NA

    NA

    SBB (Lot 8)

    INSTALL INSULATION AND INSEPCT – ELEC-AUD

    NA

    NA

    SBB (Lot 8)

    HANG DRYWALL AND INSPECT – ELEC-AUD

    NA

    NA

    SBB (Lot 8)

    INSTALL O/H SUPPLY AND RETURN DUCTOWRK BRANCH AND SEISMIC – INT-L2

    NA

    NA

    SBB (Lot 8)

    FIRE CAULKING HEAD OF WALL – ELEC-L2

    NA

    NA

    SBB (Lot 8)

    PRIME AND FIRST COAT OF PAINT WALLS AND EXPOSED CEILINGS – ELEC-L2

    NA

    NA

    SBB (Lot 8)

    INSTALL HOT/COLD DOMESTIC WATER LINES – INT-L3

    NA

    NA

    SBB (Lot 8)

    INSTALL O/H WASTE AND VENT – INT-L3

    NA

    NA

    SBB (Lot 8)

    INSTALL O/H MECH EQUIPMENT AND DUCTWORK MAINS AND SEISMIC – INT-L3

    NA

    NA

    SBB (Lot 8)

    INSTALL INSULATION AND INSPECT – ELEC-L3

    NA

    NA

    SBB (Lot 8)

    HANG DRYWALL AND INSPECT – ELEC-L3

    NA

    NA

    SBB (Lot 8)

    TAPE WALLS – ELEC-L3

    NA

    NA

    SBB (Lot 8)

    HANG 2ND SIDE TOP DOWN DRYWALL AND INSPECT – INT-L4

    NA

    NA

    SBB (Lot 8)

    FIRE TAPE – INT-L4

    NA

    NA

    SBB (Lot 8)

    FIRE CAULKING HEAD OF WALL – INT-L4

    NA

    NA

    SBB (Lot 8)

    INSTALL MECHANICAL / FSD’s – ELEC-L4

    NA

    NA

    SBB (Lot 8)

    ISTALL IN-WALL ELECTRICAL – ELEC-L4

    NA

    NA

    SBB (Lot 8)

    INSTALL BACKING – ELEC-L4

    NA

    NA

     

    Current and Upcoming Anticipated Closures

    The following shutdown(s)/ closures are anticipated as indicated below. Updates to this schedule will be released weekly in the Project Construction Advisories until the work is complete.  Please contact John Franklin with any specific questions or concerns at john.franklin@ucr.edu.

     

    Description

    Location

    Duration & Date

    Impacted Buildings/ Facilities

    Lot 8

    Lot 8

    Permanently 

    Lot 8

    Lot 43

    Lot 43

    Indefinitely 

    Lot 43

    Anderson Park

    Anderson Park

    Indefinitely

    Anderson Park

  • 950592 UCR SBB - Construction Alert #62

    Current Week

    Construction Activities

     

    Location

    Activity

    Equipment Used

    Anticipated Disturbance

    SBB (Lot 8) Concrete

    F/R/P Walls at Transformer Yard

    Crane and Concrete Pump

    Noise due to equipment

    SBB (Lot 8) Concrete

    F/R/P Transformer Yard Slab

    Crane and Concrete Pump

    Noise due to equipment

    SBB (Lot 8)

    Vapor Retarder Sheet Air Barrier

    NA

    NA

    SBB (Lot 8)

    Flashing / Window Surrounds – Ext-L1

    NA

    NA

    SBB (Lot 8)

    Install Temp Roofing Low Roofs – Ext NE

    NA

    NA

    SBB (Lot 8)

    Erect Steel Structure for Stairs – Ext NE

    NA

    NA

    SBB (Lot 8)

    Set Scaffold to Roof – Ext NE

    NA

    NA

    SBB (Lot 8)

    Misc In-Wall Steel for Canopy – Ext NE

    NA

    NA

    SBB (Lot 8)

    Install Temp Roofing at Low Roofs– Ext SW

    NA

    NA

    SBB (Lot 8) Concrete

    Pour Grand Stair – Int-L1

    Concrete Pump

    Noise due to equipment

    SBB (Lot 8) Concrete

    Strip Grand Stair – Int-L1

    NA

    NA

    SBB (Lot 8)

    Install O/H Mechanical Equipment and Ductwork Mains and Seismic – Int-L1

    NA

    NA

    SBB (Lot 8)

    Install In-Wall Electrical – Int-L1

    NA

    NA

    SBB (Lot 8)

    Install Backing – Int-L1

    NA

    NA

    SBB (Lot 8)

    Layout Framing and Install Top Track – Int-Auditorium

    NA

    NA

    SBB (Lot 8)

    Hang 2nd Side Top Down Drywall and Inspect – Int-L2

    NA

    NA

    SBB (Lot 8)

    Fire Tape – Int-L2

    NA

    NA

    SBB (Lot 8)

    Fire Caulking Head of Wall – Int-L2

    NA

    NA

    SBB (Lot 8)

    Frame Interference Walls and Install Door Frames – Int-L3

    NA

    NA

    SBB (Lot 8)

    Concrete

    Pour CIP Stair to L4

    Concrete Pump

    Noise due to equipment

    SBB (Lot 8)

    Concrete

    Strip CIP Stair to L4

    NA

    NA

    SBB (Lot 8)

    Install Storm, Overflow, Sewer Lines and Seismic – Int-L4

    NA

    NA

     

    Week of January 22, 2023

    Construction Activities 

     

    Location

    Activity

    Equipment Used

    Anticipated Disturbance

    SBB (Lot 8)

    Install Roofing at mechanical Equipment Pad

    NA

    NA

    SBB (Lot 8)

    Drainage Layer – Ext-L1

    NA

    NA

    SBB (Lot 8)

    Cement Board – Ext-L1

    NA

    NA

    SBB (Lot 8)

    Weather Barrier – Ext-L1

    NA

    NA

    SBB (Lot 8) Concrete

    Erect Stairs – Ext-NE

    NA

    NA

    SBB (Lot 8)

    Exterior Framing – Ext-NE

    NA

    NA

    SBB (Lot 8)

    Erect Tube Steel Structure – Ext-SW

    NA

    NA

    SBB (Lot 8)

    Set Scaffold for Level 3 to Roof – Ext-SW

    NA

    NA

    SBB (Lot 8)

    Install Metal Decking – Ext-SW

    NA

    NA

    SBB (Lot 8)

    Install O/H Supply and Return Ductwork Branch and Seismic – Int-L1

    NA

    NA

    SBB (Lot 8)

    Install Hot and Cold Supply and Return Mech Lunes and Seismic – Int-L1

    NA

    NA

    SBB (Lot 8)

    Install Insulation and Inspect – Elec-L1

    NA

    NA

    SBB (Lot 8)

    Hang Drywall and Inspect – Elec-L1

    NA

    NA

    SBB (Lot 8)

    Tape Walls – Elec-L1

    NA

    NA

    SBB (Lot 8)

    Frame Walls – Int-Auditorium

    NA

    NA

    SBB (Lot 8)

    Install O/H Waste and Vent – Int-L2

    NA

    NA

    SBB (Lot 8)

    Install O/H Mechanical Equipment and Ductwork Mains and Seismic – Int-L2

    NA

    NA

    SBB (Lot 8)

    Install Mechanical / FSD’s – Elec-L2

    NA

    NA

    SBB (Lot 8)

    Install Early MEP to support Top Down Drywall – Int-L3

    NA

    NA

    SBB (Lot 8)

    Hang 1st Side Top Down Drywall – Int-L3

    NA

    NA

    SBB (Lot 8)

    Install Insulation and Inspect – Int-L3

    NA

    NA

    SBB (Lot 8)

    Hang 2nd Side Top Down Drywall and Inspect – Int-L3

    NA

    NA

    SBB (Lot 8)

    Layout Framing and Install Top Track – Second Pass – Int-L3

    NA

    NA

    SBB (Lot 8)

    Frame Interference Walls and Install Door Frames – Second Pass – Int-L3

    NA

    NA

    SBB (Lot 8)

    Install Fire Sprinkler Mains, Branches and Seismic – Int-L3

    NA

    NA

    SBB (Lot 8)

    Install Storm, Overflow, Sewer Lines and Seismic – Int-L3

    NA

    NA

    SBB (Lot 8)

    Layout Framing and Install Top Track – Int-L4

    NA

    NA

     

    Week of January 29, 2023

    Construction Activities 

     

    Location

    Activity

    Equipment Used

    Anticipated Disturbance

    SBB (Lot 8)

    Drainage Layer – EXT-L1

    NA

    NA

    SBB (Lot 8)

    Cement Board – EXT-L1

    NA

    NA

    SBB (Lot 8)

    Secondary Air Barrier – EXT-L1

    NA

    NA

    SBB (Lot 8)

    Precast Panels – EXT-L1

    NA

    NA

    SBB (Lot 8)

    Exterior Framing – West Elevation

    NA

    NA

    SBB (Lot 8)

    Install Hot/Cold Supply and Return Mech Lines and Seismic

    NA

    NA

    SBB (Lot 8)

    Tape Walls – Elec-L1

    NA

    NA

    SBB (Lot 8)

    Install O/H Supply and Return Ductwork – INT-L1

     

     

    SBB (Lot 8)

    Install Hot/Cold Domestic Water Lines and Seismic – INT-L2

    NA

    NA

    SBB (Lot 8)

    Install Fire Sprinkler Mains branches and Seismic – INT-L4

    NA

    NA

    SBB (Lot 8)

    Install in-wall and branch electrical – Auditorium

    NA

    NA

    SBB (Lot 8)

    Install In-wall Low Voltage – Auditorium

    NA

    NA

    SBB (Lot 8)

    Install Storm overflow, sewer lines, and seismic – INT-L3

    NA

    NA

     

     

    Current and Upcoming Anticipated Closures

    The following shutdown(s)/ closures are anticipated as indicated below. Updates to this schedule will be released weekly in the Project Construction Advisories until the work is complete.  Please contact John Franklin with any specific questions or concerns at john.franklin@ucr.edu.

     

    Description

    Location

    Duration & Date

    Impacted Buildings/ Facilities

    Lot 8

    Lot 8

    Permanently

    Lot 8

    Lot 43

    Lot 43

    Indefinitely

    Lot 43

    Anderson Park

    Anderson Park

    Indefinitely

    Anderson Park

  • 950592 UCR SBB - Construction Alert #61

    Current Week

    Construction Activities

     

    Location

    Activity

    Equipment Used

    Anticipated Disturbance

    SBB (Lot 8) Concrete

    Cure Deck for Moisture Testing

    NA

    NA

    SBB (Lot 8) Concrete

    MEP Stub-up Penetrations

    NA

    NA

    SBB (Lot 8)

    Install Mechanical Duct Pipe Supports

    NA

    NA

    SBB (Lot 8)

    Install Roof Drains

    NA

    NA

    SBB (Lot 8)

    Soffit Framing – Ext-L1

    NA

    NA

    SBB (Lot 8)

    Rigid Insulation and Air water barrier – Ext-L1

    NA

    NA

    SBB (Lot 8)

    Electrical Rough-in Soffits – Ext-L1

    NA

    NA

    SBB (Lot 8)

    Soffit Sheathing – Ext-L1

    NA

    NA

    SBB (Lot 8) Concrete

    Rebar Grand Stair – Int-L1

    NA

    NA

    SBB (Lot 8)

    Install O/H waste and vent – Int-L1

    NA

    NA

    SBB (Lot 8)

    Install Mechanical / FSDs – Elec-L1

    NA

    NA

    SBB (Lot 8)

    Hang 1st Side Top Down Drywall – Int-L2

    NA

    NA

    SBB (Lot 8)

    Install Insulation and Inspect – Int-L2

    NA

    NA

    SBB (Lot 8)

    Install Fire Sprinkler Mains, Branch and Seismic – Int-L2

    NA

    NA

    SBB (Lot 8) Concrete

    Rebar CIP Stair to L4

    NA

    NA

    SBB (Lot 8)

    Install Fire Water – College Place to SBB POC

    NA

    NA

    SBB (Lot 8) Concrete

    F/R/P Walls at Transformer Yard

    Crane and Concrete Pump

    Noise due to equipment

    SBB (Lot 8) Concrete

    F/R/P Transformer Yard Slab

    Crane and Concrete Pump

    Noise due to equipment

     

    Week of January 15, 2023

    Construction Activities 

     

    Location

    Activity

    Equipment Used

    Anticipated Disturbance

    SBB (Lot 8) Concrete

    F/R/P Walls at Transformer Yard

    Crane and Concrete Pump

    Noise due to equipment

    SBB (Lot 8) Concrete

    F/R/P Transformer Yard Slab

    Crane and Concrete Pump

    Noise due to equipment

    SBB (Lot 8)

    Vapor Retarder Sheet Air Barrier

    NA

    NA

    SBB (Lot 8)

    Flashing / Window Surrounds – Ext-L1

    NA

    NA

    SBB (Lot 8)

    Install Temp Roofing Low Roofs – Ext NE

    NA

    NA

    SBB (Lot 8)

    Erect Steel Structure for Stairs – Ext NE

    NA

    NA

    SBB (Lot 8)

    Set Scaffold to Roof – Ext NE

    NA

    NA

    SBB (Lot 8)

    Misc In-Wall Steel for Canopy – Ext NE

    NA

    NA

    SBB (Lot 8)

    Install Temp Roofing at Low Roofs– Ext SW

    NA

    NA

    SBB (Lot 8) Concrete

    Pour Grand Stair – Int-L1

    Concrete Pump

    Noise due to equipment

    SBB (Lot 8) Concrete

    Strip Grand Stair – Int-L1

    NA

    NA

    SBB (Lot 8)

    Install O/H Mechanical Equipment and Ductwork Mains and Seismic – Int-L1

    NA

    NA

    SBB (Lot 8)

    Install In-Wall Electrical – Int-L1

    NA

    NA

    SBB (Lot 8)

    Install Backing – Int-L1

    NA

    NA

    SBB (Lot 8)

    Layout Framing and Install Top Track – Int-Auditorium

    NA

    NA

    SBB (Lot 8)

    Hang 2nd Side Top Down Drywall and Inspect – Int-L2

    NA

    NA

    SBB (Lot 8)

    Fire Tape – Int-L2

    NA

    NA

    SBB (Lot 8)

    Fire Caulking Head of Wall – Int-L2

    NA

    NA

    SBB (Lot 8)

    Frame Interference Walls and Install Door Frames – Int-L3

    NA

    NA

    SBB (Lot 8)

    Concrete

    Pour CIP Stair to L4

    Concrete Pump

    Noise due to equipment

    SBB (Lot 8)

    Concrete

    Strip CIP Stair to L4

    NA

    NA

    SBB (Lot 8)

    Install Storm, Overflow, Sewer Lines and Seismic – Int-L4

    NA

    NA

     

    Week of January 22, 2023

    Construction Activities 

     

    Location

    Activity

    Equipment Used

    Anticipated Disturbance

    SBB (Lot 8)

    Install Roofing at mechanical Equipment Pad

    NA

    NA

    SBB (Lot 8)

    Drainage Layer – Ext-L1

    NA

    NA

    SBB (Lot 8)

    Cement Board – Ext-L1

    NA

    NA

    SBB (Lot 8)

    Weather Barrier – Ext-L1

    NA

    NA

    SBB (Lot 8) Concrete

    Erect Stairs – Ext-NE

    NA

    NA

    SBB (Lot 8)

    Exterior Framing – Ext-NE

    NA

    NA

    SBB (Lot 8)

    Erect Tube Steel Structure – Ext-SW

    NA

    NA

    SBB (Lot 8)

    Set Scaffold for Level 3 to Roof – Ext-SW

    NA

    NA

    SBB (Lot 8)

    Install Metal Decking – Ext-SW

    NA

    NA

    SBB (Lot 8)

    Install O/H Supply and Return Ductwork Branch and Seismic – Int-L1

    NA

    NA

    SBB (Lot 8)

    Install Hot and Cold Supply and Return Mech Lunes and Seismic – Int-L1

    NA

    NA

    SBB (Lot 8)

    Install Insulation and Inspect – Elec-L1

    NA

    NA

    SBB (Lot 8)

    Hang Drywall and Inspect – Elec-L1

    NA

    NA

    SBB (Lot 8)

    Tape Walls – Elec-L1

    NA

    NA

    SBB (Lot 8)

    Frame Walls – Int-Auditorium

    NA

    NA

    SBB (Lot 8)

    Install O/H Waste and Vent – Int-L2

    NA

    NA

    SBB (Lot 8)

    Install O/H Mechanical Equipment and Ductwork Mains and Seismic – Int-L2

    NA

    NA

    SBB (Lot 8)

    Install Mechanical / FSD’s – Elec-L2

    NA

    NA

    SBB (Lot 8)

    Install Early MEP to support Top Down Drywall – Int-L3

    NA

    NA

    SBB (Lot 8)

    Hang 1st Side Top Down Drywall – Int-L3

    NA

    NA

    SBB (Lot 8)

    Install Insulation and Inspect – Int-L3

    NA

    NA

    SBB (Lot 8)

    Hang 2nd Side Top Down Drywall and Inspect – Int-L3

    NA

    NA

    SBB (Lot 8)

    Layout Framing and Install Top Track – Second Pass – Int-L3

    NA

    NA

    SBB (Lot 8)

    Frame Interference Walls and Install Door Frames – Second Pass – Int-L3

    NA

    NA

    SBB (Lot 8)

    Install Fire Sprinkler Mains, Branches and Seismic – Int-L3

    NA

    NA

    SBB (Lot 8)

    Install Storm, Overflow, Sewer Lines and Seismic – Int-L3

    NA

    NA

    SBB (Lot 8)

    Layout Framing and Install Top Track – Int-L4

    NA

    NA

     

    Current and Upcoming Anticipated Closures

    The following shutdown(s)/ closures are anticipated as indicated below. Updates to this schedule will be released weekly in the Project Construction Advisories until the work is complete.  Please contact John Franklin with any specific questions or concerns at john.franklin@ucr.edu.

     

    Description

    Location

    Duration & Date

    Impacted Buildings/ Facilities

    Lot 8

    Lot 8

    Permanently

    Lot 8

    Lot 43

    Lot 43

    Indefinitely

    Lot 43

    Anderson Park

    Anderson Park

    Indefinitely

    Anderson Park

  • 950592 UCR SBB - Construction Alert #60

    Current Week

    Construction Activities

     

    Location

    Activity

    Equipment Used

    Anticipated Disturbance

    SBB (Lot 8) Concrete

    Underslab Electrical Rough-in - Auditorium Steps

    NA

    NA

    SBB (Lot 8) Concrete

    Form Steps - Auditorium

    NA

    NA

    SBB (Lot 8)

    QC / Inspection – Auditorium

    NA

    NA

    SBB (Lot 8)

    Strip and Haul Off Form system

    Crane

    Noise due to Equipment

    SBB (Lot 8)

    Install Roofing at Mechanical Equipment Pad

    NA

    NA

    SBB (Lot 8)

    Install Mechanical Duct Pipe Supports – Roof

    NA

    NA

    SBB (Lot 8)

    Set Scaffold to Roof

    NA

    NA

    SBB (Lot 8)

    Install Temp Roofing at Low Roof

    NA

    NA

    SBB (Lot 8)

    Set Scaffold for level 2

    NA

    NA

    SBB (Lot 8)

    Erect Tube Steel Structure

    Crane

    Noise due to Equipment

    SBB (Lot 8)

    Form Grand Stair

    NA

    NA

    SBB (Lot 8)

    Install Mechanical / FSD’s – Electrical/BDF Room

    NA

    NA

    SBB (Lot 8)

    Install In-Wall Electrical – Electrical/BDF Room

    NA

    NA

    SBB (Lot 8)

    Hang 1st Side Top Down Drywall – INT-L2

    NA

    NA

    SBB (Lot 8)

    Install Insulation & Inspect -INT-L2

    NA

    NA

    SBB (Lot 8)

    Layout Framing and Install Top Track

    NA

    NA

    SBB (Lot 8) Concrete

    F/R/P Walls at Transformer Yard Slab

    Concrete Pump

    Noise due to Equipment

    SBB (Lot 8) Concrete

    F/R/P Transformer Yard Slab

    Concrete Pump

    Noise due to Equipment

    SBB (Lot 8)

    Drainage Layer – EXT-L1

    NA

    NA

     

    Week of January 8, 2023

    Construction Activities 

     

    Location

    Activity

    Equipment Used

    Anticipated Disturbance

    SBB (Lot 8) Concrete

    Pour Steps Auditorium

    Concrete Pump

    Noise due to Equipment

    SBB (Lot 8) Concrete

    Strip Edge Form / Bulkhead – Auditorium Steps

    NA

    NA

    SBB (Lot 8)

    Install Roofing Mechanical Equipment Pad

    NA

    NA

    SBB (Lot 8)

    Install Mechanical Duct / Pipe Supports - Roof

    Crane

    Noise due to Equipment

    SBB (Lot 8)

    MEP Stub-up Penetration - Roof

    NA

    NA

    SBB (Lot 8)

    Drainage Layer – EXT-L1

    NA

    NA

    SBB (Lot 8)

    Cement Board – EXT-L1

    NA

    NA

    SBB (Lot 8)

    Secondary Air Barrier – EXT-L1

    NA

    NA

    SBB (Lot 8)

    Electrical Rough-in Soffits – EXT-L1

    NA

    NA

    SBB (Lot 8)

    Soffit Sheathing – EXT-L1

    NA

    NA

    SBB (Lot 8)

    Misc In-Wall Steel for canopy-EXT-NE

    NA

    NA

    SBB (Lot 8)

    Exterior Framing – East Elevation L1

    NA

    NA

    SBB (Lot 8)

    Erect Stairs – EXT-NE

    NA

    NA

    SBB (Lot 8)

    Install Temp Roofing

    NA

    NA

    SBB (Lot 8)

    Erect Tube Steel Structure-EXT SW

    NA

    NA

    SBB (Lot 8)

    Install Metal Decking – EXT SW

    NA

    NA

    SBB (Lot 8) Concrete

    Pour Grand Stair – INT-L1

    Concrete Pump

    Noise due to Equipment

    SBB (Lot 8)

    Install O/H Waste and Vent – INT-L1

    NA

    NA

    SBB (Lot 8)

    Install Hot/Cold Domestic Water Lines and Seismic – INT-L1

    NA

    NA

    SBB (Lot 8)

    Install O/H Mechanical Equipment and Ductwork Mains and Seismic – INT-L1

    NA

    NA

    SBB (Lot 8)

    Install In-Wall Electrical – Elec-L1

    NA

    NA

    SBB (Lot 8)

    Install Backing – Elec-L1

    NA

    NA

    SBB (Lot 8)

    Install Insulation and Inspect – Elect-L1

    NA

    NA

    SBB (Lot 8)

    Layout Framing and Install Top Track – Auditorium

    NA

    NA

    SBB (Lot 8)

    Fire Tape – INT-L2

    NA

    NA

    SBB (Lot 8)

    Fire Caulk Head of Wall – INT-L2

    NA

    NA

    SBB (Lot 8)

    Frame Interference Walls and Install Door Framed – INT-L3

    NA

    NA

    SBB (Lot 8)

    Install Early MEP to Support Top Down Drywall – INT-L3

    NA

    NA

    Anderson Park

    Rough Grade / Cut Curbs – Anderson Park

    Loader

    Noise due to Equipment

     

    Week of January 15, 2023

    Construction Activities 

     

    Location

    Activity

    Equipment Used

    Anticipated Disturbance

    SBB (Lot 8)

    Install Roof Drains

    NA

    NA

    SBB (Lot 8)

    Set Mechanical Equipment

    NA

    NA

    SBB (Lot 8)

    Moisture Test Concrete Deck

    NA

    NA

    SBB (Lot 8)

    Secondary Air Barrier – EXT-L1

     

     

    SBB (Lot 8)

    Soffit Sheathing – EXT-L1

    NA

    NA

    SBB (Lot 8)

    F/R/P Stair Treads/Landings

    NA

    NA

    SBB (Lot 8)

    Rigid Insulation and Air Water Barrier – EXT NW

    NA

    NA

    SBB (Lot 8)

    Exterior Framing – EXT NW

    NA

    NA

    SBB (Lot 8)

    Erect Steel Structure for Stairs-EXT SW

    NA

    NA

    SBB (Lot 8)

    Install O/H Supply & Return Ductwork Branch & Seismic – INT-L1

    NA

    NA

    SBB (Lot 8)

    Hang Drywall and Inspect – Elec/BDF L1

    NA

    NA

    SBB (Lot 8)

    Tape Walls – Elec/BDF L1

    NA

    NA

    SBB (Lot 8)

    Frame Walls – INT Auditorium

    NA

    NA

    SBB (Lot 8)

    Install O/H Mechanical Equipment and Ductwork - INT-L2

    NA

    NA

    SBB (Lot 8)

    Install In-Wall Electrical – Elec L2

    NA

    NA

    SBB (Lot 8)

    Hang 1st Side Top Down Drywall – INT-L3

    NA

    NA

    SBB (Lot 8)

    Install Insulation and Inspect – INT-L3

     

     

    SBB (Lot 8)

    Hang 2nd Side Top Down Drywall and Inspect – INT-L3

    NA

    NA

    SBB (Lot 8)

    Fire Tape – INT-L3

    NA

    NA

    SBB (Lot 8)

    Layout Framing and Install Top Track – INT-L4

    NA

    NA

    SBB (Lot 8)

    Frame Interference Walls and Install Foor Frames

    NA

    NA

    SBB (Lot 8)

    Install Early MEP to Support Top Down Drywall

    NA

    NA

    SBB (Lot 8)

    Install Communications Ductbank and Vault from MH-14 to SBB POC

    NA

    NA

     

    Current and Upcoming Anticipated Closures

    The following shutdown(s)/ closures are anticipated as indicated below. Updates to this schedule will be released weekly in the Project Construction Advisories until the work is complete.  Please contact John Franklin with any specific questions or concerns at john.franklin@ucr.edu.

     

    Description

    Location

    Duration & Date

    Impacted Buildings/ Facilities

    Lot 8

    Lot 8

    Permanently

    Lot 8

    Lot 43

    Lot 43

    Indefinitely

    Lot 43

    Anderson Park

    Anderson Park

    Indefinitely

    Anderson Park

  • 950592 UCR SBB - Construction Alert #59

    Current Week

    Construction Activities

     

    Location

    Activity

    Equipment Used

    Anticipated Disturbance

    SBB (Lot 8) Concrete

    Edge Form / Bulkhead SOG North – Auditorium Steps

    NA

    NA

    SBB (Lot 8) Concrete

    Rebar – Auditorium Steps

    NA

    NA

    SBB (Lot 8) Concrete

    Underslab Electrical Rough-in - Auditorium Steps

    NA

    NA

    SBB (Lot 8) Concrete

    Form Steps - Auditorium

    NA

    NA

    SBB (Lot 8) Concrete

    Close Two Side Forms – Vert L5

    NA

    NA

    SBB (Lot 8) Concrete

    Pour – Vert L5

    Concrete Pump

    Noise due to Equipment

    SBB (Lot 8) Concrete

    Strip Walls and columns – Vert L5

    NA

    NA

    SBB (Lot 8) Concrete

    Cure for Steel Erection – Vert L5

    NA

    NA

    SBB (Lot 8) Concrete

    Strip and Haul off Form System – Deck L5

    Crane

    Noise due to Equipment

    SBB (Lot 8)

    Install Roof Drains

    NA

    NA

    SBB (Lot 8)

    Soffit Framing – EXT L1

    NA

    NA

    SBB (Lot 8)

    Flashing and Window Surrounds-EXT L1

    NA

    NA

    SBB (Lot 8)

    Rigid Insulation and Air Water Barrier – EXT L1

    NA

    NA

    SBB (Lot 8)

    Electrical Rough-in Soffits – EXT L1

    NA

    NA

    SBB (Lot 8) Concrete

    Form Grand Stair – INT L1

    NA

    NA

    SBB (Lot 8)

    Install Fire Sprinkler Mains, Branches, & Seismic

    NA

    NA

    SBB (Lot 8) Concrete

    Remove Re-Shore – INT L2

    NA

    NA

    SBB (Lot 8)

    Frame Interference Walls and Install Foor Frames – INT L2

    NA

    NA

    SBB (Lot 8)

    Install Early MEP to Support Top Drown Drywall – INT L2

    NA

    NA

    SBB (Lot 8) Concrete

    F/R/P Walls at Transformer Yard

    Concrete Pump

    Noise due to Equipment

    SBB (Lot 8)

    Install Fire Water College Place to SBB POC

    NA

    NA

     

    Week of January 1, 2023

    Construction Activities 

     

    Location

    Activity

    Equipment Used

    Anticipated Disturbance

    SBB (Lot 8) Concrete

    Underslab Electrical Rough-in - Auditorium Steps

    NA

    NA

    SBB (Lot 8) Concrete

    Form Steps - Auditorium

    NA

    NA

    SBB (Lot 8)

    QC / Inspection – Auditorium

    NA

    NA

    SBB (Lot 8)

    Strip and Haul Off Form system

    Crane

    Noise due to Equipment

    SBB (Lot 8)

    Install Roofing at Mechanical Equipment Pad

    NA

    NA

    SBB (Lot 8)

    Install Mechanical Duct Pipe Supports – Roof

    NA

    NA

    SBB (Lot 8)

    Set Scaffold to Roof

    NA

    NA

    SBB (Lot 8)

    Install Temp Roofing at Low Roof

    NA

    NA

    SBB (Lot 8)

    Set Scaffold for level 2

    NA

    NA

    SBB (Lot 8)

    Erect Tube Steel Structure

    Crane

    Noise due to Equipment

    SBB (Lot 8)

    Form Grand Stair

    NA

    NA

    SBB (Lot 8)

    Install Mechanical / FSD’s – Electrical/BDF Room

    NA

    NA

    SBB (Lot 8)

    Install In-Wall Electrical – Electrical/BDF Room

    NA

    NA

    SBB (Lot 8)

    Hang 1st Side Top Down Drywall – INT-L2

    NA

    NA

    SBB (Lot 8)

    Install Insulation & Inspect -INT-L2

    NA

    NA

    SBB (Lot 8)

    Layout Framing and Install Top Track

    NA

    NA

    SBB (Lot 8) Concrete

    F/R/P Walls at Transformer Yard Slab

    Concrete Pump

    Noise due to Equipment

    SBB (Lot 8) Concrete

    F/R/P Transformer Yard Slab

    Concrete Pump

    Noise due to Equipment

     

    Week of January 8, 2023

    Construction Activities 

     

    Location

    Activity

    Equipment Used

    Anticipated Disturbance

    SBB (Lot 8) Concrete

    Pour Steps Auditorium

    Concrete Pump

    Noise due to Equipment

    SBB (Lot 8) Concrete

    Strip Edge Form / Bulkhead – Auditorium Steps

    NA

    NA

    SBB (Lot 8)

    Install Roofing Mechanical Equipment Pad

    NA

    NA

    SBB (Lot 8)

    Install Mechanical Duct / Pipe Supports - Roof

    Crane

    Noise due to Equipment

    SBB (Lot 8)

    MEP Stub-up Penetration - Roof

    NA

    NA

    SBB (Lot 8)

    Drainage Layer – EXT-L1

    NA

    NA

    SBB (Lot 8)

    Cement Board – EXT-L1

    NA

    NA

    SBB (Lot 8)

    Secondary Air Barrier – EXT-L1

    NA

    NA

    SBB (Lot 8)

    Electrical Rough-in Soffits – EXT-L1

    NA

    NA

    SBB (Lot 8)

    Soffit Sheathing – EXT-L1

    NA

    NA

    SBB (Lot 8)

    Misc In-Wall Steel for canopy-EXT-NE

    NA

    NA

    SBB (Lot 8)

    Exterior Framing – East Elevation L1

    NA

    NA

    SBB (Lot 8)

    Erect Stairs – EXT-NE

    NA

    NA

    SBB (Lot 8)

    Install Temp Roofing

    NA

    NA

    SBB (Lot 8)

    Erect Tube Steel Structure-EXT SW

    NA

    NA

    SBB (Lot 8)

    Install Metal Decking – EXT SW

    NA

    NA

    SBB (Lot 8) Concrete

    Pour Grand Stair – INT-L1

    Concrete Pump

    Noise due to Equipment

    SBB (Lot 8)

    Install O/H Waste and Vent – INT-L1

    NA

    NA

    SBB (Lot 8)

    Install Hot/Cold Domestic Water Lines and Seismic – INT-L1

    NA

    NA

    SBB (Lot 8)

    Install O/H Mechanical Equipment and Ductwork Mains and Seismic – INT-L1

    NA

    NA

    SBB (Lot 8)

    Install In-Wall Electrical – Elec-L1

    NA

    NA

    SBB (Lot 8)

    Install Backing – Elec-L1

    NA

    NA

    SBB (Lot 8)

    Install Insulation and Inspect – Elect-L1

    NA

    NA

    SBB (Lot 8)

    Layout Framing and Install Top Track – Auditorium

    NA

    NA

    SBB (Lot 8)

    Fire Tape – INT-L2

    NA

    NA

    SBB (Lot 8)

    Fire Caulk Head of Wall – INT-L2

    NA

    NA

    SBB (Lot 8)

    Frame Interference Walls and Install Door Framed – INT-L3

    NA

    NA

    SBB (Lot 8)

    Install Early MEP to Support Top Down Drywall – INT-L3

    NA

    NA

    SBB (Lot 8)

    Rough Grade / Cut Curbs – Anderson Park

    Loader

    Noise due to Equipment

     

    Current and Upcoming Anticipated Closures

    The following shutdown(s)/ closures are anticipated as indicated below. Updates to this schedule will be released weekly in the Project Construction Advisories until the work is complete.  Please contact John Franklin with any specific questions or concerns at john.franklin@ucr.edu.

     

    Description

    Location

    Duration & Date

    Impacted Buildings/ Facilities

    Lot 8

    Lot 8

    Permanently

    Lot 8

    Lot 43

    Lot 43

    Indefinitely

    Lot 43

    Anderson Park

    Anderson Park

    Indefinitely

    Anderson Park

  • 950592 UCR SBB - Construction Alert #58

    Current Week

    Construction Activities

     

    Location

    Activity

    Equipment Used

    Anticipated Disturbance

    SBB (Lot 8)

    F/R/P Transformer Yard Footings

    NA

    NA

    SBB (Lot 8) Concrete

    Pour – Deck L5

    Concrete Pump

    Noise due to Equipment

    SBB (Lot 8) Concrete

    Strip Edge Form and Transfer Beams – Deck L5

    NA

    NA

    SBB (Lot 8) Concrete

    Cure for Stress – Deck L5

    NA

    NA

    SBB (Lot 8) Concrete

    Stress Transfer Beams – Deck L5

    NA

    NA

    SBB (Lot 8) Concrete

    One Side Form Walls and Columns – Vert L5

    NA

    NA

    SBB (Lot 8) Concrete

    Rebar – Vert L5

    Crane

    Noise due to Equipment

    SBB (Lot 8) Concrete

    Layout and Install MEPs – Vert L5

    NA

    NA

    SBB (Lot 8) Concrete

    Set Embeds – Vert L5

    NA

    NA

    SBB (Lot 8) Concrete

    QC / Inspection – Vert L5

    NA

    NA

    SBB (Lot 8) Concrete

    F/R/P Equipment Pads

    Concrete Pump

    Noise due to Equipment

    SBB (Lot 8) Concrete

    Roof Davits

    NA

    NA

    SBB (Lot 8)

    Soffit Framing – EXT L1

    NA

    NA

    SBB (Lot 8)

    Rigid Insulation and Air Water Barrier – EXT L1

    NA

    NA

    SBB (Lot 8)

    Electrical Rough-in Soffits – EXT L1

    NA

    NA

    SBB (Lot 8)

    Fire Sprinkler Rough-in Soffits – EXT L1

    NA

    NA

    SBB (Lot 8)

    Plumbing Rough-in Soffits – EXT L1

    NA

    NA

    SBB (Lot 8)

    Hang 2nd Side Top-Down Drywall and Inspect – INT L1

    NA

    NA

    SBB (Lot 8)

    Fire Tape – INT L1

    NA

    NA

    SBB (Lot 8)

    Fire Caulk Head of Wall– INT L1

    NA

    NA

    SBB (Lot 8)

    Install Elevator Guide Rail Support Steel – Level 3

    NA

    NA

    SBB (Lot 8)

    Concrete

    F/R/P Walls at Transformer Yard

    Concrete Pump

    Noise due to Equipment

     

    Week of December 25, 2023

    Construction Activities 

     

    Location

    Activity

    Equipment Used

    Anticipated Disturbance

    SBB (Lot 8) Concrete

    Edge Form / Bulkhead SOG North – Auditorium Steps

    NA

    NA

    SBB (Lot 8) Concrete

    Rebar – Auditorium Steps

    NA

    NA

    SBB (Lot 8) Concrete

    Underslab Electrical Rough-in - Auditorium Steps

    NA

    NA

    SBB (Lot 8) Concrete

    Form Steps - Auditorium

    NA

    NA

    SBB (Lot 8) Concrete

    Close Two Side Forms – Vert L5

    NA

    NA

    SBB (Lot 8) Concrete

    Pour – Vert L5

    Concrete Pump

    Noise due to Equipment

    SBB (Lot 8) Concrete

    Strip Walls and columns – Vert L5

    NA

    NA

    SBB (Lot 8) Concrete

    Cure for Steel Erection – Vert L5

    NA

    NA

    SBB (Lot 8) Concrete

    Strip and Haul off Form System – Deck L5

    Crane

    Noise due to Equipment

    SBB (Lot 8)

    Install Roof Drains

    NA

    NA

    SBB (Lot 8)

    Soffit Framing – EXT L1

    NA

    NA

    SBB (Lot 8)

    Flashing and Window Surrounds-EXT L1

    NA

    NA

    SBB (Lot 8)

    Rigid Insulation and Air Water Barrier – EXT L1

    NA

    NA

    SBB (Lot 8)

    Electrical Rough-in Soffits – EXT L1

    NA

    NA

    SBB (Lot 8) Concrete

    Form Grand Stair – INT L1

    NA

    NA

    SBB (Lot 8)

    Install Fire Sprinkler Mains, Branches, & Seismic

    NA

    NA

    SBB (Lot 8) Concrete

    Remove Re-Shore – INT L2

    NA

    NA

    SBB (Lot 8)

    Frame Interference Walls and Install Foor Frames – INT L2

    NA

    NA

    SBB (Lot 8)

    Install Early MEP to Support Top Drown Drywall – INT L2

    NA

    NA

    SBB (Lot 8) Concrete

    F/R/P Walls at Transformer Yard

    Concrete Pump

    Noise due to Equipment

    SBB (Lot 8)

    Install Fire Water College Place to SBB POC

    NA

    NA

     

    Week of January 1, 2023

    Construction Activities 

     

    Location

    Activity

    Equipment Used

    Anticipated Disturbance

    SBB (Lot 8) Concrete

    Underslab Electrical Rough-in - Auditorium Steps

    NA

    NA

    SBB (Lot 8) Concrete

    Form Steps - Auditorium

    NA

    NA

    SBB (Lot 8)

    QC / Inspection – Auditorium

    NA

    NA

    SBB (Lot 8)

    Strip and Haul Off Form system

    Crane

    Noise due to Equipment

    SBB (Lot 8)

    Install Roofing at Mechanical Equipment Pad

    NA

    NA

    SBB (Lot 8)

    Install Mechanical Duct Pipe Supports – Roof

    NA

    NA

    SBB (Lot 8)

    Set Scaffold to Roof

    NA

    NA

    SBB (Lot 8)

    Install Temp Roofing at Low Roof

    NA

    NA

    SBB (Lot 8)

    Set Scaffold for level 2

    NA

    NA

    SBB (Lot 8)

    Erect Tube Steel Structure

    Crane

    Noise due to Equipment

    SBB (Lot 8)

    Form Grand Stair

    NA

    NA

    SBB (Lot 8)

    Install Mechanical / FSD’s – Electrical/BDF Room

    NA

    NA

    SBB (Lot 8)

    Install In-Wall Electrical – Electrical/BDF Room

    NA

    NA

    SBB (Lot 8)

    Hang 1st Side Top Down Drywall – INT-L2

    NA

    NA

    SBB (Lot 8)

    Install Insulation & Inspect -INT-L2

    NA

    NA

    SBB (Lot 8)

    Layout Framing and Install Top Track

    NA

    NA

    SBB (Lot 8) Concrete

    F/R/P Walls at Transformer Yard Slab

    Concrete Pump

    Noise due to Equipment

    SBB (Lot 8) Concrete

    F/R/P Transformer Yard Slab

    Concrete Pump

    Noise due to Equipment

     

    Current and Upcoming Anticipated Closures

    The following shutdown(s)/ closures are anticipated as indicated below. Updates to this schedule will be released weekly in the Project Construction Advisories until the work is complete.  Please contact John Franklin with any specific questions or concerns at john.franklin@ucr.edu.

     

    Description

    Location

    Duration & Date

    Impacted Buildings/ Facilities

    Lot 8

    Lot 8

    Permanently

    Lot 8

    Lot 43

    Lot 43

    Indefinitely

    Lot 43

    Anderson Park

    Anderson Park

    Indefinitely

    Anderson Park

  • 950592 UCR SBB - Construction Alert #57

    Current Week

    Construction Activities

     

    Location

    Activity

    Equipment Used

    Anticipated Disturbance

    SBB (Lot 8) Concrete

    MEP Sleeves and Inserts – Deck L5

    NA

    NA

    SBB (Lot 8) Concrete

    Install Embeds – Deck L5

    NA

    NA

    SBB (Lot 8) Concrete

    Set Anchor Bolts – Deck L5

    NA

    NA

    SBB (Lot 8) Concrete

    Rebar / PT Cables – Deck L5

    Crane

    Noise due to Equipment

    SBB (Lot 8) Concrete

    Electrical Rough-in – Deck L5

    NA

    NA

    SBB (Lot 8)

    Install Early MEP To support Top Down Drywall – INT-L1

    NA

    NA

    SBB (Lot 8)

    Install Misc Metals Supports for Operable Partitions – INT-L1

    NA

    NA

    SBB (Lot 8)

    Hang 1st Side Top Down Drywall – INT-L1

    NA

    NA

    SBB (Lot 8)

    Install Insulation & Inspect – INT-L1

    NA

    NA

    SBB (Lot 8)

    Install Elevator Guide Rail Support Steel – Level 2

    NA

    NA

    SBB (Lot 8)

    F/R/P Transformer Yard Footings

    NA

    NA

     

    Week of December 18, 2023

    Construction Activities 

     

    Location

    Activity

    Equipment Used

    Anticipated Disturbance

    SBB (Lot 8) Concrete

    Electrical Rough-in – Deck L5

    NA

    NA

    SBB (Lot 8) Concrete

    Deck Depressions – Deck L5

    NA

    NA

    SBB (Lot 8) Concrete

    QC / Inspection – Deck L5

    NA

    NA

    SBB (Lot 8) Concrete

    Pour  – Deck L5

    Concrete Pump

    Noise due to Equipment

    SBB (Lot 8) Concrete

    Strip Edge Form and Transfer Beams  – Deck L5

    NA

    NA

    SBB (Lot 8) Concrete

    Cure for Stress  – Deck L5

    NA

    NA

    SBB (Lot 8) Concrete

    Stress Transfer Beams  – Deck L5

    NA

    NA

    SBB (Lot 8) Concrete

    One Side Form Walls and Columns – Vert L5

    NA

    NA

    SBB (Lot 8) Concrete

    Rebar – Vert L5

    Crane

    Noise due to Equipment

    SBB (Lot 8) Concrete

    Layout and Install MEPs – Vert L5

    NA

    NA

    SBB (Lot 8) Concrete

    Set Embeds – Vert L5

    NA

    NA

    SBB (Lot 8) Concrete

    QC / Inspection  – Vert L5

    NA

    NA

    SBB (Lot 8) Concrete

    F/R/P Equipment Pads

    Concrete Pump

    Noise due to Equipment

    SBB (Lot 8) Concrete

    Roof Davits

    NA

    NA

    SBB (Lot 8)

    Soffit Framing – EXT L1

    NA

    NA

    SBB (Lot 8)

    Rigid Insulation and Air Water Barrier – EXT L1

    NA

    NA

    SBB (Lot 8)

    Electrical Rough-in Soffits – EXT L1

    NA

    NA

    SBB (Lot 8)

    Fire Sprinkler Rough-in Soffits – EXT L1

    NA

    NA

    SBB (Lot 8)

    Plumbing Rough-in Soffits – EXT L1

    NA

    NA

    SBB (Lot 8)

    Hang 2nd Side Top Down Drywall and Inspect – INT L1

    NA

    NA

    SBB (Lot 8)

    Fire Tape – INT L1

    NA

    NA

    SBB (Lot 8)

    Fire Caulk Head of Wall– INT L1

    NA

    NA

    SBB (Lot 8)

    Install Elevator Guide Rail Support Steel – Level 3

    NA

    NA

    SBB (Lot 8)

    Concrete

    F/R/P Walls at Transformer Yard

    Concrete Pump

    Noise due to Equipment

     

    Week of December 25, 2023

    Construction Activities 

     

    Location

    Activity

    Equipment Used

    Anticipated Disturbance

    SBB (Lot 8) Concrete

    Close Tow Side Forms – Vert L5

    NA

    NA

    SBB (Lot 8) Concrete

    Pour – Vert L5

    Concrete Pump

    Noise due to Equipment

    SBB (Lot 8) Concrete

    Strip Walls and columns – Vert L5

    NA

    NA

    SBB (Lot 8) Concrete

    Cure for Steel Erection – Vert L5

    NA

    NA

    SBB (Lot 8)

    Soffit Framing – EXT L1

    NA

    NA

    SBB (Lot 8)

    Rigid Insulation and Air Water Barrier – EXT L1

    NA

    NA

    SBB (Lot 8)

    Electrical Rough-in Soffits – EXT L1

    NA

    NA

    SBB (Lot 8) Concrete

    Form Grand Stair – INT L1

    NA

    NA

    SBB (Lot 8)

    Install Storm, Overflow, Sewer Lines, and Seismic

    NA

    NA

    SBB (Lot 8)

    Install Mechanical / FSD’s

    NA

    NA

    SBB (Lot 8) Concrete

    Remove Re-Shore – INT L2

    NA

    NA

    SBB (Lot 8)

    Frame Interference Walls and Install Foor Frames – INT L2

    NA

    NA

    SBB (Lot 8)

    Install Early MEP to Support Top Drown Drywall – INT L2

    NA

    NA

    SBB (Lot 8) Concrete

    F/R/P Walls at Transformer Yard

    Concrete Pump

    Noise due to Equipment

    SBB (Lot 8)

    Install Fire Water College Place to SBB POC

    NA

    NA

    SBB (Lot 8) Concrete

    F/R/P Transformer Yard Slab

    Concrete Pump

    Noise due to Equipment

     

    Current and Upcoming Anticipated Closures

    The following shutdown(s)/ closures are anticipated as indicated below. Updates to this schedule will be released weekly in the Project Construction Advisories until the work is complete.  Please contact John Franklin with any specific questions or concerns at john.franklin@ucr.edu.

     

    Description

    Location

    Duration & Date

    Impacted Buildings/ Facilities

    Lot 8

    Lot 8

    Permanently

    Lot 8

    Lot 43

    Lot 43

    Indefinitely

    Lot 43

    Anderson Park

    Anderson Park

    Indefinitely

    Anderson Park

  • 950592 UCR SBB - Construction Alert #56

    Current Week

    Construction Activities

     

    Location

    Activity

    Equipment Used

    Anticipated Disturbance

    SBB (Lot 8) Concrete

    Pour Auditorium Steps – SOG1

    Concrete Pumps

    Noise due to Equipment

    SBB (Lot 8) Concrete

    Strip Edge Form / Bulkhead – SOG North – Auditorium Steps

    Crane

    Noise due to Equipment

    SBB (Lot 8) Concrete

    Strip & Re-Shore – Deck L4S

    NA

    NA

    SBB (Lot 8) Concrete

    Edge Form – Deck L5 Roof

    Crane

    Noise due to Equipment

    SBB (Lot 8)

    Install Early MEP to support Top Down Drywall

    NA

    NA

    SBB (Lot 8)

    Hang 1st Side Top Down Drywall – INT L1

    NA

    NA

    SBB (Lot 8)

    Install Insulation and Inspect – INT L1

    NA

    NA

    SBB (Lot 8)

    F/R/P Transformer Yard Slab

    NA

    NA

     

    Week of December 11, 2023

    Construction Activities 

     

    Location

    Activity

    Equipment Used

    Anticipated Disturbance

    SBB (Lot 8) Concrete

    MEP Sleeves and Inserts – Deck L5

    NA

    NA

    SBB (Lot 8) Concrete

    Set Anchor Bolts – Deck L5

    NA

    NA

    SBB (Lot 8) Concrete

    Rebar / PT Cables – Deck L5

    Crane

    Noise due to Equipment

    SBB (Lot 8) Concrete

    Electrical Rough-in – Deck L5

    NA

    NA

    SBB (Lot 8)

    Soffit Framing – EXT-L1

    NA

    NA

    SBB (Lot 8)

    Rigid Insulation and Air Water Barrier – EXT-L1

    NA

    NA

    SBB (Lot 8)

    Electrical Rough-in Soffits – EXT-L1

    NA

    NA

    SBB (Lot 8)

    Fire Sprinkler Rough-in Soffits – EXT-L1

    NA

    NA

    SBB (Lot 8)

    Plumbing Rough-in Soffits – EXT-L1

    NA

    NA

    SBB (Lot 8)

    Fire Tape – INT-L1

    NA

    NA

    SBB (Lot 8)

    Fire Caulk Head of Wall – INT-L1

    NA

    NA

     

    Week of December 18, 2023

    Construction Activities 

     

    Location

    Activity

    Equipment Used

    Anticipated Disturbance

    SBB (Lot 8) Concrete

    Deck Depression – Deck L5

    NA

    NA

    SBB (Lot 8) Concrete

    QC / Inspection – Deck L5

    NA

    NA

    SBB (Lot 8) Concrete

    Pour – Deck L5

    Concrete Pumps

    Noise due to Equipment

    SBB (Lot 8) Concrete

    Strip Edge Form and Transfer Beams – Deck L5

    NA

    NA

    SBB (Lot 8) Concrete

    Layout walls and Columns – VERT L5

    NA

    NA

    SBB (Lot 8)

    Soffit Sheathing – EXT L1

    NA

    NA

    SBB (Lot 8)

    Isntall Hot/Cold Domestic Water Lines and Seismic – INT L1

    NA

    NA

    SBB (Lot 8)

    Install Mechanical / FSD’s – Electrical / BDF Rooms

    NA

    NA

     

    Current and Upcoming Anticipated Closures

    The following shutdown(s)/ closures are anticipated as indicated below. Updates to this schedule will be released weekly in the Project Construction Advisories until the work is complete.  Please contact John Franklin with any specific questions or concerns at john.franklin@ucr.edu.

     

    Description

    Location

    Duration & Date

    Impacted Buildings/ Facilities

    Lot 8

    Lot 8

    Permanently

    Lot 8

    Lot 43

    Lot 43

    Indefinitely

    Lot 43

    Anderson Park

    Anderson Park

    Indefinitely

    Anderson Park

  • 950592 UCR SBB - Construction Alert #55

    Current Week

    Construction Activities

     

    Location

    Activity

    Equipment Used

    Anticipated Disturbance

    SBB (Lot 8) Concrete

    QC / Inspection – SOG North Auditorium Steps

    NA

    NA

    SBB (Lot 8) Concrete

    Strip Walls & Columns – Vert L4N

    NA

    NA

    SBB (Lot 8) Concrete

    Close Two Side Forms - Vert L4S

    Crane

    Noise due to Equipment

    SBB (Lot 8) Concrete

    Pour - Vert L4S

    Concrete Pumps

    Noise due to Equipment

    SBB (Lot 8) Concrete

    Strip Walls & Columns – Vert L4S

    Crane

    Noise due to Equipment

    SBB (Lot 8)

    Exterior Framing – EXT-L1

    NA

    NA

    SBB (Lot 8)

    Frame Interference Walls and Install door Frames - INT-L1

    NA

    NA

    SBB (Lot 8)

    Install Early MEP to Support Top Down Drywall

    NA

    NA

    SBB (Lot 8) Concrete

    F/R/P Transformer Yard Wall

    NA

    NA

    SBB (Lot 8) Concrete

    F/R/P Transformer Yard Slab

    NA

    NA

     

    Week of December 4, 2023

    Construction Activities 

     

    Location

    Activity

    Equipment Used

    Anticipated Disturbance

    SBB (Lot 8) Concrete

    Pour Auditorium Steps – SOG1

    Concrete Pumps

    Noise due to Equipment

    SBB (Lot 8) Concrete

    Strip Edge Form / Bulkhead – SOG North – Auditorium Steps

    Crane

    Noise due to Equipment

    SBB (Lot 8) Concrete

    Strip & Re-Shore – Deck L4S

    NA

    NA

    SBB (Lot 8) Concrete

    Edge Form – Deck L5 Roof

    NA

    NA

    SBB (Lot 8)

    Install Early MEP to support Top Down Drywall

    NA

    NA

    SBB (Lot 8)

    Hang 1st Side Top Down Drywall – INT L1

    NA

    NA

    SBB (Lot 8)

    Install Insulation and Inspect – INT L1

    NA

    NA

    SBB (Lot 8)

    F/R/P Transformer Yard Slab

    NA

    NA

     

    Week of December 11, 2023

    Construction Activities 

     

    Location

    Activity

    Equipment Used

    Anticipated Disturbance

    SBB (Lot 8) Concrete

    MEP Sleeves and Inserts – Deck L5

    NA

    NA

    SBB (Lot 8) Concrete

    Set Anchor Bolts – Deck L5

    NA

    NA

    SBB (Lot 8) Concrete

    Rebar / PT Cables – Deck L5

    Crane

    Noise due to Equipment

    SBB (Lot 8)

    Soffit Framing – EXT-L1

    NA

    NA

    SBB (Lot 8)

    Rigid Insulation and Air Water Barrier – EXT-L1

    NA

    NA

    SBB (Lot 8)

    Electrical Rough-in Soffits – EXT-L1

    NA

    NA

    SBB (Lot 8)

    Fire Sprinkler Rough-in Soffits – EXT-L1

    NA

    NA

    SBB (Lot 8)

    Plumbing Rough-in Soffits – EXT-L1

    NA

    NA

    SBB (Lot 8)

    Fire Tape – INT-L1

    NA

    NA

    SBB (Lot 8)

    Fire Caulk Head of Wall – INT-L1

    NA

    NA

     

    Current and Upcoming Anticipated Closures

    The following shutdown(s)/ closures are anticipated as indicated below. Updates to this schedule will be released weekly in the Project Construction Advisories until the work is complete.  Please contact John Franklin with any specific questions or concerns at john.franklin@ucr.edu.

     

    Description

    Location

    Duration & Date

    Impacted Buildings/ Facilities

    Lot 8

    Lot 8

    Permanently

    Lot 8

    Lot 43

    Lot 43

    Indefinitely

    Lot 43

    Anderson Park

    Anderson Park

    Indefinitely

    Anderson Park

  • 950592 UCR SBB - Construction Alert #54

    Current Week

    Construction Activities

     

    Location

    Activity

    Equipment Used

    Anticipated Disturbance

    BIO

    Punchlist Corrections

    NA

    NA

    SBB (Lot 8) Concrete

    Form Steps – Auditorium

    NA

    NA

    SBB (Lot 8) Concrete

    QC / Inspection – Vert L4N

    NA

    NA

    SBB (Lot 8) Concrete

    Close Two Side Forms  – Vert L4N

    Crane

    Noise due to Equipment

    SBB (Lot 8) Concrete

    Pour  – Vert L4N

    Concrete Pumps

    Noise due to Equipment

    SBB (Lot 8) Concrete

    Rebar  – Vert L4S

    Crane

    Noise due to Equipment

    SBB (Lot 8) Concrete

    Layout & Install MEP’s – Vert L4S

    NA

    NA

    SBB (Lot 8) Concrete

    Set Embeds – Vert L4S

    NA

    NA

    SBB (Lot 8) Concrete

    QC / Inspection – Vert L4S

    NA

    NA

    SBB (Lot 8)

    Exterior Framing – L1

    NA

    NA

    SBB (Lot 8)

    Frame Interference Walls & Install Door Frames

    NA

    NA

    SBB (Lot 8) Concrete

    F/R/P Transformer Yard Wall

    NA

    NA

     

    Week of November 27, 2023

    Construction Activities 

     

    Location

    Activity

    Equipment Used

    Anticipated Disturbance

    SBB (Lot 8) Concrete

    QC / Inspection – SOG North Auditorium Steps

    NA

    NA

    SBB (Lot 8) Concrete

    Strip Walls & Columns – Vert L4N

    NA

    NA

    SBB (Lot 8) Concrete

    Close Two Side Forms - Vert L4S

    Crane

    Noise due to Equipment

    SBB (Lot 8) Concrete

    Pour - Vert L4S

    Concrete Pumps

    Noise due to Equipment

    SBB (Lot 8) Concrete

    Strip Walls & Columns – Vert L4S

    Crane

    Noise due to Equipment

    SBB (Lot 8)

    Exterior Framing – EXT-L1

    NA

    NA

    SBB (Lot 8)

    Frame Interference Walls and Install door Frames - INT-L1

    NA

    NA

    SBB (Lot 8)

    Install Early MEP to Support Top Down Drywall

    NA

    NA

    SBB (Lot 8) Concrete

    F/R/P Transformer Yard Wall

    NA

    NA

    SBB (Lot 8) Concrete

    F/R/P Transformer Yard Slab

    NA

    NA

     

    Week of December 4, 2023

    Construction Activities 

     

    Location

    Activity

    Equipment Used

    Anticipated Disturbance

    SBB (Lot 8) Concrete

    Pour Auditorium Steps – SOG1

    Concrete Pumps

    Noise due to Equipment

    SBB (Lot 8) Concrete

    Strip Edge Form / Bulkhead – SOG North – Auditorium Steps

    Crane

    Noise due to Equipment

    SBB (Lot 8) Concrete

    Strip & Re-Shore – Deck L4S

    NA

    NA

    SBB (Lot 8) Concrete

    Edge Form – Deck L5 Roof

    NA

    NA

    SBB (Lot 8)

    Install Early MEP to support Top Down Drywall

    NA

    NA

    SBB (Lot 8)

    Hang 1st Side Top Down Drywall – INT L1

    NA

    NA

    SBB (Lot 8)

    Install Insulation and Inspect – INT L1

    NA

    NA

    SBB (Lot 8)

    F/R/P Transformer Yard Slab

    NA

    NA

     

    Current and Upcoming Anticipated Closures

    The following shutdown(s)/ closures are anticipated as indicated below. Updates to this schedule will be released weekly in the Project Construction Advisories until the work is complete.  Please contact John Franklin with any specific questions or concerns at john.franklin@ucr.edu.

     

    Description

    Location

    Duration & Date

    Impacted Buildings/ Facilities

    Lot 8

    Lot 8

    Permanently

    Lot 8

    Lot 43

    Lot 43

    Indefinitely

    Lot 43

    Anderson Park

    Anderson Park

    Indefinitely

    Anderson Park

  • 950592 UCR SBB - Construction Alert #53

    Current Week

    Construction Activities

    Location

    Activity

    Equipment Used

    Anticipated Disturbance

    BIO

    Punchlist Corrections

    NA

    NA

    SBB (Lot 8) Concrete

    Edge Form / Bulkhead - SOG North - Auditorium Steps

    NA

    NA

    SBB (Lot 8) Concrete

    Rebar - SOG North - Auditorium Steps

    Crane

    Noise due to Equipment

    SBB (Lot 8) Concrete

    Underslab Electrical Rough-in - SOG North - Auditorium Steps

    NA

    NA

    SBB (Lot 8) Concrete

    Underslab Fire Sprinkler Riser - SOG North

    NA

    NA

    SBB (Lot 8) Concrete

    QC / Inspection – Deck L4S

    NA

    NA

    SBB (Lot 8) Concrete

    Pour – Deck L4S

    Concrete Pumps

    Noise due to Equipment

    SBB (Lot 8) Concrete

    Strip Edge Form & Transfer Beams – Deck L4S

    NA

    NA

    SBB (Lot 8) Concrete

    Stress Transfer Beams – Deck L4S

    NA

    NA

    SBB (Lot 8) Concrete

    Layout Walls & Columns -Vert L4N

    Crane

    Noise due to Equipment

    SBB (Lot 8) Concrete

    One Side Form Walls & Columns -Vert L4N

    Crane

    Noise due to Equipment

    SBB (Lot 8) Concrete

    Rebar -Vert L4N

    Crane

    Noise due to Equipment

    SBB (Lot 8) Concrete

    Layout & Install MEP's -Vert L4N

    NA

    NA

    SBB (Lot 8) Concrete

    Set Embeds -Vert L4N

    NA

    NA

    SBB (Lot 8) Concrete

    Layout Walls & Columns – Vert L4S

    Crane

    Noise due to Equipment

    SBB (Lot 8) Concrete

    F/R/P Transformer Yard Wall

    NA

    NA

     

    Week of November 20, 2023

    Construction Activities 

     

    Location

    Activity

    Equipment Used

    Anticipated Disturbance

    BIO

    Building Complete

    NA

    NA

    SBB (Lot 8) Concrete

    Form Steps – Auditorium

    NA

    NA

    SBB (Lot 8) Concrete

    QC / Inspection – Vert L4N

    NA

    NA

    SBB (Lot 8) Concrete

    Close Two Side Forms  – Vert L4N

    Crane

    Noise due to Equipment

    SBB (Lot 8) Concrete

    Pour  – Vert L4N

    Concrete Pumps

    Noise due to Equipment

    SBB (Lot 8) Concrete

    Rebar  – Vert L4S

    Crane

    Noise due to Equipment

    SBB (Lot 8) Concrete

    Layout & Install MEP’s – Vert L4S

    NA

    NA

    SBB (Lot 8) Concrete

    Set Embeds – Vert L4S

    NA

    NA

    SBB (Lot 8) Concrete

    QC / Inspection – Vert L4S

    NA

    NA

    SBB (Lot 8)

    Exterior Framing – L1

    NA

    NA

    SBB (Lot 8)

    Frame Interference Walls & Install Door Frames

    NA

    NA

    SBB (Lot 8) Concrete

    F/R/P Transformer Yard Wall

    NA

    NA

     

    Week of November 27, 2023

    Construction Activities 

     

    Location

    Activity

    Equipment Used

    Anticipated Disturbance

    SBB (Lot 8) Concrete

    QC / Inspection – SOG North Auditorium Steps

    NA

    NA

    SBB (Lot 8) Concrete

    Strip Walls & Columns – Vert L4N

    NA

    NA

    SBB (Lot 8) Concrete

    Close Two Side Forms - Vert L4S

    Crane

    Noise due to Equipment

    SBB (Lot 8) Concrete

    Pour - Vert L4S

    Concrete Pumps

    Noise due to Equipment

    SBB (Lot 8) Concrete

    Strip Walls & Columns – Vert L4S

    Crane

    Noise due to Equipment

    SBB (Lot 8)

    Exterior Framing – EXT-L1

    NA

    NA

    SBB (Lot 8)

    Frame Interference Walls and Install door Frames - INT-L1

    NA

    NA

    SBB (Lot 8)

    Install Early MEP to Support Top Down Drywall

    NA

    NA

    SBB (Lot 8) Concrete

    F/R/P Transformer Yard Wall

    NA

    NA

    SBB (Lot 8) Concrete

    F/R/P Transformer Yard Slab

    NA

    NA

     

    Current and Upcoming Anticipated Closures

    The following shutdown(s)/ closures are anticipated as indicated below. Updates to this schedule will be released weekly in the Project Construction Advisories until the work is complete.  Please contact John Franklin with any specific questions or concerns at john.franklin@ucr.edu.

     

    Description

    Location

    Duration & Date

    Impacted Buildings/ Facilities

    Lot 8

    Lot 8

    Permanently

    Lot 8

    Lot 43

    Lot 43

    Indefinitely

    Lot 43

    Anderson Park

    Anderson Park